North Dakota Data Center Intelligence

Mapped North Dakota data center sites, with their power, water and risk

One app for every North Dakota county: data center sites, power, grid and FEMA risk, with hearing alerts and an API. 13 data center buildings are mapped in 3 of its 53 counties, and businesses pay 7.36¢ per kWh for power, 45% below the US average.

$390 a month3 seats · cancel any time

Where are North Dakota's data centers?

13 mapped buildings sit in 3 of North Dakota's 53 counties. Dickey County has the most: 10.

Dickey 10Cass 2Williams 1

    © OpenStreetMap contributors

    Which risks do the counties with data centers face?

    None of the 3 counties with mapped data centers rates high for flooding, heat, storms, wildfire or drought.

    Bars: counties with mapped data centers that rate Relatively high or Very high . Tap one to show it on the map.

    All 53 counties as a table

    What will a North Dakota site pay for power, and how fast is demand growing?

    Business power in North Dakota costs 7.36¢ per kWh, 45% below the US, and demand grew 63.3% since 2019.

    What do businesses pay for power?

    7.36¢ per kWh in 2025, 45% below the US average of 13.37¢.

    • Businesses1st cheapest of 51
      North Dakota
      7.36¢
      US
      13.37¢

    How fast is business power demand growing?

    Business power use in North Dakota grew 63.3% since 2019, 6 times the US rate (+10.5%).

    0%+25%+50%North Dakota+63.3%US+10.5%2019’20’21’22’23’242025

    What makes North Dakota's power?

    42.9 TWh generated in 2025: coal 53%, wind 36%, natural gas 7%.

    • Coal53%
    • Wind36%
    • Natural gas6.5%
    • Hydro4.7%

    Under 1% each: other gases, other (eia's catch-all), petroleum.

    How much new power is proposed?

    2,506 MW of new plants are proposed for 2026–2030, about a quarter of today's 10,427 MW: natural gas 58%, wind 20%, solar 12%, other 10%.

    • Natural gas1,458 MW
    • Wind512 MW
    • Solar295 MW
    • Other (EIA's catch-all)240 MW

    Which grid would a North Dakota site join, and what are its water and hazard risks?

    SPP serves 54.2% of North Dakota's power sales; tornadoes cost it most.

    Which grid serves North Dakota?

    SPP serves 54.2% of North Dakota's retail power sales.

    • SPP54.2%
    • MISO45.7%

    Share of 2025 retail sales, by each utility's balancing authority .

    How much water do North Dakota's power plants use?

    North Dakota's power plants took in 259 billion gallons of water in 2024 to cool and returned about 96%; 8.3 billion gallons were used up .

    Returned 96.8%Used up 3.2%

    Which hazards cost North Dakota most?

    Tornadoes are North Dakota's biggest risk (moderate) ; the rest rate low or lower.

    • TornadoRelatively moderate
    • Inland floodingRelatively low
    • Heat waveRelatively low
    • WildfireRelatively low
    • DroughtVery low
    • EarthquakeVery low

    Which AI campuses are in North Dakota?

    North Dakota has 1 AI campus on the list; none of them is listed as being built.

    AI campuses in North Dakota: CoreWeave Ellendale ND.

    Who uses it, and what do they see first?

    Lawyers, brokers, site teams, utilities, insurers and investors each start from their own view of North Dakota's 53 counties.

    Land-use and energy lawyers

    Follow counties with data centers, their hearings and FEMA risk.

    • Dickey County10 mapped · risk very low
    • Cass County2 mapped · risk relatively moderate
    • Williams County1 mapped · risk relatively low
    3counties with data centers to follow, each with its planning and zoning agendas

    Land and industrial brokers

    Rank counties by mapped data center buildings, with the power price behind them.

    • Dickey County10
    • Cass County2
    • Williams County1
    10mapped buildings in Dickey County, the most in North Dakota

    Site selection teams

    Shortlist counties by mapped sites, power and risk on one map.

    3of 53 counties have mapped data centers

    Utilities and power buyers

    Follow prices, demand and the grid behind each site. Bars: business power sales since 2019.

    • North Dakota+63.3%
    • US+10.5%
    +63.3%business power sales since 2019, US +10.5%

    Insurers and lenders

    Bars: how many of the counties with data centers rate high for each hazard.

    • Drought0 of 3
    • Heat wave0 of 3
    • Inland flooding0 of 3
    • Tornado0 of 3
    0of 3 counties with mapped data centers rate high for at least one

    Investors and analysts

    See which new power plants are proposed, by source and size. Bars: MW proposed.

    • Natural gas1,458
    • Wind512
    • Solar295
    • Other240
    2,506MW of new plants proposed for 2026–2030

    What's inside North Dakota Data Center Intelligence?

    One app for all 53 North Dakota counties, plus hearing alerts and an API. Every screen below is filled with North Dakota's real data.

    The Intelligence app

    Every county's sites, power, water and risk on one screen, with your watchlist.

    app.camsahead.com/intelligence/north-dakota
    OverviewMapSitesAI campusesProjectsPowerWaterRiskHearingsAlertsAPI
    13mapped buildings
    1AI campus
    7.36¢business power, per kWh
    −0.8%business demand, last 12 months
    WatchlistMappedFloodHeatDrought
    Dickey County10Very lowVery lowVery low
    Cass County2moderatelowVery low
    Williams County1lowVery lowlow

    Hearings and filings

    Follow counties and cases; get the agenda and the record when a hearing is posted.

    Hearings · North Dakota
    North Dakota · counties you follow Planning, zoning and utility agendas
    • Dickey County10 mapped data center buildingsAgenda alerts
    • Cass County2 mapped data center buildingsAgenda alerts
    • Williams County1 mapped data center buildingsAgenda alerts

    Alerts

    New projects, stage changes, hearings and data updates for what you follow, by email or in the app.

    Alerts · North Dakota
    • Power demandBusiness power sales −0.8% on the year before: 11.5 TWhEIA-861M, 2025-09 to 2026-08
    • Site riskFEMA rates North Dakota's tornado loss Relatively moderate among statesFEMA National Risk Index
    • New supply2,506 MW of new plants proposed for 2026–2030EIA-860

    Data API

    County, power, risk and project data as JSON for your own tools.

    api.camsahead.com
    GET /v1/counties/38021
    {
      "fips": "38021",
      "name": "Dickey County",
      "state": "ND",
      "pop2025": 4895,
      "pop_change_2020_pct": -2.1,
      "density_per_sqmi": 4.3,
      "nri": {
        "risk_rating": "Very Low",
        "ifld": {
          "rating": "Very Low",
          "score": 6.5
    Show the full response
        },
        "hwav": {
          "rating": "Very Low",
          "score": 14.1
        },
        "drgt": {
          "rating": "Very Low",
          "score": 26.2
        }
      },
      "grid": {
        "rtos": [
          "MISO",
          "SPP"
        ],
        "utilities_n": 6
      },
      "state_power": {
        "commercial_cents_kwh": 7.36,
        "us_commercial_cents_kwh": 13.37,
        "as_of": "2025"
      }
    }

    What does it cost?

    North Dakota Data Center Intelligence is $390 a month for 3 seats.

    North Dakota Data Center Intelligence$390 a month
    • The Intelligence app: every county's sites, power, water and risk
    • Alerts on new projects, filings and hearings
    • Reports as web page, PDF and CSV
    • 3 seats · cancel any time
    Data APIFrom $999 a month
    • County, power, risk and project data as JSON
    • Keys for your own tools and models
    Public bodies$4,680 a year
    • Counties, cities, utilities and co-ops
    • Paid by invoice

    What stays open? The map, the county pages and every data center page stay open to everyone.

    Sources and updates

    How this page was made: CamsAhead writes each page type once, then fills it with this place's data from the sources below.

    • OpenStreetMap contributors: data center buildings, as of November 6, 2026; Open Database License (ODbL) 1.0, free copy on request.
    • Epoch AI: "AI data centers", CC BY 4.0, retrieved November 7, 2026; changes noted.
    • U.S. Energy Information Administration (EIA): Form EIA-861 (released Oct 2026) and Form EIA-861 2025 detailed data (released Oct 2026): business power prices and sales by state, grid operators and utilities by county; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Forms EIA-923/906/920 (released Sep 2026): power generated by source, 2025; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Form EIA-860 (released Sep 2026): power plants proposed for 2026 to 2030; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Form EIA-860 (released Sep 2026): power plant capacity by state, 2025; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): thermoelectric cooling water data 2024, Forms EIA-860 and EIA-923 (retrieved Oct 2026): power plant cooling water by state.
    • FEMA: National Risk Index v1.20 (December 2025), NRI_Table_Counties and NRI_Table_States: natural hazard ratings by county and expected annual loss by state; retrieved October 31, 2026. This product uses the Federal Emergency Management Agency's OpenFEMA API, but is not endorsed by FEMA. The Federal Government or FEMA cannot vouch for the data or analyses derived from these data after the data have been retrieved from the Agency's website(s).
    • U.S. Census Bureau: US Census Bureau, Vintage 2025 county population estimates (co-est2025-alldata.csv): people by county.

    How CamsAhead counts cameras · Report a problem · Report a camera

    Add CamsAhead to your Home Screen Open in Safari to install Drive works best from your Home Screen Open in Safari to add it to your Home Screen

    It opens straight to the map.

    This app’s built-in browser can’t add CamsAhead to your Home Screen.

    From your Home Screen, CamsAhead opens full screen with one tap. It keeps the screen on while you drive, where your phone allows it.

    1. Tap Share
      In Safari’s toolbar, or in its ⋯ menu.
    2. Tap Share
      In your browser’s address bar or menu.
    3. Open this page in Safari
      Look for “Open in Safari” or “Open in browser” in this app’s menu, or copy the link.
    4. Copy the link, then paste it in Safari
      Or type CamsAhead.com in Safari.
    5. In Safari, tap Share, then Add to Home Screen
    6. Tap Add to Home Screen
      Scroll down the list if you don’t see it.
    7. Open the ⋮ menu
      Then tap “Add to Home screen” or “Install app”.
    8. Tap Add, then open CamsAhead from your Home Screen. Tap Install, then open CamsAhead from your Home Screen.

    Don’t see Add to Home Screen? Open this page in Safari.

    Or tap Share in this browser, then Add to Home Screen.

    Alerts work while CamsAhead is open on screen, from the Home Screen or the browser. If the screen locks or you switch apps, they stop.

    DriveBetaReport a problem