Meta owns 15 large AI campuses in the US: 13 operating, with 2,155 MW for their computers, and 2 not yet operating. The largest running is Prometheus in New Albany, Ohio. The largest planned is Hyperion in Louisiana. Meta likely uses 1 more, whose owner is not confirmed.

Checked

What does a megawatt mean?

2,155 MW is about the average use of 1.8 million homes.

5,120 MW is about the average use of 4.3 million homes.

A megawatt (MW) measures how much power a site is built to handle at one time. Think of the size of a pipe, not the water that flows through it over a year.

1,000 MW is one gigawatt (GW).

The homes number is a site running at full power all year, beside what an average US home uses in a year.

An average US home used 10,491 kWh in 2025 (EIA).

Where are Meta's AI data centers?

About this list

Epoch AI tracks large AI campuses only: the ones with the most computing power. Meta runs other data centers that are not on this list.

A campus counts here when Epoch AI lists Meta as its owner with its "confident" tag or no tag.

An H100 equivalent counts AI chips as if each one were an Nvidia H100, a common AI chip. It lets you compare sites that use different chips.

15 campuses in 13 states. Alabama and Ohio have 2 each.

Shaded: 13 states with a Meta campus. Dots mark the 3 placed at a street address. The other 12 have no dot: each is placed only to its county or has no map point.
CampusPlaceStatusComputers now, MWWhen finished, MW
Meta PrometheusNew Albany, OhioOperating4711,022 by Jul 2028
Meta JeffersonvilleJeffersonville, IndianaOperating178–
Meta RosemountDakota County, MinnesotaOperating178–
Meta TempleBell County, TexasOperating178–
Meta MontgomeryMontgomery County, AlabamaOperating153358 by Feb 2027
Show all 15 campusesShow fewer
CampusPlaceStatusComputers now, MWWhen finished, MW
Meta CheyenneLaramie County, WyomingOperating152207 by Feb 2027
Meta KunaKuna, IdahoOperating152–
Meta HuntsvilleToney, AlabamaOperating146–
Meta Eagle MountainUtah County, UtahOperating133–
Meta AikenTrenton, South CarolinaOperating129–
Meta Los LunasValencia County, New MexicoOperating118218 by Jan 2028
Meta GallatinSumner County, TennesseeOperating87–
Meta SarpySarpy County, NebraskaOperating80–
Meta HyperionRichland Parish, LouisianaNot yet operating–1,632 by Jan 2028
Meta Bowling GreenBowling Green, OhioNot yet operating–422 by Jan 2028
Addresses, chips and size when finished
CampusListed addressChipsH100 equivalentsWhole site when finished, MW
Meta MontgomeryCo Rd 42, Montgomery, AL 36105B300174,517465 by Feb 2027
Meta Huntsville5400 Prosperity Dr NW, Toney, ALB300166,761–
Meta Kuna601 Kuna Mora Rd, Kuna ID 83634B300173,248–
Meta Jeffersonville500 8th St, Jeffersonville, IN 47130B300203,133–
Meta HyperionHolly Ridge, LA 71269Rubin–2,203 by Jan 2028
Meta Rosemount1772-2396 145th St, Rosemount, MN 55068B200215,675–
Meta Sarpy14436-14998 Fairview Rd, Springfield, NE 68059B30091,966–
Meta Los Lunas4250 Messenger Lp, Los Lunas, NM 87031B300133,906273 by Jan 2028
Meta Prometheus1 Community Cir, New Albany, OH 43054B300536,3431,328 by Jul 2028
Meta Bowling Green12356 Middleton Pike, Bowling Green, OH 43402B300 and Rubin–570 by Jan 2028
Meta Aiken7601 State Hwy 105, Trenton, SC 29847B300147,044–
Meta Gallatin1 Meta Lp, Gallatin, TN 37066B30099,545–
Meta Temple2310 Eberhardt Rd, Temple, TX 76504B300202,473–
Meta Eagle Mountain1275 N Community Cir, Eagle Mountain, UT 84005B300151,354–
Meta CheyenneCheyenne, WY 82007B300172,815249 by Feb 2027

Meta's own list of its data centers is at datacenters.atmeta.com.

What is the largest Meta data center?

How to read this chart

The dark part is the power the computer rooms are built for. The light part is the extra power for cooling and the building; the small number is the whole site.

First online is the month Epoch AI expects the first computers to switch on. Full size is the month it expects the whole campus to be built. Dates can slip.

Running now: Prometheus, with 471 MW for its computers. Planned: Hyperion, with 1,632 MW expected at full size, by Jan 2028.

Not yet operating

  • Meta HyperionRichland Parish, Louisiana · Meta · expected first online Jan 2028 · expected full size Jan 20281,632 MW
  • Meta Bowling GreenBowling Green, Ohio · Meta · expected first online Feb 2027 · expected full size Jan 2028422 MW

Expected first onlineBuilding to full size

How fast is Meta adding AI computer power?

How to read this chart

Each bar is the power the computers are built for at the end of that year. Years after 2026 are Epoch AI's forecast.

Epoch AI, a research group, makes these estimates from satellite photos, permits and company news. They can be off by a fair amount.

6 of Meta's 15 campuses should reach full size by 2028. By the end of 2028, about 5,120 MW for the computers is expected, up from 361 MW at the end of 2025.

3612025
2,3602026
2,9752027
5,1202028

At the 13 running sitesAt the 2 sites being built

Megawatts (MW) for the computers at the end of each year.

Table
Site2025202620272028
Meta Aiken–129129129
Meta Bowling Green––163422
Meta Cheyenne–152207207
Meta Eagle Mountain133133133133
Meta Gallatin–878787
Meta Huntsville–146146146
Meta Hyperion–––1,632
Meta Jeffersonville–178178178
Meta Kuna–152152152
Meta Los Lunas–118118218
Meta Montgomery–153358358
Meta Prometheus766768681,022
Meta Rosemount–178178178
Meta Sarpy–808080
Meta Temple152178178178
In all3612,3602,9755,120

Which other AI campuses may Meta use?

Meta may use 3 more campuses it does not own.

  • Meta-QTS Hillsboro 2Hillsboro, Oregon · likely user · owner not confirmed · operating
  • QTS Cedar RapidsCedar Rapids, Iowa · possible user · owner not confirmed · not yet operating
  • QTS Eagle MountainUtah County, Utah · possible user · owner not confirmed · not yet operating

Questions about Meta's data centers

What is the largest Meta data center?

Prometheus, in New Albany, Ohio, has the most power for its computers of Meta's large AI campuses: 471 MW. Hyperion has the most planned: 1,632 MW at full size, by Jan 2028. The chart of running campuses shows each one.

How many data centers does Meta have?

Meta owns 15 large AI campuses in the US. It runs other data centers that are not on this list; its own list is at datacenters.atmeta.com.

Where are Meta's data centers?

Meta's 15 large AI campuses are in 13 states: Alabama, Idaho, Indiana, Louisiana, Minnesota, Nebraska, New Mexico, Ohio, South Carolina, Tennessee, Texas, Utah and Wyoming. The campus table shows each one.

How big is the Eagle Mountain data center?

Meta Eagle Mountain, in Utah County, Utah, has 133 MW for its computers and 179 MW for the whole site. Meta Eagle Mountain on the AI data centers page has more.

Sources and updates

  • Epoch AI: "AI data centers", CC BY 4.0, retrieved November 7, 2026; changes noted.
  • Meta: Meta's own list of its data centers.
Campus sources (45)Hide campus sources
  1. Meta Montgomery, Meta Introduction to the Montgomery Project: datacenters.atmeta.com
  2. Meta Montgomery, Meta expansion announcement: datacenters.atmeta.com
  3. Meta Montgomery, Contractor announcement: henselphelps.com
  4. Meta Huntsville, Announcement of expansion completing in 2026: plateauexcavation.com
  5. Meta Huntsville, TVA solar installation announcements: prnewswire.com
  6. Meta Kuna, Official Pamphlet from Meta: datacenters.atmeta.com
  7. Meta Kuna, Application for Power Purchase Agreement, Pleasant Valley Solar 1: puc.idaho.gov
  8. Meta Kuna, Application for Power Purchase Agreement, Pleasant Valley Solar 2: lf-puc.idaho.gov
  9. Meta Kuna, Approval to move start date of Solar 2 to May 31, 2026: puc.idaho.gov
  10. Meta Kuna, staff comments: lf-puc.idaho.gov
  11. Meta Kuna, Notice of Application for 3rd PPA (Blacks Creek Energy Center): puc.idaho.gov
  12. Meta Kuna, Idaho Statesman: Peak construction reached in March 2025: idahostatesman.com
  13. Meta Kuna, Idaho Statesman: Expected water usage reported in 2022: idahostatesman.com
  14. Meta Jeffersonville, Official Meta Fact Sheet: datacenters.atmeta.com
  15. Meta Jeffersonville, Turner Construction contractor presenting their involvement in the project.: turnerconstruction.com
  16. Meta Jeffersonville, Air Quality Permit for initial buildout: drive.google.com
  17. Meta Hyperion, Data center profile by Meta: datacenters.atmeta.com
  18. Meta Hyperion, Entergy's application for generation and transmission resources: drive.google.com
  19. Meta Hyperion, MISO update with 1.8 GW substation plan: drive.google.com
  20. Meta Hyperion, S&P Global ratings research with 2.064 GW campus details: spglobal.com
  21. Meta Rosemount, Official Meta announcement.: datacenters.atmeta.com
  22. Meta Rosemount, Air quality permit for initial buildout.: drive.google.com
  23. Meta Sarpy, Meta Sarpy info sheet (PDF): datacenters.atmeta.com
  24. Meta Los Lunas, Meta fact sheet: datacenters.atmeta.com
  25. Meta Los Lunas, Air quality permit for expansion: drive.google.com
  26. Meta Los Lunas, Construction contractor page for the site: fortisconstruction.com
  27. Meta Prometheus, Meta blog post with details on Prometheus: engineering.fb.com
  28. Meta Prometheus, New Albany Business Park land use map: drive.google.com
  29. Meta Prometheus, Letter on Socrates South Power Generation Project: drive.google.com
  30. Meta Bowling Green, Meta letter to Middleton Township: drive.google.com
  31. Meta Bowling Green, Construction notice for new transmission lines to data center substation: drive.google.com
  32. Meta Bowling Green, Ohio Power Siting Board announcement: archive.ph
  33. Meta Bowling Green, Apollo Power Generation Project Letter of Notice Appendix A, with a project timeline: drive.google.com
  34. Meta Aiken, Meta Introduction to the Aiken Project: datacenters.atmeta.com
  35. Meta Aiken, DPR Construction project page: dpr.com
  36. Meta Gallatin, Meta fact sheet: datacenters.atmeta.com
  37. Meta Gallatin, Campus extension announcement: gallatingetsit.com
  38. Meta Temple, JE Dunn project page: jedunn.com
  39. Meta Temple, TDLR filing: tdlr.texas.gov
  40. Meta Temple, TDLR filing: tdlr.texas.gov
  41. Meta Eagle Mountain, Expansion announcement by Meta: facebook.com
  42. Meta Eagle Mountain, Report on Williams Company gas-fired plant under construction adjacent to data cente: ukozvhzgrcnkcatjqfoo.supabase.co
  43. Meta Cheyenne, Meta Introduction to the Cheyenne Project: datacenters.atmeta.com
  44. Meta Cheyenne, Fortis Construction announcement: fortisconstruction.com
  45. Meta Cheyenne, Press announcement suggesting a 2027 operational date: cheyenneleads.org

How CamsAhead counts cameras · Report a problem · Report a camera

Add CamsAhead to your Home Screen Open in Safari to install Drive works best from your Home Screen Open in Safari to add it to your Home Screen

It opens straight to the map.

This app’s built-in browser can’t add CamsAhead to your Home Screen.

From your Home Screen, CamsAhead opens full screen with one tap. It keeps the screen on while you drive, where your phone allows it.

  1. Tap Share
    In Safari’s toolbar, or in its ⋯ menu.
  2. Tap Share
    In your browser’s address bar or menu.
  3. Open this page in Safari
    Look for “Open in Safari” or “Open in browser” in this app’s menu, or copy the link.
  4. Copy the link, then paste it in Safari
    Or type CamsAhead.com in Safari.
  5. In Safari, tap Share, then Add to Home Screen
  6. Tap Add to Home Screen
    Scroll down the list if you don’t see it.
  7. Open the ⋮ menu
    Then tap “Add to Home screen” or “Install app”.
  8. Tap Add, then open CamsAhead from your Home Screen. Tap Install, then open CamsAhead from your Home Screen.

Don’t see Add to Home Screen? Open this page in Safari.

Or tap Share in this browser, then Add to Home Screen.

Alerts work while CamsAhead is open on screen, from the Home Screen or the browser. If the screen locks or you switch apps, they stop.

DriveBetaReport a problem