Dallas data centers map
13 mapped data center buildings sit inside Dallas, Texas. Dallas County has 30 mapped data center buildings. Businesses in Texas pay 8.56¢ per kWh for power, 36% below the US average. Business power use in Texas grew 23% from 2019 to 2025. Hail is Dallas County's top-rated natural risk: very high next to all US counties.
- 13mapped buildings inside Dallas
- 30mapped buildings in Dallas County
© OpenStreetMap contributors · © OpenMapTiles
AI campuses: Epoch AI, CC BY 4.0 (Nov 7, 2026), changes noted
© OpenStreetMap contributors · Addresses: Photon
Your location stays on your device.
What the marks mean
Operating: a building mapped as a data center in OpenStreetMap, in use today. As of Nov 6, 2026.
Proposed to under construction, paused, withdrawn or canceled: a planned project and the stage in its latest public record. As of Nov 7, 2026.
About the stages: a project moves from Proposed to Rezoning filed, Approved, Permitted and Under construction. Some stop: Paused, Withdrawn or Canceled.
AI campus: a large AI campus that is not running yet. As of Nov 7, 2026.
Campuses and projects not placed at their street address are listed, not mapped.
Each kind of mark is counted on its own, and the counts are never added together.
What do data centers mean for Dallas?
Who supplies Dallas County's power?
About the grid
A grid operator, called an ISO or RTO, runs the high-voltage power lines and the power market for a whole region. The share is how much of the state's 2025 power sales were made inside its area.
Where there is none, each utility runs its own part of the grid.
The utilities are the ones that report serving the county, A to Z, not each one's share.
All 6: City of Garland - (TX), Farmers Electric Coop, Inc - (TX), HILCO Electric Cooperative, Inc., Oncor Electric Delivery Company LLC, Texas-New Mexico Power Co, Trinity Valley Elec Coop Inc.
6utilities
City of Garland - (TX), Farmers Electric Coop, Inc - (TX) and 4 more serve the county, on ERCOT's grid.
What risks do Dallas County's data centers face?
About the risk scores
FEMA's National Risk Index scores each county for each natural hazard from 0 to 100, against every county in the US. The score starts from the expected annual loss: the damage a hazard is likely to cause in an average year. It also weighs how many people could be hurt and how well the area can bounce back.
Ratings run from very low to very high.
FEMA's rating for hail here: very high.
Nearly allUS counties score lower for hail
Hail is the top-rated natural risk here.
Businesses in Texas pay 8.56¢ per kilowatt-hour (kWh) for power, the 3rd lowest of 50 states and DC, and their power use is up 23% since 2019. Texas data centers compares both with the US.
What's in Dallas?
How the place is counted
A building counts for Dallas when it sits inside the place's own outline from the Census. A county count covers the whole county.
No large AI campus in Dallas is listed yet. 13 mapped buildings sit inside Dallas's Census outline.
5 large AI campuses are being built elsewhere in Texas.
Who runs Dallas's data centers?
About this count
Each building counts once, by the operator named in OpenStreetMap. 4 buildings have no operator named.
Lumen Technologies and Prime tie for the most mapped buildings: 2 each.
Show 2 more operatorsShow fewer
More about Dallas data centers
Questions about Dallas data centers
How many data centers are being built in Dallas, TX?
As of November 7, 2026, no AI campus in Dallas is on Epoch AI's list of campuses not yet operating.
What is the biggest data center being built in Texas?
Of the 5 sites in Texas on Epoch AI's list of campuses not yet running, the biggest is OpenAI Stargate Shackelford. Epoch AI expects it first online in Aug 2027 and at full size in Nov 2028, with 1,400 MW for the computers. It is in Shackelford County, Texas, outside Dallas.
Sources and updates
How this page was made: CamsAhead writes each page type once, then fills it with this place's data from the sources below.
- OpenStreetMap contributors: data center buildings, as of November 6, 2026; Open Database License (ODbL) 1.0, free copy on request.
- Epoch AI: "AI data centers", CC BY 4.0, retrieved November 7, 2026; changes noted.
- U.S. Energy Information Administration (EIA): Form EIA-861 (released Oct 2026) and Form EIA-861 2025 detailed data (released Oct 2026): business power prices and sales by state, grid operators and utilities by county; retrieved October 31, 2026.
- FEMA: National Risk Index v1.20 (December 2025), NRI_Table_Counties and NRI_Table_States: natural hazard ratings by county; retrieved October 31, 2026. This product uses the Federal Emergency Management Agency's OpenFEMA API, but is not endorsed by FEMA. The Federal Government or FEMA cannot vouch for the data or analyses derived from these data after the data have been retrieved from the Agency's website(s).
CamsAhead's project records cover Prince William County, Virginia, not Dallas.
How CamsAhead counts cameras · Report a problem · Report a camera