Stargate data centers: where the 8 sites are and who owns them

There are 8 Stargate data center sites: 7 in the US and 1 in the United Arab Emirates. 1 is running, with 824 MW for its computers: Abilene, Texas. The other 7 are not yet operating. Oracle owns 5 of the sites and Softbank 2. The list below shows where each one is.

Checked

What does a megawatt mean?

824 MW is about the average use of 690,000 homes.

7,935 MW is about the average use of 6.6 million homes.

A megawatt (MW) measures how much power a site is built to handle at one time. Think of the size of a pipe, not the water that flows through it over a year.

1,000 MW is one gigawatt (GW).

The homes number is a site running at full power all year, beside what an average US home uses in a year.

An average US home used 10,491 kWh in 2025 (EIA).

Where are the Stargate data centers?

7 sites are in 5 US states: Texas, Ohio, Michigan, New Mexico and Wisconsin. 1 is in the United Arab Emirates.

Texas

  • AbileneOpenAI Stargate Abilene · running · 824 MW
  • Shackelford CountyOpenAI Stargate Shackelford · being built · 1,400 MW at full size, Nov 2028
  • Milam CountyOpenAI Stargate Milam · being built · 857 MW at full size, Dec 2028

New Mexico

  • Doña Ana CountyOpenAI Stargate New Mexico · being built · 1,750 MW at full size, Dec 2028

Michigan

  • Washtenaw CountyOpenAI Stargate Michigan · being built · 988 MW at full size, Dec 2028

Wisconsin

  • Ozaukee CountyOpenAI Stargate Wisconsin · being built · 902 MW at full size, Dec 2028

Ohio

  • LordstownOpenAI Stargate Lordstown · being built · 214 MW at full size, Mar 2027

United Arab Emirates

  • OpenAI Stargate UAEbeing built · 1,000 MW at full size, Jan 2028

RunningBeing built

Table
SitePlaceStatusComputers now, MWWhen finished, MWOwner
OpenAI Stargate AbileneAbilene, TexasOperating824–Oracle
OpenAI Stargate New MexicoDoña Ana County, New MexicoNot yet operating–1,750 by Dec 2028Oracle
OpenAI Stargate ShackelfordShackelford County, TexasNot yet operating–1,400 by Nov 2028Oracle
OpenAI Stargate UAEUnited Arab EmiratesNot yet operating–1,000 by Jan 2028not confirmed
OpenAI Stargate MichiganWashtenaw County, MichiganNot yet operating–988 by Dec 2028Oracle
OpenAI Stargate WisconsinOzaukee County, WisconsinNot yet operating–902 by Dec 2028Oracle
OpenAI Stargate MilamMilam County, TexasNot yet operating–857 by Dec 2028Softbank
OpenAI Stargate LordstownLordstown, OhioNot yet operating–214 by Mar 2027Softbank

What is the Stargate data center in Abilene, Texas?

OpenAI Stargate Abilene is running, with 824 MW for its computers and 1,154 MW for the whole site. It is the one Stargate site running today.

824 MW now
Sep 2025first online
$31.2Bbuilding cost so far
American Electric Powerpower company

Estimates

Epoch AI, a research group, makes these estimates from satellite photos, permits and company news. They can be off by a fair amount.

More about Abilene

For the computers now: 824 MW, whole site 1,154 MWFirst online: Sep 2025Chips: B200 and B300About 1,018,696 H100 equivalentsBuilding cost so far: about $31.2 billionListed address: 5502 Spinks Rd, Abilene, TX 79601

H100 equivalents

An H100 equivalent counts AI chips as if each one were an Nvidia H100, a common AI chip. It lets you compare sites that use different chips.

Investors: OpenAI, Oracle and Softbank

Built by: Mortenson

Epoch AI's note, Nov 2026:

Buildings 7-8 are estimated to be operational. On March 24, Building 8 roughly looked like where Building 3 was in September. Building 3 is estimated to be operational in April, 7 months later. This naively suggests Building 8 will be operational by early November, 7 months after March 24. Oracle gave no date for the last two buildings on its September 10 call.

A separate expansion sits at the same address, owned by Microsoft and not part of Stargate (not yet operating).

How big will Stargate get, and when?

How to read this chart

Each bar is the power the computers are built for at the end of that year. Years after 2026 are Epoch AI's forecast.

Stargate should reach about 7,900 MW for its computers by the end of 2028, about 10 times the 824 MW running in Abilene today. The largest planned site is OpenAI Stargate New Mexico: 1,750 MW for its computers at full size, by Dec 2028.

2062025
1,0242026
1,6582027
7,9352028

At AbileneAt the 7 sites being built

Megawatts (MW) for the computers at the end of each year.

Table
Site2025202620272028
OpenAI Stargate Abilene206824824824
OpenAI Stargate Lordstown––214214
OpenAI Stargate Michigan–––988
OpenAI Stargate Milam–––857
OpenAI Stargate New Mexico–––1,750
OpenAI Stargate Shackelford––4201,400
OpenAI Stargate UAE–2002001,000
OpenAI Stargate Wisconsin–––902
In all2061,0241,6587,935

Who owns and builds the Stargate sites?

Owners

An owner builds or holds a site. Owners show at Epoch AI's "confident" tag or with no tag; a site whose owner is only "likely" shows as not confirmed.

Oracle owns 5 and Softbank owns 2. The owner of 1 site is not confirmed.

  • OpenAI Stargate AbileneInvestors: OpenAI, Oracle and Softbank · Built by: Mortenson · Power company: American Electric Power
  • OpenAI Stargate New MexicoPower company: Bloom Energy
  • OpenAI Stargate ShackelfordInvestors: OpenAI and Oracle
  • OpenAI Stargate UAEInvestors: Cisco, G42, NVIDIA, Oracle and Softbank
Owner of each site
  • OpenAI Stargate AbileneOwner: Oracle
  • OpenAI Stargate New MexicoOwner: Oracle
  • OpenAI Stargate ShackelfordOwner: Oracle
  • OpenAI Stargate UAEOwner: not confirmed
  • OpenAI Stargate MichiganOwner: Oracle
  • OpenAI Stargate WisconsinOwner: Oracle
  • OpenAI Stargate MilamOwner: Softbank
  • OpenAI Stargate LordstownOwner: Softbank

Which other AI data centers does OpenAI use?

OpenAI is a likely user at 4 more campuses, outside Stargate.

OpenAI is also a possible user at 9 more campuses, owned by CoreWeave (8) and Microsoft (1).

Questions about the Stargate data centers

Where is the Stargate project located?

There are 8 Stargate sites: in Texas, Ohio, Michigan, New Mexico, Wisconsin and the United Arab Emirates. 1 is running, in Abilene, Texas. The other 7 are not yet operating. The site list shows each one.

Who is building the Stargate Project?

Mortenson is the builder at 1 site. The owners are Oracle and Softbank. The owners section lists each site.

What is the current status of the Stargate Project?

1 of the 8 Stargate sites is running: OpenAI Stargate Abilene. The next one, OpenAI Stargate UAE, should first come online in Dec 2026.

Who owns the Stargate data center?

Oracle owns 5 sites and Softbank owns 2 sites. Oracle owns OpenAI Stargate Abilene. OpenAI is the user at 8 of them.

What is the name of the data center in Abilene, Texas?

It is OpenAI Stargate Abilene, part of OpenAI's Stargate, at 5502 Spinks Rd, Abilene, TX 79601. Crusoe Abilene Expansion sits at the same address, a separate campus owned by Microsoft. The Abilene section has its size and dates.

Which data centers does OpenAI use?

OpenAI is the user of 8 Stargate sites. It likely uses 4 more: Microsoft Fairwater Atlanta, Microsoft Fairwater Wisconsin, CoreWeave Denton TX and Microsoft Goodyear. The list of OpenAI's other sites shows each one.

Sources and updates

  • Epoch AI: "AI data centers", CC BY 4.0, retrieved November 7, 2026; changes noted.
Campus sources (26)Hide campus sources
  1. OpenAI Stargate Abilene, Crusoe 2024 Impact Report, with details on Abilene: drive.google.com
  2. OpenAI Stargate Abilene, Air Permit Application for buildings 1-2, featuring blueprints on p.157: drive.google.com
  3. OpenAI Stargate Abilene, Mortensen’s profile of the project, with details of substations: mortenson.com
  4. OpenAI Stargate New Mexico, Project Jupiter Website: projectjupitertogether.com
  5. OpenAI Stargate New Mexico, Stormwater Permitting: drive.google.com
  6. OpenAI Stargate New Mexico, Oracle, BorderPlex and Bloom Energy to power Project Jupiter with fuel cell technology (Apr 27, 2026): oracle.com
  7. OpenAI Stargate Shackelford, Vantage data center page with power capacity, number of buildings, and first building timeline: vantage-dc.com
  8. OpenAI Stargate Shackelford, OpenAI Stargate expansion announcement mentioning Shackelford site: openai.com
  9. OpenAI Stargate Shackelford, Vantage LinkedIn post connecting the data center to OpenAI Stargate: web.archive.org
  10. OpenAI Stargate Shackelford, TDLR filing for first building (other buildings are also on TDLR): tdlr.texas.gov
  11. OpenAI Stargate UAE, News update with timelapse of construction: khaleejtimes.com
  12. OpenAI Stargate UAE, Announcement of the (separate) 100 MW Khazna Ajman data center: khaznadatacenters.com
  13. OpenAI Stargate UAE, News about the US approval of NVIDIA chips in the UAE: bloomberg.com
  14. OpenAI Stargate Michigan, Related Digital website for this site: related-digital.com
  15. OpenAI Stargate Michigan, Michigan Public Service Commission Energy Contract Approval, reports 1,383 MW as the site capacity: michigan.gov
  16. OpenAI Stargate Michigan, Air Permitting, calls the site Project Mitten, includes site map: drive.google.com
  17. OpenAI Stargate Michigan, DTE Electric’s contract approval: mi-psc.my.site.com
  18. OpenAI Stargate Michigan, Website with more details for locals about the site: thesalinebarn.com
  19. OpenAI Stargate Wisconsin, Data center page on Vantage website: vantage-dc.com
  20. OpenAI Stargate Wisconsin, Environmental Analysis Summary: drive.google.com
  21. OpenAI Stargate Milam, Data Center Dynamics article on the site: datacenterdynamics.com
  22. OpenAI Stargate Milam, SB Energy article, source for 1.2 GW capacity: sbenergy.com
  23. OpenAI Stargate Milam, TDLR page for the first building of the site, indicating construction completion date: tdlr.texas.gov
  24. OpenAI Stargate Lordstown, Announcement of 5 new Stargate sites mentioning Lordstown: datacenterdynamics.com
  25. OpenAI Stargate Lordstown, Water Quality Permitting stating that “manufacturing and assembly” is the main purpose of the construction: drive.google.com
  26. OpenAI Stargate Lordstown, Stormwater Permitting: drive.google.com

How CamsAhead counts cameras · Report a problem · Report a camera

Add CamsAhead to your Home Screen Open in Safari to install Drive works best from your Home Screen Open in Safari to add it to your Home Screen

It opens straight to the map.

This app’s built-in browser can’t add CamsAhead to your Home Screen.

From your Home Screen, CamsAhead opens full screen with one tap. It keeps the screen on while you drive, where your phone allows it.

  1. Tap Share
    In Safari’s toolbar, or in its ⋯ menu.
  2. Tap Share
    In your browser’s address bar or menu.
  3. Open this page in Safari
    Look for “Open in Safari” or “Open in browser” in this app’s menu, or copy the link.
  4. Copy the link, then paste it in Safari
    Or type CamsAhead.com in Safari.
  5. In Safari, tap Share, then Add to Home Screen
  6. Tap Add to Home Screen
    Scroll down the list if you don’t see it.
  7. Open the ⋮ menu
    Then tap “Add to Home screen” or “Install app”.
  8. Tap Add, then open CamsAhead from your Home Screen. Tap Install, then open CamsAhead from your Home Screen.

Don’t see Add to Home Screen? Open this page in Safari.

Or tap Share in this browser, then Add to Home Screen.

Alerts work while CamsAhead is open on screen, from the Home Screen or the browser. If the screen locks or you switch apps, they stop.

DriveBetaReport a problem