CamsAhead

Near me

Near me

North Dakota data centers map

North Dakota has 13 mapped data center buildings, tied for the 28th most of any state. Dickey County has the most: 10. 1 large AI campus is here too. Businesses pay 7.36¢ per kWh for power, 45% below the US average. Business power use grew 63.3% from 2019 to 2025, about 6 times the US rate.

Checked

  • 13mapped data center buildings
  • 10in Dickey County, the most
  • 1large AI campus
  • 7.36¢per kWh for businesses45% below the US average

About mapped buildings

Buildings and sites that OpenStreetMap volunteers have tagged as data centers. It counts mapped objects, not an official register, so some data centers are not on it yet.

About large AI campuses

A large data center campus built for AI computing, on Epoch AI's list of AI data centers. “Being built” means Epoch AI lists no computers running there yet.

About business power prices

This is the average price businesses paid for power in North Dakota in 2025. A kilowatt-hour (kWh) is the power a 1,000-watt heater uses in one hour.

“Businesses” is the commercial group in the US Energy Information Administration's figures: offices, stores and most data centers. Some large data centers buy power as industry instead.

Map of data centers in North Dakota: 13 mapped buildings, by county

© OpenStreetMap contributors · © OpenMapTiles

AI campuses: Epoch AI, CC BY 4.0 (Nov 7, 2026), changes noted

What the marks mean

Operating: a building mapped as a data center in OpenStreetMap, in use today. As of Nov 6, 2026.

Proposed to under construction, paused, withdrawn or canceled: a planned project and the stage in its latest public record. As of Nov 7, 2026.

About the stages: a project moves from Proposed to Rezoning filed, Approved, Permitted and Under construction. Some stop: Paused, Withdrawn or Canceled.

AI campus: a large AI campus that is not running yet. As of Nov 7, 2026.

Campuses and projects not placed at their street address are listed, not mapped.

Each kind of mark is counted on its own, and the counts are never added together.

Which North Dakota counties have the most data centers?

Dickey County has the most mapped buildings: 10. Cass County is next, with 2.

Buildings mapped as data centers, per county

  • None
  • 1
  • 2–4
  • 5–9
  • 10–24

How many in each county?

Dickey County10
Cass County2
Williams County1

Which natural risks do these counties face?

About the risk ratings

FEMA's National Risk Index scores each county for each natural hazard from 0 to 100, against every county in the US. The score starts from the expected annual loss: the damage a hazard is likely to cause in an average year. It also weighs how many people could be hurt and how well the area can bounce back.

Ratings run from very low to very high.

“Rate high” means relatively high or very high.

2 of the 3 counties with mapped data centers rate high or very high for a natural hazard: Cass County for ice storm, winter weather, hail and strong wind; Williams County for ice storm, winter weather and cold wave.

Ice storm2 of 3
Winter weather2 of 3
Cold wave1 of 3
Hail1 of 3
Strong wind1 of 3

What does power cost in North Dakota, and how fast is demand growing?

Businesses pay 7.36¢ per kWh, 45% below the US average, and their power use grew 63.3% from 2019 to 2025, about 6 times the US rate.

What do businesses pay for power?

7.36¢ per kWh in 2025, the lowest of 50 states and DC.

North Dakota7.36¢
US average13.37¢

Is North Dakota's power demand rising?

About business power use

This is the power sold to businesses each year, the commercial group in the US Energy Information Administration's figures. Most data centers are in it, so a fast rise often means new data centers, but offices and stores count too.

North Dakota: 7.04 terawatt-hours (TWh) in 2019, 11.49 TWh in 2025. One TWh is a billion kWh.

Yes. Business power use grew 63.3% from 2019 to 2025, about 6 times the US rate.

20192025

What makes North Dakota's power?

About the power mix

This is where the power generated in North Dakota came from in 2025: each source's share of what its power plants made, 42.9 terawatt-hours (TWh) in all. Small rooftop solar panels are not counted.

“Other sources” is the agency's catch-all group.

Coal made 53% of the power generated in North Dakota in 2025; wind made 36%.

Coal53%
Wind36%
Natural gas6.5%
Hydro4.7%

Under 1% each: other sources, other gases and petroleum.

How much new power is proposed in North Dakota?

About proposed power plants

These are new power plants that companies have told the US Energy Information Administration they plan to open from 2026 to 2030. Plans can change or be dropped.

Sizes are net summer capacity: the most power a plant can send to the grid on a hot summer day. Each bar's length is its part of all the proposed power.

Companies have proposed 2,506 MW of new power plants for 2026 to 2030; natural gas is the largest source, 1,458 MW.

Natural gas1,458 MW
Wind512 MW
Solar295 MW
Other sources240 MW

For scale, North Dakota's power plants could deliver 10,427 MW on a summer day in 2025.

Which grid serves North Dakota, and what are its water and hazard risks?

SPP runs the grid for 54.2% of North Dakota's power sales. 1 natural hazard rates very high for North Dakota against other states.

Who runs North Dakota's power grid?

About the grid

A grid operator, called an ISO or RTO, runs the high-voltage power lines and the power market for a whole region. The share is how much of the state's 2025 power sales were made inside its area.

Where there is none, each utility runs its own part of the grid.

SPP, for 54.2% of 2025 power sales.

SPP54.2%
MISO45.7%

How much water do North Dakota's power plants use?

About water taken in and used up

Taken in is the water power plants draw from rivers, lakes, wells or the sea to cool. Used up is the part that does not go back: most of it evaporates.

This is the water power plants use, not the water data centers use.

The 6 power plants in North Dakota that report their cooling water used up 8.3 billion gallons in 2024, 3.2% of the 259 billion they took in.

Which hazards cost North Dakota most?

About expected annual loss

FEMA's National Risk Index estimates each natural hazard's expected annual loss: the damage it is likely to cause in an average year. It rates each state against the other states, from very low to very high.

Hazards with the same rating are in the order of FEMA's score. Because each hazard is compared with other states, one can rate higher here and still cost fewer dollars than another.

Not rated: avalanche (not applicable), coastal flooding (not applicable), hurricane (not applicable), tsunami (not applicable) and volcanic activity (not applicable).

Winter weather rates highest for North Dakota against other states: very high for the damage it is likely to cause in an average year.

  • Very highWinter weather
  • Relatively highIce storm and cold wave
  • Relatively moderateHail, strong wind and tornado
  • Relatively lowWildfire, heat wave and inland flooding
  • Very lowDrought, landslide, lightning and earthquake

Are there AI data centers in North Dakota?

Yes. North Dakota has 1 large AI campus.

Who runs North Dakota's data centers?

About this count

Each building counts once, by the operator named in OpenStreetMap. 12 buildings have no operator named.

Atlas Power Holdings (ND) LLC1

More about North Dakota data centers

Questions about North Dakota data centers

How many data centers are in North Dakota?

North Dakota has 13 data center buildings mapped in OpenStreetMap, tied for the 28th most of any state, as of November 6, 2026. Epoch AI tracks 1 large AI campus here. These counts are kept apart.

What county in North Dakota has the most data centers?

Dickey County has the most: 10 data center buildings. They are mapped in OpenStreetMap. That is as of November 6, 2026. Cass County is next, with 2.

How many AI data centers are there in North Dakota?

Epoch AI tracks 1 large AI campus in North Dakota, as of November 7, 2026. AI data centers in North Dakota lists each one. Other data centers here show as mapped buildings or project records, and each is counted on its own.

Sources and updates

How this page was made: CamsAhead writes each page type once, then fills it with this place's data from the sources below.

  • OpenStreetMap contributors: data center buildings, as of November 6, 2026; Open Database License (ODbL) 1.0, free copy on request.
  • Epoch AI: "AI data centers", CC BY 4.0, retrieved November 7, 2026; changes noted.
  • U.S. Energy Information Administration (EIA): Form EIA-861 (released Oct 2026) and Form EIA-861 2025 detailed data (released Oct 2026): business power prices and sales by state, grid operators and utilities by county; retrieved October 31, 2026.
  • U.S. Energy Information Administration (EIA): Forms EIA-923/906/920 (released Sep 2026): power generated by source, 2025; retrieved October 31, 2026.
  • U.S. Energy Information Administration (EIA): Form EIA-860 (released Sep 2026): power plants proposed for 2026 to 2030; retrieved October 31, 2026.
  • U.S. Energy Information Administration (EIA): Form EIA-860 (released Sep 2026): power plant capacity by state, 2025; retrieved October 31, 2026.
  • U.S. Energy Information Administration (EIA): thermoelectric cooling water data 2024, Forms EIA-860 and EIA-923 (retrieved Oct 2026): power plant cooling water by state.
  • FEMA: National Risk Index v1.20 (December 2025), NRI_Table_Counties and NRI_Table_States: natural hazard ratings by county and expected annual loss by state; retrieved October 31, 2026. This product uses the Federal Emergency Management Agency's OpenFEMA API, but is not endorsed by FEMA. The Federal Government or FEMA cannot vouch for the data or analyses derived from these data after the data have been retrieved from the Agency's website(s).

CamsAhead's project records cover Prince William County, Virginia, not North Dakota.

How CamsAhead counts cameras · Report a problem · Report a camera

Add CamsAhead to your Home Screen Open in Safari to install Drive works best from your Home Screen Open in Safari to add it to your Home Screen

It opens straight to the map.

This app’s built-in browser can’t add CamsAhead to your Home Screen.

From your Home Screen, CamsAhead opens full screen with one tap. It keeps the screen on while you drive, where your phone allows it.

  1. Tap Share
    In Safari’s toolbar, or in its ⋯ menu.
  2. Tap Share
    In your browser’s address bar or menu.
  3. Open this page in Safari
    Look for “Open in Safari” or “Open in browser” in this app’s menu, or copy the link.
  4. Copy the link, then paste it in Safari
    Or type CamsAhead.com in Safari.
  5. In Safari, tap Share, then Add to Home Screen
  6. Tap Add to Home Screen
    Scroll down the list if you don’t see it.
  7. Open the ⋮ menu
    Then tap “Add to Home screen” or “Install app”.
  8. Tap Add, then open CamsAhead from your Home Screen. Tap Install, then open CamsAhead from your Home Screen.

Don’t see Add to Home Screen? Open this page in Safari.

Or tap Share in this browser, then Add to Home Screen.

Alerts work while CamsAhead is open on screen, from the Home Screen or the browser. If the screen locks or you switch apps, they stop.

DriveBetaReport a problem