Indiana Data Center Intelligence

Mapped Indiana data center sites, with their power, water and risk

One app for every Indiana county: data center sites, power, grid and FEMA risk, with hearing alerts and an API. 15 data center buildings are mapped in 6 of its 92 counties, and businesses pay 13.70¢ per kWh for power, 2% above the US average.

$390 a month3 seats · cancel any time

Where are Indiana's data centers?

15 mapped buildings sit in 6 of Indiana's 92 counties. St. Joseph County has the most: 8.

St. Joseph 8Bartholomew 2Tippecanoe 2Hancock 1Lake 1

    © OpenStreetMap contributors

    Which risks do the counties with data centers face?

    Tornadoes are the most common risk: 2 of the 6 counties with mapped data centers rate high for them.

    Bars: counties with mapped data centers that rate Relatively high or Very high . Tap one to show it on the map.

    All 92 counties as a table

    What will a Indiana site pay for power, and how fast is demand growing?

    Business power in Indiana costs 13.70¢ per kWh, 2% above the US, and demand grew 9% since 2019.

    What do businesses pay for power?

    13.70¢ per kWh in 2025, 2% above the US average of 13.37¢.

    • Businesses16th most expensive of 51
      Indiana
      13.70¢
      US
      13.37¢

    How fast is business power demand growing?

    Business power use in Indiana grew 9% since 2019, slower than the US (+10.5%).

    0%+10%Indiana+9%US+10.5%2019’20’21’22’23’242025

    What makes Indiana's power?

    106.9 TWh generated in 2025: coal 46%, natural gas 36%, wind 10%.

    • Coal46%
    • Natural gas36%
    • Wind9.5%
    • Solar6.2%
    • Other gases1.8%

    Under 1% each: other (eia's catch-all), hydro, other biomass, petroleum.

    How much new power is proposed?

    6,288 MW of new plants are proposed for 2026–2030, about a fifth of today's 30,963 MW: solar 68%, natural gas 22%, wind 6%, other 4%.

    • Solar4,253 MW
    • Natural gas1,364 MW
    • Wind400 MW
    • Other (EIA's catch-all)270 MW

    Which grid would a Indiana site join, and what are its water and hazard risks?

    MISO serves 77.9% of Indiana's power sales; tornadoes cost it most.

    Which grid serves Indiana?

    MISO serves 77.9% of Indiana's retail power sales.

    • MISO77.9%
    • PJM22.1%

    Share of 2025 retail sales, by each utility's balancing authority .

    How much water do Indiana's power plants use?

    Indiana's power plants took in 1,904 billion gallons of water in 2024 to cool and returned about 97%; 47.0 billion gallons were used up .

    Returned 97.5%Used up 2.5%

    Which hazards cost Indiana most?

    Tornadoes are Indiana's biggest risk (relatively high) ; the rest rate moderate or lower.

    • TornadoRelatively high
    • Inland floodingRelatively moderate
    • Heat waveRelatively moderate
    • DroughtRelatively moderate
    • EarthquakeRelatively low
    • Coastal floodingVery low
    • HurricaneVery low
    • WildfireVery low

    Which AI campuses are being built in Indiana, and how big will they be?

    Indiana has 3 AI campuses on the list; 1 is being built. It, Google Fort Wayne, is planned at 863 MW , full size by Jun 2028.

    • Google Fort WayneAllen County
      863 MWexpected first online Dec 2026 · full size Jun 2028

    Bars: IT power expected at full size . Dates are Epoch AI's own estimates .

    Other AI campuses in Indiana: Anthropic-Amazon New Carlisle, Meta Jeffersonville.

    Who uses it, and what do they see first?

    Lawyers, brokers, site teams, utilities, insurers and investors each start from their own view of Indiana's 92 counties.

    Land-use and energy lawyers

    Follow counties with data centers, their hearings and FEMA risk.

    • St. Joseph County8 mapped · risk relatively moderate
    • Bartholomew County2 mapped · risk relatively low
    • Tippecanoe County2 mapped · risk relatively moderate
    6counties with data centers to follow, each with its planning and zoning agendas

    Land and industrial brokers

    Rank counties by mapped data center buildings, with the power price behind them.

    • St. Joseph County8
    • Bartholomew County2
    • Tippecanoe County2
    • Hancock County1
    • Lake County1
    8mapped buildings in St. Joseph County, the most in Indiana

    Site selection teams

    Shortlist counties by mapped sites, power and risk on one map.

    6of 92 counties have mapped data centers

    Utilities and power buyers

    Follow prices, demand and the grid behind each site. Bars: business power sales since 2019.

    • Indiana+9%
    • US+10.5%
    +9%business power sales since 2019, US +10.5%

    Insurers and lenders

    Bars: how many of the counties with data centers rate high for each hazard.

    • Tornado2 of 6
    • Inland flooding1 of 6
    • Drought0 of 6
    • Heat wave0 of 6
    2of 6 counties with mapped data centers rate high for at least one

    Investors and analysts

    Track AI campuses being built, their owners and users. Bars: MW expected at full size.

    • Google Fort Wayne863 MW
    863MW planned at 1 AI campus being built

    What's inside Indiana Data Center Intelligence?

    One app for all 92 Indiana counties, plus hearing alerts and an API. Every screen below is filled with Indiana's real data.

    The Intelligence app

    Every county's sites, power, water and risk on one screen, with your watchlist.

    app.camsahead.com/intelligence/indiana
    OverviewMapSitesAI campusesProjectsPowerWaterRiskHearingsAlertsAPI
    15mapped buildings
    3AI campuses
    13.70¢business power, per kWh
    +14.2%business demand, last 12 months
    WatchlistMappedFloodHeatDrought
    St. Joseph County8moderatemoderateVery low
    Bartholomew County2moderatelowlow
    Tippecanoe County2moderatemoderatelow
    Hancock County1lowlowlow
    Lake County1highmoderatenot rated

    Hearings and filings

    Follow counties and cases; get the agenda and the record when a hearing is posted.

    Hearings · Indiana
    Indiana · counties you follow Planning, zoning and utility agendas
    • St. Joseph County8 mapped data center buildingsAgenda alerts
    • Bartholomew County2 mapped data center buildingsAgenda alerts
    • Tippecanoe County2 mapped data center buildingsAgenda alerts
    • Hancock County1 mapped data center buildingsAgenda alerts

    Alerts

    New projects, stage changes, hearings and data updates for what you follow, by email or in the app.

    Alerts · Indiana
    • Power demandBusiness power sales +14.2% on the year before: 28.0 TWhEIA-861M, 2025-09 to 2026-08
    • Site riskSt. Joseph County (8 mapped buildings) rates Relatively high for tornadoFEMA National Risk Index
    • AI campus being builtGoogle Fort Wayne: 863 MW of IT power expected · first online Dec 2026 · full size Jun 2028Epoch AI

    Data API

    County, power, risk and project data as JSON for your own tools.

    api.camsahead.com
    GET /v1/counties/18141
    {
      "fips": "18141",
      "name": "St. Joseph County",
      "state": "IN",
      "pop2025": 272861,
      "pop_change_2020_pct": 0,
      "density_per_sqmi": 596.1,
      "nri": {
        "risk_rating": "Relatively Moderate",
        "ifld": {
          "rating": "Relatively Moderate",
          "score": 85.4
    Show the full response
        },
        "hwav": {
          "rating": "Relatively Moderate",
          "score": 79.2
        },
        "drgt": {
          "rating": "Very Low",
          "score": 12.9
        }
      },
      "grid": {
        "rtos": [
          "MISO",
          "PJM"
        ],
        "utilities_n": 8
      },
      "state_power": {
        "commercial_cents_kwh": 13.7,
        "us_commercial_cents_kwh": 13.37,
        "as_of": "2025"
      }
    }

    What does it cost?

    Indiana Data Center Intelligence is $390 a month for 3 seats.

    Indiana Data Center Intelligence$390 a month
    • The Intelligence app: every county's sites, power, water and risk
    • Alerts on new projects, filings and hearings
    • Reports as web page, PDF and CSV
    • 3 seats · cancel any time
    Data APIFrom $999 a month
    • County, power, risk and project data as JSON
    • Keys for your own tools and models
    Public bodies$4,680 a year
    • Counties, cities, utilities and co-ops
    • Paid by invoice

    What stays open? The map, the county pages and every data center page stay open to everyone.

    Sources and updates

    How this page was made: CamsAhead writes each page type once, then fills it with this place's data from the sources below.

    • OpenStreetMap contributors: data center buildings, as of November 6, 2026; Open Database License (ODbL) 1.0, free copy on request.
    • Epoch AI: "AI data centers", CC BY 4.0, retrieved November 7, 2026; changes noted.
    • U.S. Energy Information Administration (EIA): Form EIA-861 (released Oct 2026) and Form EIA-861 2025 detailed data (released Oct 2026): business power prices and sales by state, grid operators and utilities by county; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Forms EIA-923/906/920 (released Sep 2026): power generated by source, 2025; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Form EIA-860 (released Sep 2026): power plants proposed for 2026 to 2030; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Form EIA-860 (released Sep 2026): power plant capacity by state, 2025; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): thermoelectric cooling water data 2024, Forms EIA-860 and EIA-923 (retrieved Oct 2026): power plant cooling water by state.
    • FEMA: National Risk Index v1.20 (December 2025), NRI_Table_Counties and NRI_Table_States: natural hazard ratings by county and expected annual loss by state; retrieved October 31, 2026. This product uses the Federal Emergency Management Agency's OpenFEMA API, but is not endorsed by FEMA. The Federal Government or FEMA cannot vouch for the data or analyses derived from these data after the data have been retrieved from the Agency's website(s).
    • U.S. Census Bureau: US Census Bureau, Vintage 2025 county population estimates (co-est2025-alldata.csv): people by county.

    How CamsAhead counts cameras · Report a problem · Report a camera

    Add CamsAhead to your Home Screen Open in Safari to install Drive works best from your Home Screen Open in Safari to add it to your Home Screen

    It opens straight to the map.

    This app’s built-in browser can’t add CamsAhead to your Home Screen.

    From your Home Screen, CamsAhead opens full screen with one tap. It keeps the screen on while you drive, where your phone allows it.

    1. Tap Share
      In Safari’s toolbar, or in its ⋯ menu.
    2. Tap Share
      In your browser’s address bar or menu.
    3. Open this page in Safari
      Look for “Open in Safari” or “Open in browser” in this app’s menu, or copy the link.
    4. Copy the link, then paste it in Safari
      Or type CamsAhead.com in Safari.
    5. In Safari, tap Share, then Add to Home Screen
    6. Tap Add to Home Screen
      Scroll down the list if you don’t see it.
    7. Open the ⋮ menu
      Then tap “Add to Home screen” or “Install app”.
    8. Tap Add, then open CamsAhead from your Home Screen. Tap Install, then open CamsAhead from your Home Screen.

    Don’t see Add to Home Screen? Open this page in Safari.

    Or tap Share in this browser, then Add to Home Screen.

    Alerts work while CamsAhead is open on screen, from the Home Screen or the browser. If the screen locks or you switch apps, they stop.

    DriveBetaReport a problem