Indiana data centers map

Indiana has 15 mapped data center buildings, tied for the 25th most of any state. St. Joseph County has the most: 8. 1 large AI campus is being built; the first is expected online in Dec 2026. Businesses pay 13.70¢ per kWh for power, 2% above the US average.

Checked

  • 15mapped data center buildings
  • 8in St. Joseph County, the most
  • 1large AI campus being built
  • 13.70¢per kWh for businesses2% above the US average

About mapped buildings

Buildings and sites that OpenStreetMap volunteers have tagged as data centers. It counts mapped objects, not an official register, so some data centers are not on it yet.

About large AI campuses

A large data center campus built for AI computing, on Epoch AI's list of AI data centers. “Being built” means Epoch AI lists no computers running there yet.

About business power prices

This is the average price businesses paid for power in Indiana in 2025. A kilowatt-hour (kWh) is the power a 1,000-watt heater uses in one hour.

“Businesses” is the commercial group in the US Energy Information Administration's figures: offices, stores and most data centers. Some large data centers buy power as industry instead.

Map of data centers in Indiana: 15 mapped buildings, by county

© OpenStreetMap contributors · © OpenMapTiles

AI campuses: Epoch AI, CC BY 4.0 (Nov 7, 2026), changes noted

What the marks mean

Operating: a building mapped as a data center in OpenStreetMap, in use today. As of Nov 6, 2026.

Proposed to under construction, paused, withdrawn or canceled: a planned project and the stage in its latest public record. As of Nov 7, 2026.

About the stages: a project moves from Proposed to Rezoning filed, Approved, Permitted and Under construction. Some stop: Paused, Withdrawn or Canceled.

AI campus: a large AI campus that is not running yet. As of Nov 7, 2026.

Campuses and projects not placed at their street address are listed, not mapped.

Each kind of mark is counted on its own, and the counts are never added together.

Which Indiana counties have the most data centers?

St. Joseph County has the most mapped buildings: 8. Bartholomew County and Tippecanoe County are next, with 2 each.

Buildings mapped as data centers, per county

  • None
  • 1
  • 2–4
  • 5–9

How many in each county?

St. Joseph County8
Bartholomew County2
Tippecanoe County2
Hancock County1
Lake County1
Monroe County1
Allen County1 AI campus being built0

Which natural risks do these counties face?

About the risk ratings

FEMA's National Risk Index scores each county for each natural hazard from 0 to 100, against every county in the US. The score starts from the expected annual loss: the damage a hazard is likely to cause in an average year. It also weighs how many people could be hurt and how well the area can bounce back.

Ratings run from very low to very high.

“Rate high” means relatively high or very high.

4 of the 6 counties with mapped data centers rate high or very high for at least one natural hazard. Strong wind is the most common, with 4.

Strong wind4 of 6
Cold wave3 of 6
Winter weather3 of 6
Tornado2 of 6
Hail1 of 6

What does power cost in Indiana, and how fast is demand growing?

Businesses pay 13.70¢ per kWh, 2% above the US average, and their power use grew 9% from 2019 to 2025.

What do businesses pay for power?

13.70¢ per kWh in 2025, the 16th highest of 50 states and DC.

Indiana13.70¢
US average13.37¢

Is Indiana's power demand rising?

About business power use

This is the power sold to businesses each year, the commercial group in the US Energy Information Administration's figures. Most data centers are in it, so a fast rise often means new data centers, but offices and stores count too.

Indiana: 23.52 terawatt-hours (TWh) in 2019, 25.64 TWh in 2025. One TWh is a billion kWh.

Slowly. Business power use grew 9% from 2019 to 2025; the US grew 10.5%.

20192025

What makes Indiana's power?

About the power mix

This is where the power generated in Indiana came from in 2025: each source's share of what its power plants made, 107 terawatt-hours (TWh) in all. Small rooftop solar panels are not counted.

“Other sources” is the agency's catch-all group.

Coal made 46% of the power generated in Indiana in 2025; natural gas made 36%.

Coal46%
Natural gas36%
Wind9.5%
Solar6.2%
Other gases1.8%

Under 1% each: other sources, hydro, other biomass and petroleum.

How much new power is proposed in Indiana?

About proposed power plants

These are new power plants that companies have told the US Energy Information Administration they plan to open from 2026 to 2030. Plans can change or be dropped.

Sizes are net summer capacity: the most power a plant can send to the grid on a hot summer day. Each bar's length is its part of all the proposed power.

Companies have proposed 6,288 MW of new power plants for 2026 to 2030; solar is the largest source, 4,253 MW.

Solar4,253 MW
Natural gas1,364 MW
Wind400 MW
Other sources270 MW

For scale, Indiana's power plants could deliver 30,963 MW on a summer day in 2025.

Which grid serves Indiana, and what are its water and hazard risks?

MISO runs the grid for 77.9% of Indiana's power sales. 4 natural hazards rate relatively high for Indiana against other states.

Who runs Indiana's power grid?

About the grid

A grid operator, called an ISO or RTO, runs the high-voltage power lines and the power market for a whole region. The share is how much of the state's 2025 power sales were made inside its area.

Where there is none, each utility runs its own part of the grid.

MISO, for 77.9% of 2025 power sales.

MISO77.9%
PJM22.1%

How much water do Indiana's power plants use?

About water taken in and used up

Taken in is the water power plants draw from rivers, lakes, wells or the sea to cool. Used up is the part that does not go back: most of it evaporates.

This is the water power plants use, not the water data centers use.

The 21 power plants in Indiana that report their cooling water used up 47 billion gallons in 2024, 2.5% of the 1,904 billion they took in.

Which hazards cost Indiana most?

About expected annual loss

FEMA's National Risk Index estimates each natural hazard's expected annual loss: the damage it is likely to cause in an average year. It rates each state against the other states, from very low to very high.

Hazards with the same rating are in the order of FEMA's score. Because each hazard is compared with other states, one can rate higher here and still cost fewer dollars than another.

Not rated: avalanche (not applicable), tsunami (insufficient data) and volcanic activity (not applicable).

Tornado rates highest for Indiana against other states: relatively high for the damage it is likely to cause in an average year.

  • Relatively highTornado, strong wind, cold wave and winter weather
  • Relatively moderateInland flooding, hail, drought, heat wave, ice storm and lightning
  • Relatively lowEarthquake and landslide
  • Very lowHurricane, wildfire and coastal flooding

Which data center projects are planned in Indiana?

1 large AI campus is being built in Indiana. The first, Google Fort Wayne, is expected online in Dec 2026.

  • Google Fort WayneFort Wayne, Indiana863 MWexpected online Dec 2026 · full size Jun 2028

Hatched: the MW expected at full size, not built yet. About the dates

What the dates mean

Not yet operating means the site is still being built or planned. Its computers are not running yet. The year shown is when Epoch AI expects them to start.

First online is the month Epoch AI expects the first computers to switch on. Full size is the month it expects the whole campus to be built. Dates can slip.

Epoch AI, a research group, makes these estimates from satellite photos, permits and company news. They can be off by a fair amount.

About MW

A megawatt (MW) measures how much power a site is built to handle at one time. Think of the size of a pipe, not the water that flows through it over a year.

1,000 MW is one gigawatt (GW).

For an AI campus, this is the power its computers are built for, not cooling or offices.

Who runs Indiana's data centers?

About this count

Each building counts once, by the operator named in OpenStreetMap. 11 buildings have no operator named.

DartPoints1
Digital Crossroad1
Indiana University1
Verizon Wireless1

More about Indiana data centers

Questions about Indiana data centers

How many data centers are in Indiana?

Indiana has 15 data center buildings mapped in OpenStreetMap, tied for the 25th most of any state, as of November 6, 2026. Epoch AI tracks 3 large AI campuses here. These counts are kept apart.

What county in Indiana has the most data centers?

St. Joseph County has the most: 8 data center buildings. They are mapped in OpenStreetMap. That is as of November 6, 2026. Bartholomew County and Tippecanoe County are next, with 2 each.

How many AI data centers are there in Indiana?

Epoch AI tracks 3 large AI campuses in Indiana, as of November 7, 2026. AI data centers in Indiana lists each one. Other data centers here show as mapped buildings or project records, and each is counted on its own.

Sources and updates

How this page was made: CamsAhead writes each page type once, then fills it with this place's data from the sources below.

  • OpenStreetMap contributors: data center buildings, as of November 6, 2026; Open Database License (ODbL) 1.0, free copy on request.
  • Epoch AI: "AI data centers", CC BY 4.0, retrieved November 7, 2026; changes noted.
  • U.S. Energy Information Administration (EIA): Form EIA-861 (released Oct 2026) and Form EIA-861 2025 detailed data (released Oct 2026): business power prices and sales by state, grid operators and utilities by county; retrieved October 31, 2026.
  • U.S. Energy Information Administration (EIA): Forms EIA-923/906/920 (released Sep 2026): power generated by source, 2025; retrieved October 31, 2026.
  • U.S. Energy Information Administration (EIA): Form EIA-860 (released Sep 2026): power plants proposed for 2026 to 2030; retrieved October 31, 2026.
  • U.S. Energy Information Administration (EIA): Form EIA-860 (released Sep 2026): power plant capacity by state, 2025; retrieved October 31, 2026.
  • U.S. Energy Information Administration (EIA): thermoelectric cooling water data 2024, Forms EIA-860 and EIA-923 (retrieved Oct 2026): power plant cooling water by state.
  • FEMA: National Risk Index v1.20 (December 2025), NRI_Table_Counties and NRI_Table_States: natural hazard ratings by county and expected annual loss by state; retrieved October 31, 2026. This product uses the Federal Emergency Management Agency's OpenFEMA API, but is not endorsed by FEMA. The Federal Government or FEMA cannot vouch for the data or analyses derived from these data after the data have been retrieved from the Agency's website(s).

CamsAhead's project records cover Prince William County, Virginia, not Indiana.

How CamsAhead counts cameras · Report a problem · Report a camera

Add CamsAhead to your Home Screen Open in Safari to install Drive works best from your Home Screen Open in Safari to add it to your Home Screen

It opens straight to the map.

This app’s built-in browser can’t add CamsAhead to your Home Screen.

From your Home Screen, CamsAhead opens full screen with one tap. It keeps the screen on while you drive, where your phone allows it.

  1. Tap Share
    In Safari’s toolbar, or in its ⋯ menu.
  2. Tap Share
    In your browser’s address bar or menu.
  3. Open this page in Safari
    Look for “Open in Safari” or “Open in browser” in this app’s menu, or copy the link.
  4. Copy the link, then paste it in Safari
    Or type CamsAhead.com in Safari.
  5. In Safari, tap Share, then Add to Home Screen
  6. Tap Add to Home Screen
    Scroll down the list if you don’t see it.
  7. Open the ⋮ menu
    Then tap “Add to Home screen” or “Install app”.
  8. Tap Add, then open CamsAhead from your Home Screen. Tap Install, then open CamsAhead from your Home Screen.

Don’t see Add to Home Screen? Open this page in Safari.

Or tap Share in this browser, then Add to Home Screen.

Alerts work while CamsAhead is open on screen, from the Home Screen or the browser. If the screen locks or you switch apps, they stop.

DriveBetaReport a problem