CamsAhead

Near me

Near me

Arizona Data Center Intelligence

Mapped Arizona data center sites, with their power, water and risk

One app for every Arizona county: data center sites, power, grid and FEMA risk, with hearing alerts and an API. 64 data center buildings are mapped in 3 of its 15 counties, and businesses pay 12.45¢ per kWh for power, 7% below the US average.

$390 a month3 seats · cancel any time

Where are Arizona's data centers?

64 mapped buildings sit in 3 of Arizona's 15 counties. Maricopa County has the most: 62.

Maricopa 62Cochise 1Pima 1

    © OpenStreetMap contributors

    Which risks do the counties with data centers face?

    Heat waves are the most common risk: 3 of the 3 counties with mapped data centers rate high for them.

    Bars: counties with mapped data centers that rate Relatively high or Very high . Tap one to show it on the map.

    All 15 counties as a table

    What will a Arizona site pay for power, and how fast is demand growing?

    Business power in Arizona costs 12.45¢ per kWh, 7% below the US, and demand grew 27.9% since 2019.

    What do businesses pay for power?

    12.45¢ per kWh in 2025, 7% below the US average of 13.37¢.

    • Businesses22nd most expensive of 51
      Arizona
      12.45¢
      US
      13.37¢

    How fast is business power demand growing?

    Business power use in Arizona grew 27.9% since 2019, almost 3 times the US rate (+10.5%).

    0%+20%Arizona+27.9%US+10.5%2019’20’21’22’23’242025

    What makes Arizona's power?

    116.5 TWh generated in 2025: natural gas 45%, nuclear 27%, solar 13%.

    • Natural gas45%
    • Nuclear27%
    • Solar13%
    • Coal7.9%
    • Hydro4.1%
    • Wind2.7%

    Under 1% each: wood, pumped storage, petroleum, other biomass. Other (EIA's catch-all) used more power than it made, so it is left out.

    How much new power is proposed?

    19,571 MW of new plants are proposed for 2026–2030, about half of today's 37,187 MW: other 43%, solar 43%, natural gas 11%, wind 3%.

    • Other (EIA's catch-all)8,495 MW
    • Solar8,390 MW
    • Natural gas2,186 MW
    • Wind500 MW

    Which grid would a Arizona site join, and what are its water and hazard risks?

    No ISO/RTO covers 99.9% of Arizona's power sales; heat waves cost it most.

    Which grid serves Arizona?

    Most of Arizona has no ISO/RTO : utilities balance their own areas for 99.9% of retail sales.

    • No ISO/RTO99.9%

    Share of 2025 retail sales, by each utility's balancing authority .

    How much water do Arizona's power plants use?

    Arizona's power plants took in 165 billion gallons of water in 2024 to cool and returned about 73%; 44.4 billion gallons were used up .

    Returned 73.2%Used up 26.8%

    Which hazards cost Arizona most?

    Heat waves are Arizona's biggest risk (very high) ; the rest rate relatively high or lower.

    • Heat waveVery high
    • Inland floodingRelatively high
    • WildfireRelatively high
    • TornadoRelatively low
    • DroughtRelatively low
    • EarthquakeRelatively low
    • HurricaneVery low

    Which AI campuses are in Arizona?

    Arizona has 3 AI campuses on the list; none of them is listed as being built.

    AI campuses in Arizona: Google Mesa, Microsoft Goodyear, Stream Phoenix.

    Campuses without a county on record: Google Mesa. They are left off the county map.

    Who uses it, and what do they see first?

    Lawyers, brokers, site teams, utilities, insurers and investors each start from their own view of Arizona's 15 counties.

    Land-use and energy lawyers

    Follow counties with data centers, their hearings and FEMA risk.

    • Maricopa County62 mapped · risk very high
    • Cochise County1 mapped · risk relatively moderate
    • Pima County1 mapped · risk relatively high
    3counties with data centers to follow, each with its planning and zoning agendas

    Land and industrial brokers

    Rank counties by mapped data center buildings, with the power price behind them.

    • Maricopa County62
    • Cochise County1
    • Pima County1
    62mapped buildings in Maricopa County, the most in Arizona

    Site selection teams

    Shortlist counties by mapped sites, power and risk on one map.

    3of 15 counties have mapped data centers

    Utilities and power buyers

    Follow prices, demand and the grid behind each site. Bars: business power sales since 2019.

    • Arizona+27.9%
    • US+10.5%
    +27.9%business power sales since 2019, US +10.5%

    Insurers and lenders

    Bars: how many of the counties with data centers rate high for each hazard.

    • Heat wave3 of 3
    • Inland flooding3 of 3
    • Wildfire3 of 3
    • Drought1 of 3
    3of 3 counties with mapped data centers rate high for at least one

    Investors and analysts

    See which new power plants are proposed, by source and size. Bars: MW proposed.

    • Other8,495
    • Solar8,390
    • Natural gas2,186
    • Wind500
    19,571MW of new plants proposed for 2026–2030

    What's inside Arizona Data Center Intelligence?

    One app for all 15 Arizona counties, plus hearing alerts and an API. Every screen below is filled with Arizona's real data.

    The Intelligence app

    Every county's sites, power, water and risk on one screen, with your watchlist.

    app.camsahead.com/intelligence/arizona
    OverviewMapSitesAI campusesProjectsPowerWaterRiskHearingsAlertsAPI
    64mapped buildings
    3AI campuses
    12.45¢business power, per kWh
    +11.6%business demand, last 12 months
    WatchlistMappedFloodHeatDrought
    Maricopa County62Very highVery highhigh
    Cochise County1highhighmoderate
    Pima County1Very highVery highmoderate

    Hearings and filings

    Follow counties and cases; get the agenda and the record when a hearing is posted.

    Hearings · Arizona
    Arizona · counties you follow Planning, zoning and utility agendas
    • Maricopa County62 mapped data center buildingsAgenda alerts
    • Cochise County1 mapped data center buildingsAgenda alerts
    • Pima County1 mapped data center buildingsAgenda alerts

    Alerts

    New projects, stage changes, hearings and data updates for what you follow, by email or in the app.

    Alerts · Arizona
    • Power demandBusiness power sales +11.6% on the year before: 41.2 TWhEIA-861M, 2025-09 to 2026-08
    • Site riskMaricopa County (62 mapped buildings) rates Very high for inland floodingFEMA National Risk Index
    • New supply19,571 MW of new plants proposed for 2026–2030EIA-860

    Data API

    County, power, risk and project data as JSON for your own tools.

    api.camsahead.com
    GET /v1/counties/04013
    {
      "fips": "04013",
      "name": "Maricopa County",
      "state": "AZ",
      "pop2025": 4689558,
      "pop_change_2020_pct": 6,
      "density_per_sqmi": 509.6,
      "nri": {
        "risk_rating": "Very High",
        "ifld": {
          "rating": "Very High",
          "score": 99.9
    Show the full response
        },
        "hwav": {
          "rating": "Very High",
          "score": 100
        },
        "drgt": {
          "rating": "Relatively High",
          "score": 97.7
        }
      },
      "grid": {
        "rtos": [],
        "utilities_n": 13
      },
      "state_power": {
        "commercial_cents_kwh": 12.45,
        "us_commercial_cents_kwh": 13.37,
        "as_of": "2025"
      }
    }

    What does it cost?

    Arizona Data Center Intelligence is $390 a month for 3 seats.

    Arizona Data Center Intelligence$390 a month
    • The Intelligence app: every county's sites, power, water and risk
    • Alerts on new projects, filings and hearings
    • Reports as web page, PDF and CSV
    • 3 seats · cancel any time
    Data APIFrom $999 a month
    • County, power, risk and project data as JSON
    • Keys for your own tools and models
    Public bodies$4,680 a year
    • Counties, cities, utilities and co-ops
    • Paid by invoice

    What stays open? The map, the county pages and every data center page stay open to everyone.

    Sources and updates

    How this page was made: CamsAhead writes each page type once, then fills it with this place's data from the sources below.

    • OpenStreetMap contributors: data center buildings, as of November 6, 2026; Open Database License (ODbL) 1.0, free copy on request.
    • Epoch AI: "AI data centers", CC BY 4.0, retrieved November 7, 2026; changes noted.
    • U.S. Energy Information Administration (EIA): Form EIA-861 (released Oct 2026) and Form EIA-861 2025 detailed data (released Oct 2026): business power prices and sales by state, grid operators and utilities by county; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Forms EIA-923/906/920 (released Sep 2026): power generated by source, 2025; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Form EIA-860 (released Sep 2026): power plants proposed for 2026 to 2030; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Form EIA-860 (released Sep 2026): power plant capacity by state, 2025; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): thermoelectric cooling water data 2024, Forms EIA-860 and EIA-923 (retrieved Oct 2026): power plant cooling water by state.
    • FEMA: National Risk Index v1.20 (December 2025), NRI_Table_Counties and NRI_Table_States: natural hazard ratings by county and expected annual loss by state; retrieved October 31, 2026. This product uses the Federal Emergency Management Agency's OpenFEMA API, but is not endorsed by FEMA. The Federal Government or FEMA cannot vouch for the data or analyses derived from these data after the data have been retrieved from the Agency's website(s).
    • U.S. Census Bureau: US Census Bureau, Vintage 2025 county population estimates (co-est2025-alldata.csv): people by county.

    How CamsAhead counts cameras · Report a problem · Report a camera

    Add CamsAhead to your Home Screen Open in Safari to install Drive works best from your Home Screen Open in Safari to add it to your Home Screen

    It opens straight to the map.

    This app’s built-in browser can’t add CamsAhead to your Home Screen.

    From your Home Screen, CamsAhead opens full screen with one tap. It keeps the screen on while you drive, where your phone allows it.

    1. Tap Share
      In Safari’s toolbar, or in its ⋯ menu.
    2. Tap Share
      In your browser’s address bar or menu.
    3. Open this page in Safari
      Look for “Open in Safari” or “Open in browser” in this app’s menu, or copy the link.
    4. Copy the link, then paste it in Safari
      Or type CamsAhead.com in Safari.
    5. In Safari, tap Share, then Add to Home Screen
    6. Tap Add to Home Screen
      Scroll down the list if you don’t see it.
    7. Open the ⋮ menu
      Then tap “Add to Home screen” or “Install app”.
    8. Tap Add, then open CamsAhead from your Home Screen. Tap Install, then open CamsAhead from your Home Screen.

    Don’t see Add to Home Screen? Open this page in Safari.

    Or tap Share in this browser, then Add to Home Screen.

    Alerts work while CamsAhead is open on screen, from the Home Screen or the browser. If the screen locks or you switch apps, they stop.

    DriveBetaReport a problem