US data center map
1,803 buildings in 46 states and DC are mapped as data centers. Virginia has the most: 381. Texas is next, with 221. 17 large AI campuses are being built or planned, and data centers used about 4.7% of the country's electricity in 2024.
- 1,803buildings mapped as data centers
- 46states and DC with mapped buildings
- 17large AI campuses being built or planned
- 4.7%of the country's electricity used by data centers in 2024
© OpenStreetMap contributors · © OpenMapTiles
AI campuses: Epoch AI, CC BY 4.0 (Nov 7, 2026), changes noted
© OpenStreetMap contributors · Addresses: Photon
Your location stays on your device.
What the marks mean
Operating: a building mapped as a data center in OpenStreetMap, in use today. As of Nov 6, 2026.
Proposed to under construction, paused, withdrawn or canceled: a planned project and the stage in its latest public record. As of Nov 7, 2026.
About the stages: a project moves from Proposed to Rezoning filed, Approved, Permitted and Under construction. Some stop: Paused, Withdrawn or Canceled.
AI campus: a large AI campus that is not running yet. As of Nov 7, 2026.
Campuses and projects not placed at their street address are listed, not mapped.
Each kind of mark is counted on its own, and the counts are never added together.
Which states have the most data centers?
Virginia has the most mapped data center buildings: 381. Texas is next, with 221.
Tap a state to see its counties.
Virginia37 projects on record381
Virginia
- Loudoun County231 mapped buildings
- Prince William County72 mapped buildings
- Fairfax County34 mapped buildings
- Mecklenburg County18 mapped buildings
- Henrico County15 mapped buildings
Texas5 AI campuses being built221
Texas
- Bexar County61 mapped buildings
- Taylor County40 mapped buildings
- Dallas County30 mapped buildings
- Collin County15 mapped buildings
- Ellis County15 mapped buildings
Oregon126
Oregon
- Umatilla County34 mapped buildings
- Morrow County33 mapped buildings
- Washington County32 mapped buildings
- Crook County11 mapped buildings
- Multnomah County4 mapped buildings
California116
California
- Santa Clara County74 mapped buildings
- Los Angeles County11 mapped buildings
- Alameda County7 mapped buildings
- Sacramento County5 mapped buildings
- San Diego County5 mapped buildings
Ohio2 AI campuses being built91
Ohio
- Franklin County33 mapped buildings
- Licking County30 mapped buildings
- Union County9 mapped buildings
- Cuyahoga County5 mapped buildings
- Hamilton County3 mapped buildings
Show all 47 statesShow fewer
Washington71
Washington
- Grant County33 mapped buildings
- King County15 mapped buildings
- Douglas County12 mapped buildings
- Snohomish County4 mapped buildings
- Pierce County3 mapped buildings
Arizona64
Arizona
- Maricopa County62 mapped buildings
- Cochise County1 mapped building
- Pima County1 mapped building
Iowa2 AI campuses being built60
Iowa
- Polk County24 mapped buildings
- Pottawattamie County20 mapped buildings
- Dallas County9 mapped buildings
- Warren County5 mapped buildings
- Johnson County1 mapped building
New Jersey58
New Jersey
- Hudson County15 mapped buildings
- Somerset County13 mapped buildings
- Middlesex County12 mapped buildings
- Monmouth County5 mapped buildings
- Passaic County5 mapped buildings
Georgia57
Georgia
- Douglas County20 mapped buildings
- Fulton County20 mapped buildings
- Fayette County4 mapped buildings
- Gwinnett County4 mapped buildings
- Newton County4 mapped buildings
Illinois57
Illinois
- Cook County32 mapped buildings
- DuPage County19 mapped buildings
- DeKalb County3 mapped buildings
- Champaign County1 mapped building
- Lake County1 mapped building
Pennsylvania1 AI campus being built47
Pennsylvania
- Venango County32 mapped buildings
- Montgomery County4 mapped buildings
- Allegheny County3 mapped buildings
- Luzerne County3 mapped buildings
- Lehigh County2 mapped buildings
Nevada38
Nevada
- Clark County22 mapped buildings
- Washoe County11 mapped buildings
- Storey County5 mapped buildings
New York37
New York
- Niagara County13 mapped buildings
- New York County4 mapped buildings
- Rockland County4 mapped buildings
- Albany County3 mapped buildings
- Dutchess County2 mapped buildings
Tennessee28
Tennessee
- Davidson County6 mapped buildings
- Williamson County6 mapped buildings
- Montgomery County5 mapped buildings
- Sumner County4 mapped buildings
- Shelby County2 mapped buildings
Colorado27
Colorado
- Arapahoe County11 mapped buildings
- Douglas County6 mapped buildings
- El Paso County4 mapped buildings
- Denver County3 mapped buildings
- Adams County1 mapped building
North Carolina26
North Carolina
- Durham County5 mapped buildings
- Mecklenburg County5 mapped buildings
- Rutherford County4 mapped buildings
- Wake County4 mapped buildings
- Catawba County3 mapped buildings
Nebraska25
Nebraska
- Douglas County12 mapped buildings
- Sarpy County12 mapped buildings
- Buffalo County1 mapped building
Wyoming23
Missouri22
Missouri
- Clay County7 mapped buildings
- Platte County5 mapped buildings
- Jackson County3 mapped buildings
- St. Louis city3 mapped buildings
- Adair County1 mapped building
Utah1 AI campus being built22
Utah
- Salt Lake County13 mapped buildings
- Utah County6 mapped buildings
- Washington County2 mapped buildings
- Uintah County1 mapped building
Florida18
Florida
- Miami-Dade County4 mapped buildings
- Orange County4 mapped buildings
- Hillsborough County3 mapped buildings
- Alachua County2 mapped buildings
- Broward County2 mapped buildings
New Mexico1 AI campus being built17
New Mexico
- Bernalillo County9 mapped buildings
- Valencia County5 mapped buildings
- Doña Ana County2 mapped buildings
- Santa Fe County1 mapped building
Minnesota16
Minnesota
- Hennepin County6 mapped buildings
- Carver County4 mapped buildings
- Dakota County2 mapped buildings
- Anoka County1 mapped building
- Olmsted County1 mapped building
Indiana1 AI campus being built15
Indiana
- St. Joseph County8 mapped buildings
- Bartholomew County2 mapped buildings
- Tippecanoe County2 mapped buildings
- Hancock County1 mapped building
- Lake County1 mapped building
Maryland15
Maryland
- Baltimore city6 mapped buildings
- Anne Arundel County2 mapped buildings
- Howard County2 mapped buildings
- Prince George's County2 mapped buildings
- Baltimore County1 mapped building
South Carolina15
South Carolina
- Berkeley County10 mapped buildings
- Charleston County1 mapped building
- Greenville County1 mapped building
- Horry County1 mapped building
- Richland County1 mapped building
Alabama13
Alabama
- Madison County7 mapped buildings
- Jackson County3 mapped buildings
- Jefferson County2 mapped buildings
- Houston County1 mapped building
North Dakota13
North Dakota
- Dickey County10 mapped buildings
- Cass County2 mapped buildings
- Williams County1 mapped building
Wisconsin1 AI campus being built12
Wisconsin
- Milwaukee County3 mapped buildings
- Dane County2 mapped buildings
- Racine County2 mapped buildings
- Calumet County1 mapped building
- Columbia County1 mapped building
Michigan1 AI campus being built11
Michigan
- Wayne County4 mapped buildings
- Eaton County2 mapped buildings
- Oakland County2 mapped buildings
- Cass County1 mapped building
- Genesee County1 mapped building
Oklahoma1 AI campus being built11
Oklahoma
- Tulsa County8 mapped buildings
- Bryan County1 mapped building
- Muskogee County1 mapped building
- Oklahoma County1 mapped building
Kansas7
Kansas
- Johnson County5 mapped buildings
- Barber County1 mapped building
- Ellis County1 mapped building
Kentucky6
Kentucky
- Jefferson County2 mapped buildings
- Boone County1 mapped building
- Floyd County1 mapped building
- Hopkins County1 mapped building
- McCracken County1 mapped building
Connecticut5
Connecticut
- Western Connecticut Planning Region2 mapped buildings
- Capitol Planning Region1 mapped building
- Greater Bridgeport Planning Region1 mapped building
- South Central Connecticut Planning Region1 mapped building
Mississippi5
Mississippi
- Madison County4 mapped buildings
- DeSoto County1 mapped building
Louisiana1 AI campus being built4
Louisiana
- East Baton Rouge Parish3 mapped buildings
- Caddo Parish1 mapped building
Idaho3
Idaho
- Ada County2 mapped buildings
- Madison County1 mapped building
Maine3
Maine
- Cumberland County2 mapped buildings
- Aroostook County1 mapped building
Massachusetts3
Massachusetts
- Middlesex County2 mapped buildings
- Essex County1 mapped building
Montana3
Montana
- Custer County1 mapped building
- Granite County1 mapped building
- Yellowstone County1 mapped building
New Hampshire3
New Hampshire
- Rockingham County2 mapped buildings
- Strafford County1 mapped building
Arkansas2
Arkansas
- Pulaski County1 mapped building
- White County1 mapped building
South Dakota2
South Dakota
- Minnehaha County2 mapped buildings
West Virginia2
West Virginia
- Kanawha County1 mapped building
- Morgan County1 mapped building
Vermont1
Vermont
- Windham County1 mapped building
Washington, DC1
Washington, DC
- District of Columbia1 mapped building
Which projects are on record so far?
CamsAhead's project records start with Prince William County, Virginia: 37 projects so far.
27 planned projects in Prince William County, Virginia: 18 approved and 9 rezoning filed. 7 more are under construction. Off track: 3 canceled.
How far along are the planned projects in Prince William County, Virginia?
How the stages work
A project moves from Proposed to Rezoning filed, Approved, Permitted and Under construction. Some stop: Paused, Withdrawn or Canceled.
Each stage is the word in the project's latest public record. A project leaves this list once it runs.
18 projects have approval, and 7 are being built. 3 projects are canceled.
Tap a stage to show only its projects on the map.
Table
| Stage | Projects |
|---|---|
| Proposed | 0 |
| Rezoning filed | 9 |
| Approved | 18 |
| Permitted | 0 |
| Under construction | 7 |
| Paused | 0 |
| Withdrawn | 0 |
| Canceled | 3 |
- University Business Park (and substation)Rezoning filedPrince William County · 117 acres as filed · first public record Mar 30, 2023
- Gardner Property (and substation)Rezoning filedPrince William County · 83 acres as filed · first public record Mar 22, 2023
- Gainesville East Data Center (and substation)Rezoning filedPrince William County · 59 acres as filed · first public record Nov 14, 2022
- Gainesville West Data Center (and substation)Rezoning filedPrince William County · 59 acres as filed · first public record Nov 14, 2022
- Innovation on the Parkway PRARezoning filedPrince William County · 18 acres as filed · first public record Nov 1, 2022
Show all 37Show fewer
- Ashton Data Center (and substation)Rezoning filedPrince William County · 52 acres as filed · first public record Aug 30, 2022
- Bristow CampusRezoning filedPrince William County · 58 acres as filed · first public record Aug 16, 2022
- Potomac Technology Park (and substation)Rezoning filedPrince William County · 52 acres as filed · first public record Jan 6, 2022
- Compton Property Rezoning (and substation)Rezoning filedPrince William County · 77 acres as filed · first public record Jun 2, 2021
- VA 8/9 RezoningApprovedPrince William County · 19 acres as filed · approved Jul 29, 2025
- Wellington Glen Technology ParkApprovedPrince William County · 49 acres as filed · approved Apr 1, 2025
- Manassas Point PRAApprovedPrince William County · 40 acres as filed · approved Oct 8, 2024
- StoneviewApprovedPrince William County · 12 acres as filed · approved Jun 11, 2024
- Mid-County Industrial ParkApprovedPrince William County · 41 acres as filed · approved Jun 4, 2024
- Parsons Business ParkApprovedPrince William County · 91 acres as filed · approved Mar 19, 2024
- Devlin Technology ParkApprovedPrince William County · 270 acres as filed · approved Nov 29, 2023
- KH Data Capital Development (IMVA-3 4 5)ApprovedPrince William County · 37 acres as filed · approved Jan 26, 2023
- Wellington Glen Parcel KApprovedPrince William County · 40 acres as filed · approved Jul 12, 2022
- I-66 & Route 29 Technology ParkApprovedPrince William County · 103 acres as filed · approved Dec 7, 2021
- South Point Phase IIApprovedPrince William County · 22 acres as filed · approved Oct 19, 2021
- Hunter Property RezoningApprovedPrince William County · 196 acres as filed · approved Sep 7, 2021
- Village Place Technology ParkApprovedPrince William County · 48 acres as filed · approved Jun 15, 2021
- Gainesville Tech ParkApprovedPrince William County · 136 acres as filed · approved Jan 12, 2021
- Blackburn Land Bay 5ApprovedPrince William County · 28 acres as filed · approved Jul 21, 2020
- PRA and Release of Declaration, Hornbaker RoadApprovedPrince William County · 36 acres as filed · approved Jul 16, 2019
- Westview 66ApprovedPrince William County · 41 acres as filed · approved Jul 16, 2019
- Airport Gateway Commerce Center I (amended)ApprovedPrince William County · 97 acres as filed · approved Dec 6, 2011
- Manassas Corporate Center MCC-7Under constructionPrince William County · 23 acres as filed · approved Jul 29, 2025
- NVA05C RezoningUnder constructionPrince William County · 24 acres as filed · approved Feb 4, 2025
- DC-4 PRAUnder constructionPrince William County · 20 acres as filed · approved Oct 24, 2023
- QTS - Project Hero Expansion (DC6)Under constructionPrince William County · 13 acres as filed · approved Feb 16, 2021
- Youth for TomorrowUnder constructionPrince William County · 182 acres as filed · approved Nov 26, 2019
- Avanti at Innovation Proffer Amendment & RezoningUnder constructionPrince William County · 88 acres as filed · approved Jul 16, 2019
- Ashwood AdditionUnder constructionPrince William County · 99 acres as filed · approved Mar 6, 2018
- Compass Datacenters Prince William County Campus 1CanceledPrince William County · 884 acres as filed · approved Dec 13, 2023A court voided this rezoning in August 2025 (Court of Appeals of Virginia affirmed, March 31, 2026); after the last appeal was withdrawn in July 2026, the county restored the prior zoning.
- Digital Gateway NorthCanceledPrince William County · 534 acres as filed · approved Dec 13, 2023A court voided this rezoning in August 2025 (Court of Appeals of Virginia affirmed, March 31, 2026); after the last appeal was withdrawn in July 2026, the county restored the prior zoning.
- Digital Gateway SouthCanceledPrince William County · 342 acres as filed · approved Dec 13, 2023A court voided this rezoning in August 2025 (Court of Appeals of Virginia affirmed, March 31, 2026); after the last appeal was withdrawn in July 2026, the county restored the prior zoning.
Which AI data centers are being built in the US?
17 large AI campuses are being built or planned in the US. The first, Google Fort Wayne, is expected online in Dec 2026; the biggest, OpenAI Stargate New Mexico, should reach 1,750 MW for its computers by Dec 2028.
What the dates mean
Not yet operating means the site is still being built or planned. Its computers are not running yet. The year shown is when Epoch AI expects them to start.
First online is the month Epoch AI expects the first computers to switch on. Full size is the month it expects the whole campus to be built. Dates can slip.
Epoch AI, a research group, makes these estimates from satellite photos, permits and company news. They can be off by a fair amount.
- OpenAI Stargate New MexicoDoña Ana County, New Mexicoexpected first online Dec 2028 → full size Dec 2028, 1,750 MW for the computers
- Richland Parish, Louisianaexpected first online Jan 2028 → full size Jan 2028, 1,632 MW for the computers
- OpenAI Stargate ShackelfordShackelford County, Texasexpected first online Aug 2027 → full size Nov 2028, 1,400 MW for the computers
- QTS Cedar RapidsCedar Rapids, Iowaexpected first online Dec 2026 → full size Nov 2027, 1,133 MW for the computers
- GoodnightArmstrong County, Texasexpected first online Mar 2027 → full size Oct 2027, 1,006 MW for the computers
Show all 17Show fewer
- OpenAI Stargate MichiganWashtenaw County, Michiganexpected first online Dec 2028 → full size Dec 2028, 988 MW for the computers
- OpenAI Stargate WisconsinOzaukee County, Wisconsinexpected first online Dec 2028 → full size Dec 2028, 902 MW for the computers
- Google Fort WayneFort Wayne, Indianaexpected first online Dec 2026 → full size Jun 2028, 863 MW for the computers
- OpenAI Stargate MilamMilam County, Texasexpected first online Dec 2028 → full size Dec 2028, 857 MW for the computers
- Crusoe Abilene ExpansionAbilene, Texasexpected first online Sep 2027 → full size Nov 2027, 672 MW for the computers
- Meta Bowling GreenBowling Green, Ohioexpected first online Feb 2027 → full size Jan 2028, 422 MW for the computers
- QTS Eagle MountainUtah County, Utahexpected first online Dec 2026 → full size Jul 2027, 304 MW for the computers
- Google Cedar RapidsCedar Rapids, Iowaexpected first online Dec 2026 → full size May 2027, 261 MW for the computers
- OpenAI Stargate LordstownLordstown, Ohioexpected first online Mar 2027 → full size Mar 2027, 214 MW for the computers
- Anthropic Barber LakeMitchell County, Texasexpected first online Dec 2026 → full size Apr 2027, 207 MW for the computers
- CoreWeave Muskogee OKMuskogee County, Oklahomaexpected first online Dec 2026 → full size Dec 2027, 153 MW for the computers
- CoreWeave Lancaster Greenfield siteLancaster, Pennsylvaniaexpected first online Jun 2027 → full size Jun 2027, 92 MW for the computers
How much new AI power is on the way?
How to read this chart
Each bar adds up the power the AI sites not running yet should gain that year, from Epoch AI's dated timeline for each site.
A megawatt (MW) measures how much power a site is built to handle at one time. Think of the size of a pipe, not the water that flows through it over a year.
1,000 MW is one gigawatt (GW).
AI sites that are not running yet should add a lot of power by 2028. They should be built for about 12,900 megawatts (MW) of computers in all.
At sites not running yet (expected)
Megawatts (MW) added each year. The chart stops at 2028, because a site is only added once building starts.
Table
| Year | Added at sites not running yet, MW |
|---|---|
| 2026 | 1,149 |
| 2027 | 3,994 |
| 2028 | 7,713 |
When will they come online?
How to read this chart
Each bar counts the AI campuses not running yet by the year they are expected first online.
6 of these 17 AI campuses are expected first online by the end of 2026. The last 5 are expected in 2028.
Tap a year to see which ones.
Table
| Year | Campuses |
|---|---|
| 2026 | 6 |
| 2027 | 6 |
| 2028 | 5 |
What share of US electricity do data centers use?
Data centers used about 4.7% of the country's electricity in 2024. By 2030 that could be 9.5% to 15.3%.
The band is the 2030 range; the tick is the middle case, 11.8%.
Which places have their own data center page?
About these places
A county or city gets its own page once enough projects are on record there. Some get one because many people search for them.
5 places have a page so far.
- Loudoun County, Virginia231 mapped buildings inside
- Prince William County, Virginia72 mapped buildings inside · 37 projects on record
- Dallas, Texas13 mapped buildings inside
- Innovation, Virginia20 mapped buildings inside · 7 projects on record
- Linton Hall, Virginia7 mapped buildings inside · 7 projects on record
More about US data centers
Why are the counts kept apart?
Each count comes from a different source and counts something different: buildings mapped as data centers, large AI campuses, and projects on record. One campus can hold many buildings, so the counts are never added up.
Are there data centers outside the US?
Yes. 3,159 buildings outside the US are mapped as data centers. CamsAhead's counts cover the US.
AI campuses abroad being built (3)Hide the campuses abroad
- Norway: Microsoft Narvik Norway (expected full size Dec 2026, 92 MW for the computers)
- Sweden: EcoDataCenter 2 (expected full size Jun 2028, 48 MW for the computers)
- United Arab Emirates: OpenAI Stargate UAE (expected full size Jan 2028, 1,000 MW for the computers)
Questions about US data centers
Where are data centers located in the US?
Most data center buildings mapped in the US sit in Virginia, Texas, Oregon, California and Ohio. Virginia leads with 381 mapped in OpenStreetMap, as of November 6, 2026. CamsAhead's project records cover Prince William County, Virginia. The state list has each count.
How many data centers are in the US?
1,803 data center buildings in the US are mapped in OpenStreetMap, as of November 6, 2026. Epoch AI tracks 17 large AI campuses not yet operating. CamsAhead's project records, which cover Prince William County, Virginia, list 34 projects planned or under construction there. One campus can hold many buildings, so the counts stay apart.
Which state has the most data centers?
Virginia has the most mapped data center buildings, with 381 mapped in OpenStreetMap as of November 6, 2026. Texas is next, with 221. For AI campuses, Texas leads Epoch AI's list with 14, shown on AI data centers by state.
What US state has the least data centers?
Alaska, Delaware, Hawaii and Rhode Island have no data center building mapped in OpenStreetMap, as of November 6, 2026. Of the rest, Vermont and Washington, DC have the fewest: 1 building each. The state list above has each count.
What are the largest planned data center projects in the US?
On Epoch AI's list, OpenAI Stargate New Mexico in New Mexico is the largest project not yet operating. Epoch AI puts it at 1,750 MW for the computers. Meta Hyperion (1,632 MW) and OpenAI Stargate Shackelford (1,400 MW) come next. Operating sites carry no size here.
How much electricity do data centers use?
US data centers used about 4.7% of the country's electricity in 2024, or 192 TWh. That is from LBNL, a US national lab. It expects 9.5% to 15.3% by 2030. These are national figures, not any one site's.
Are there AI data centers near me?
Epoch AI tracks 77 large AI campuses in the US, as of November 7, 2026. AI data centers by state lists each one by state, with its town and size. The state list above shows the campuses being built in each state.
Sources and updates
- OpenStreetMap contributors: data center buildings, as of November 6, 2026; Open Database License (ODbL) 1.0, free copy on request.
- Epoch AI: "AI data centers", CC BY 4.0, retrieved November 7, 2026; changes noted.
- Prince William County, VA: Build-Out Analysis: data center sites, campuses and buildings, checked November 7, 2026; each project's record is under "Project sources".
- Lawrence Berkeley National Laboratory: "United States Data Center Energy Usage Report: 2025 Update", June 18, 2026, CC BY 4.0.
Project sources (50)Hide project sources
- Manassas Corporate Center MCC-7, Rezoning REZ2024-00025: gisweb.pwcva.gov, Jul 29, 2025
- Manassas Corporate Center MCC-7, Data Center Buildings: 1 under construction under REZ2024-00025: gisweb.pwcva.gov, Oct 31, 2026
- NVA05C Rezoning, Rezoning REZ2024-00042: gisweb.pwcva.gov, Feb 4, 2025
- NVA05C Rezoning, Data Center Buildings: 1 under construction under REZ2024-00042: gisweb.pwcva.gov, Oct 31, 2026
- DC-4 PRA, Rezoning REZ2023-00002: gisweb.pwcva.gov, Oct 24, 2023
- DC-4 PRA, Data Center Buildings: 1 under construction under REZ2023-00002: gisweb.pwcva.gov, Oct 31, 2026
- QTS - Project Hero Expansion (DC6), Rezoning REZ2020-00019: gisweb.pwcva.gov, Feb 16, 2021
- QTS - Project Hero Expansion (DC6), Data Center Buildings: 1 under construction under REZ2020-00019: gisweb.pwcva.gov, Oct 31, 2026
- Youth for Tomorrow, Rezoning REZ2019-00034: gisweb.pwcva.gov, Nov 26, 2019
- Youth for Tomorrow, Data Center Buildings: 3 under construction under REZ2019-00034: gisweb.pwcva.gov, Oct 31, 2026
- Avanti at Innovation Proffer Amendment & Rezoning, Rezoning REZ2019-00028: gisweb.pwcva.gov, Jul 16, 2019
- Avanti at Innovation Proffer Amendment & Rezoning, Data Center Buildings: 1 under construction under REZ2019-00028: gisweb.pwcva.gov, Oct 31, 2026
- Ashwood Addition, Rezoning REZ2018-00001: gisweb.pwcva.gov, Mar 6, 2018
- Ashwood Addition, Data Center Buildings: 3 under construction under REZ2018-00001: gisweb.pwcva.gov, Oct 31, 2026
- VA 8/9 Rezoning, Rezoning REZ2024-00041: gisweb.pwcva.gov, Jul 29, 2025
- Wellington Glen Technology Park, Rezoning REZ2024-00018: gisweb.pwcva.gov, Apr 1, 2025
- Manassas Point PRA, Rezoning REZ2024-00001: gisweb.pwcva.gov, Oct 8, 2024
- Stoneview, Rezoning REZ2023-00026: gisweb.pwcva.gov, Jun 11, 2024
- Mid-County Industrial Park, Rezoning REZ2024-00006: gisweb.pwcva.gov, Jun 4, 2024
- Parsons Business Park, Rezoning REZ2023-00028: gisweb.pwcva.gov, Mar 19, 2024
- Devlin Technology Park, Rezoning REZ2022-00022: gisweb.pwcva.gov, Nov 29, 2023
- KH Data Capital Development (IMVA-3 4 5), Rezoning REZ2021-00022: gisweb.pwcva.gov, Jan 26, 2023
- Wellington Glen Parcel K, Rezoning REZ2021-00014: gisweb.pwcva.gov, Jul 12, 2022
- I-66 & Route 29 Technology Park, Rezoning REZ2021-00001: gisweb.pwcva.gov, Dec 7, 2021
- South Point Phase II, Rezoning REZ2020-00021: gisweb.pwcva.gov, Oct 19, 2021
- Hunter Property Rezoning, Rezoning REZ2020-00022: gisweb.pwcva.gov, Sep 7, 2021
- Village Place Technology Park, Rezoning REZ2020-00024: gisweb.pwcva.gov, Jun 15, 2021
- Gainesville Tech Park, Rezoning REZ2020-00011: gisweb.pwcva.gov, Jan 12, 2021
- Blackburn Land Bay 5, Rezoning REZ2019-00022: gisweb.pwcva.gov, Jul 21, 2020
- PRA and Release of Declaration, Hornbaker Road, Rezoning REZ2019-00032: gisweb.pwcva.gov, Jul 16, 2019
- Westview 66, Rezoning REZ2019-00025: gisweb.pwcva.gov, Jul 16, 2019
- Airport Gateway Commerce Center I (amended), Rezoning PLN2011-00437: gisweb.pwcva.gov, Dec 6, 2011
- University Business Park (and substation), Rezoning REZ2023-00019: gisweb.pwcva.gov, Mar 30, 2023
- Gardner Property (and substation), Rezoning REZ2023-00018: gisweb.pwcva.gov, Mar 22, 2023
- Gainesville East Data Center (and substation), Special Use SUP2023-00006: gisweb.pwcva.gov, Nov 14, 2022
- Gainesville West Data Center (and substation), Special Use SUP2023-00005: gisweb.pwcva.gov, Nov 14, 2022
- Innovation on the Parkway PRA, Rezoning REZ2023-00001: gisweb.pwcva.gov, Nov 1, 2022
- Ashton Data Center (and substation), Rezoning REZ2022-00031: gisweb.pwcva.gov, Aug 30, 2022
- Bristow Campus, Rezoning REZ2022-00030: gisweb.pwcva.gov, Aug 16, 2022
- Potomac Technology Park (and substation), Rezoning REZ2022-00015: gisweb.pwcva.gov, Jan 6, 2022
- Compton Property Rezoning (and substation), Rezoning REZ2021-00019: gisweb.pwcva.gov, Jun 2, 2021
- Compass Datacenters Prince William County Campus 1, Rezoning REZ2022-00036: gisweb.pwcva.gov, Dec 13, 2023
- Compass Datacenters Prince William County Campus 1, Opinion: Ordinance 23-57 void: vacourts.gov, Mar 31, 2026
- Compass Datacenters Prince William County Campus 1, PW Digital Gateway: pwcva.gov, checked Oct 30, 2026
- Digital Gateway North, Rezoning REZ2022-00032: gisweb.pwcva.gov, Dec 13, 2023
- Digital Gateway North, Opinion: Ordinance 23-59 void: vacourts.gov, Mar 31, 2026
- Digital Gateway North, PW Digital Gateway: pwcva.gov, checked Oct 30, 2026
- Digital Gateway South, Rezoning REZ2022-00033: gisweb.pwcva.gov, Dec 13, 2023
- Digital Gateway South, Opinion: Ordinance 23-58 void: vacourts.gov, Mar 31, 2026
- Digital Gateway South, PW Digital Gateway: pwcva.gov, checked Oct 30, 2026
CamsAhead's project records cover Prince William County, Virginia so far.
How CamsAhead counts cameras · Report a problem · Report a camera