CamsAhead

Near me

Near me

Utah data centers map

Utah has 22 mapped data center buildings, tied for the 20th most of any state. Salt Lake County has the most: 13. 1 large AI campus is being built; the first is expected online in Dec 2026. Businesses pay 10.06¢ per kWh for power, 25% below the US average.

Checked

  • 22mapped data center buildings
  • 13in Salt Lake County, the most
  • 1large AI campus being built
  • 10.06¢per kWh for businesses25% below the US average

About mapped buildings

Buildings and sites that OpenStreetMap volunteers have tagged as data centers. It counts mapped objects, not an official register, so some data centers are not on it yet.

About large AI campuses

A large data center campus built for AI computing, on Epoch AI's list of AI data centers. “Being built” means Epoch AI lists no computers running there yet.

About business power prices

This is the average price businesses paid for power in Utah in 2025. A kilowatt-hour (kWh) is the power a 1,000-watt heater uses in one hour.

“Businesses” is the commercial group in the US Energy Information Administration's figures: offices, stores and most data centers. Some large data centers buy power as industry instead.

Map of data centers in Utah: 22 mapped buildings, by county

© OpenStreetMap contributors · © OpenMapTiles

AI campuses: Epoch AI, CC BY 4.0 (Nov 7, 2026), changes noted

What the marks mean

Operating: a building mapped as a data center in OpenStreetMap, in use today. As of Nov 6, 2026.

Proposed to under construction, paused, withdrawn or canceled: a planned project and the stage in its latest public record. As of Nov 7, 2026.

About the stages: a project moves from Proposed to Rezoning filed, Approved, Permitted and Under construction. Some stop: Paused, Withdrawn or Canceled.

AI campus: a large AI campus that is not running yet. As of Nov 7, 2026.

Campuses and projects not placed at their street address are listed, not mapped.

Each kind of mark is counted on its own, and the counts are never added together.

Which Utah counties have the most data centers?

Salt Lake County has the most mapped buildings: 13. Utah County is next, with 6.

Buildings mapped as data centers, per county

  • None
  • 1
  • 2–4
  • 5–9
  • 10–24

How many in each county?

Salt Lake County13
Utah County1 AI campus being built6
Washington County2
Uintah County1

Which natural risks do these counties face?

About the risk ratings

FEMA's National Risk Index scores each county for each natural hazard from 0 to 100, against every county in the US. The score starts from the expected annual loss: the damage a hazard is likely to cause in an average year. It also weighs how many people could be hurt and how well the area can bounce back.

Ratings run from very low to very high.

“Rate high” means relatively high or very high.

3 of the 4 counties with mapped data centers rate high or very high for a natural hazard: Salt Lake County for avalanche, lightning, wildfire, earthquake and winter weather; Utah County for avalanche, lightning, wildfire, earthquake, winter weather and strong wind; Washington County for avalanche, lightning, wildfire, inland flooding and landslide.

Avalanche3 of 4
Lightning3 of 4
Wildfire3 of 4
Earthquake2 of 4
Winter weather2 of 4

What does power cost in Utah, and how fast is demand growing?

Businesses pay 10.06¢ per kWh, 25% below the US average, and their power use grew 24.4% from 2019 to 2025, about twice the US rate.

What do businesses pay for power?

10.06¢ per kWh in 2025, the 10th lowest of 50 states and DC.

Utah10.06¢
US average13.37¢

Is Utah's power demand rising?

About business power use

This is the power sold to businesses each year, the commercial group in the US Energy Information Administration's figures. Most data centers are in it, so a fast rise often means new data centers, but offices and stores count too.

Utah: 11.86 terawatt-hours (TWh) in 2019, 14.75 TWh in 2025. One TWh is a billion kWh.

Yes. Business power use grew 24.4% from 2019 to 2025, about twice the US rate.

20192025

What makes Utah's power?

About the power mix

This is where the power generated in Utah came from in 2025: each source's share of what its power plants made, 38.1 terawatt-hours (TWh) in all. Small rooftop solar panels are not counted.

“Other sources” is the agency's catch-all group.

Coal made 47% of the power generated in Utah in 2025; natural gas made 30%.

Coal47%
Natural gas30%
Solar17%
Wind2.1%
Hydro1.4%
Geothermal1.2%

Under 1% each: other sources, other biomass, petroleum and other gases.

How much new power is proposed in Utah?

About proposed power plants

These are new power plants that companies have told the US Energy Information Administration they plan to open from 2026 to 2030. Plans can change or be dropped.

Sizes are net summer capacity: the most power a plant can send to the grid on a hot summer day. Each bar's length is its part of all the proposed power.

Companies have proposed 4,879 MW of new power plants for 2026 to 2030; solar is the largest source, 2,188 MW.

Solar2,188 MW
Other sources1,576 MW
Pumped storage1,000 MW
Geothermal85 MW
Natural gas30 MW

For scale, Utah's power plants could deliver 10,432 MW on a summer day in 2025.

Which grid serves Utah, and what are its water and hazard risks?

Utilities run their own grid areas for all of Utah's power sales. 1 natural hazard rates very high for Utah against other states.

Who runs Utah's power grid?

About the grid

A grid operator, called an ISO or RTO, runs the high-voltage power lines and the power market for a whole region. The share is how much of the state's 2025 power sales were made inside its area.

Where there is none, each utility runs its own part of the grid.

No grid operator: each utility runs its own part of the grid, for all of 2025 power sales.

How much water do Utah's power plants use?

About water taken in and used up

Taken in is the water power plants draw from rivers, lakes, wells or the sea to cool. Used up is the part that does not go back: most of it evaporates.

This is the water power plants use, not the water data centers use.

The 6 power plants in Utah that report their cooling water used up 11 billion gallons in 2024, 96% of the 11.4 billion they took in.

Which hazards cost Utah most?

About expected annual loss

FEMA's National Risk Index estimates each natural hazard's expected annual loss: the damage it is likely to cause in an average year. It rates each state against the other states, from very low to very high.

Hazards with the same rating are in the order of FEMA's score. Because each hazard is compared with other states, one can rate higher here and still cost fewer dollars than another.

Not rated: coastal flooding (no expected annual losses), hurricane (not applicable) and tsunami (not applicable).

Avalanche rates highest for Utah against other states: very high for the damage it is likely to cause in an average year.

  • Very highAvalanche
  • Relatively highEarthquake, wildfire, lightning and winter weather
  • Relatively moderateLandslide
  • Relatively lowHeat wave, drought, strong wind, inland flooding, tornado and cold wave
  • Very lowVolcanic activity, hail and ice storm

Which data center projects are planned in Utah?

1 large AI campus is being built in Utah. The first, QTS Eagle Mountain, is expected online in Dec 2026.

Hatched: the MW expected at full size, not built yet. About the dates

What the dates mean

Not yet operating means the site is still being built or planned. Its computers are not running yet. The year shown is when Epoch AI expects them to start.

First online is the month Epoch AI expects the first computers to switch on. Full size is the month it expects the whole campus to be built. Dates can slip.

Epoch AI, a research group, makes these estimates from satellite photos, permits and company news. They can be off by a fair amount.

About MW

A megawatt (MW) measures how much power a site is built to handle at one time. Think of the size of a pipe, not the water that flows through it over a year.

1,000 MW is one gigawatt (GW).

For an AI campus, this is the power its computers are built for, not cooling or offices.

Are there AI data centers in Utah?

Yes. Utah has 2 large AI campuses.

Who runs Utah's data centers?

About this count

Each building counts once, by the operator named in OpenStreetMap. 5 buildings have no operator named.

DataBank, Flexential and Meta tie for the most mapped buildings: 5 each.

DataBank5
Flexential5
Meta5
Lumen Technologies1
ValorC31

More about Utah data centers

Questions about Utah data centers

How many data centers are in Utah?

Utah has 22 data center buildings mapped in OpenStreetMap, tied for the 20th most of any state, as of November 6, 2026. Epoch AI tracks 2 large AI campuses here. These counts are kept apart.

What county in Utah has the most data centers?

Salt Lake County has the most: 13 data center buildings. They are mapped in OpenStreetMap. That is as of November 6, 2026. Utah County is next, with 6.

How many AI data centers are there in Utah?

Epoch AI tracks 2 large AI campuses in Utah, as of November 7, 2026. AI data centers in Utah lists each one. Other data centers here show as mapped buildings or project records, and each is counted on its own.

Sources and updates

How this page was made: CamsAhead writes each page type once, then fills it with this place's data from the sources below.

  • OpenStreetMap contributors: data center buildings, as of November 6, 2026; Open Database License (ODbL) 1.0, free copy on request.
  • Epoch AI: "AI data centers", CC BY 4.0, retrieved November 7, 2026; changes noted.
  • U.S. Energy Information Administration (EIA): Form EIA-861 (released Oct 2026) and Form EIA-861 2025 detailed data (released Oct 2026): business power prices and sales by state, grid operators and utilities by county; retrieved October 31, 2026.
  • U.S. Energy Information Administration (EIA): Forms EIA-923/906/920 (released Sep 2026): power generated by source, 2025; retrieved October 31, 2026.
  • U.S. Energy Information Administration (EIA): Form EIA-860 (released Sep 2026): power plants proposed for 2026 to 2030; retrieved October 31, 2026.
  • U.S. Energy Information Administration (EIA): Form EIA-860 (released Sep 2026): power plant capacity by state, 2025; retrieved October 31, 2026.
  • U.S. Energy Information Administration (EIA): thermoelectric cooling water data 2024, Forms EIA-860 and EIA-923 (retrieved Oct 2026): power plant cooling water by state.
  • FEMA: National Risk Index v1.20 (December 2025), NRI_Table_Counties and NRI_Table_States: natural hazard ratings by county and expected annual loss by state; retrieved October 31, 2026. This product uses the Federal Emergency Management Agency's OpenFEMA API, but is not endorsed by FEMA. The Federal Government or FEMA cannot vouch for the data or analyses derived from these data after the data have been retrieved from the Agency's website(s).

CamsAhead's project records cover Prince William County, Virginia, not Utah.

How CamsAhead counts cameras · Report a problem · Report a camera

Add CamsAhead to your Home Screen Open in Safari to install Drive works best from your Home Screen Open in Safari to add it to your Home Screen

It opens straight to the map.

This app’s built-in browser can’t add CamsAhead to your Home Screen.

From your Home Screen, CamsAhead opens full screen with one tap. It keeps the screen on while you drive, where your phone allows it.

  1. Tap Share
    In Safari’s toolbar, or in its ⋯ menu.
  2. Tap Share
    In your browser’s address bar or menu.
  3. Open this page in Safari
    Look for “Open in Safari” or “Open in browser” in this app’s menu, or copy the link.
  4. Copy the link, then paste it in Safari
    Or type CamsAhead.com in Safari.
  5. In Safari, tap Share, then Add to Home Screen
  6. Tap Add to Home Screen
    Scroll down the list if you don’t see it.
  7. Open the ⋮ menu
    Then tap “Add to Home screen” or “Install app”.
  8. Tap Add, then open CamsAhead from your Home Screen. Tap Install, then open CamsAhead from your Home Screen.

Don’t see Add to Home Screen? Open this page in Safari.

Or tap Share in this browser, then Add to Home Screen.

Alerts work while CamsAhead is open on screen, from the Home Screen or the browser. If the screen locks or you switch apps, they stop.

DriveBetaReport a problem