Land-use and energy lawyers
Follow counties with data centers, their hearings and FEMA risk.
- Maricopa County62 mapped · risk very high
- Cochise County1 mapped · risk relatively moderate
- Pima County1 mapped · risk relatively high
Mapped Arizona data center sites, with their power, water and risk
One app for every Arizona county: data center sites, power, grid and FEMA risk, with hearing alerts and an API. 64 data center buildings are mapped in 3 of its 15 counties, and businesses pay 12.45¢ per kWh for power, 7% below the US average.
64 mapped buildings sit in 3 of Arizona's 15 counties. Maricopa County has the most: 62.
© OpenStreetMap contributors
Heat waves are the most common risk: 3 of the 3 counties with mapped data centers rate high for them.
Bars: counties with mapped data centers that rate Relatively high or Very high . Tap one to show it on the map.
Business power in Arizona costs 12.45¢ per kWh, 7% below the US, and demand grew 27.9% since 2019.
12.45¢ per kWh in 2025, 7% below the US average of 13.37¢.
Business power use in Arizona grew 27.9% since 2019, almost 3 times the US rate (+10.5%).
116.5 TWh generated in 2025: natural gas 45%, nuclear 27%, solar 13%.
Under 1% each: wood, pumped storage, petroleum, other biomass. Other (EIA's catch-all) used more power than it made, so it is left out.
19,571 MW of new plants are proposed for 2026–2030, about half of today's 37,187 MW: other 43%, solar 43%, natural gas 11%, wind 3%.
No ISO/RTO covers 99.9% of Arizona's power sales; heat waves cost it most.
Most of Arizona has no ISO/RTO : utilities balance their own areas for 99.9% of retail sales.
Share of 2025 retail sales, by each utility's balancing authority .
Arizona's power plants took in 165 billion gallons of water in 2024 to cool and returned about 73%; 44.4 billion gallons were used up .
Heat waves are Arizona's biggest risk (very high) ; the rest rate relatively high or lower.
Arizona has 3 AI campuses on the list; none of them is listed as being built.
AI campuses in Arizona: Google Mesa, Microsoft Goodyear, Stream Phoenix.
Campuses without a county on record: Google Mesa. They are left off the county map.
Lawyers, brokers, site teams, utilities, insurers and investors each start from their own view of Arizona's 15 counties.
Follow counties with data centers, their hearings and FEMA risk.
Rank counties by mapped data center buildings, with the power price behind them.
Shortlist counties by mapped sites, power and risk on one map.
Follow prices, demand and the grid behind each site. Bars: business power sales since 2019.
Bars: how many of the counties with data centers rate high for each hazard.
See which new power plants are proposed, by source and size. Bars: MW proposed.
One app for all 15 Arizona counties, plus hearing alerts and an API. Every screen below is filled with Arizona's real data.
Every county's sites, power, water and risk on one screen, with your watchlist.
| Watchlist | Mapped | Flood | Heat | Drought |
|---|---|---|---|---|
| Maricopa County | 62 | Very high | Very high | high |
| Cochise County | 1 | high | high | moderate |
| Pima County | 1 | Very high | Very high | moderate |
Follow counties and cases; get the agenda and the record when a hearing is posted.
New projects, stage changes, hearings and data updates for what you follow, by email or in the app.
County, power, risk and project data as JSON for your own tools.
GET /v1/counties/04013
{
"fips": "04013",
"name": "Maricopa County",
"state": "AZ",
"pop2025": 4689558,
"pop_change_2020_pct": 6,
"density_per_sqmi": 509.6,
"nri": {
"risk_rating": "Very High",
"ifld": {
"rating": "Very High",
"score": 99.9 },
"hwav": {
"rating": "Very High",
"score": 100
},
"drgt": {
"rating": "Relatively High",
"score": 97.7
}
},
"grid": {
"rtos": [],
"utilities_n": 13
},
"state_power": {
"commercial_cents_kwh": 12.45,
"us_commercial_cents_kwh": 13.37,
"as_of": "2025"
}
}Arizona Data Center Intelligence is $390 a month for 3 seats.
What stays open? The map, the county pages and every data center page stay open to everyone.
How this page was made: CamsAhead writes each page type once, then fills it with this place's data from the sources below.
How CamsAhead counts cameras · Report a problem · Report a camera
Buildings and sites that OpenStreetMap volunteers have tagged as data centers. It counts mapped objects, not an official register, so some data centers are not on it yet.
FEMA's drought rating is our water view for each county: how much drought is expected to cost a year, against the rest of the US.
FEMA's National Risk Index estimates what each hazard costs a year, on average, in damage to buildings, crops and people. It then rates each county or state against the rest of the US, from Very low to Very high. "Rate high" here means Relatively high or Very high.
A large data center campus built for AI computing, on Epoch AI's list of AI data centers. "Being built" means Epoch lists no computers running there yet.
The average price businesses paid for one kilowatt-hour of electricity in 2025: their total bills divided by the power they bought. Arizona ranks 22nd most expensive of 51 (the 50 states and DC).
An ISO or RTO runs the high-voltage grid and the wholesale power market for a region. Most of Arizona has none: each utility balances its own area.
Electricity sold to businesses: offices, shops and most data centers. EIA does not count data centers on their own; most sit in this group. Arizona sold 29.4 TWh in 2019 and 37.6 TWh in 2025.
Latest 12 months (2025-09 to 2026-08): 41.2 TWh, +11.6% on the 12 months before.
A terawatt-hour is a billion kilowatt-hours: a measure of how much electricity is made or used over time.
New generators that plant owners have reported to EIA for 2026–2030. They are plans, not commitments: some are delayed or dropped.
EIA's own "Other" group, for sources outside its main fuel types. EIA does not split it further in this table, so neither do we.
The organisation that keeps supply and demand matched, minute by minute, in its area. Each utility reports its sales under one.
Taken in (withdrawn): water a power plant pulls from a river, lake or well to cool. Used up (consumed): the part that evaporates and does not go back. These are power plant figures, the grid's water, not data center water.