Utah Data Center Intelligence

Mapped Utah data center sites, with their power, water and risk

One app for every Utah county: data center sites, power, grid and FEMA risk, with hearing alerts and an API. 22 data center buildings are mapped in 4 of its 29 counties, and businesses pay 10.06¢ per kWh for power, 25% below the US average.

$390 a month3 seats · cancel any time

Where are Utah's data centers?

22 mapped buildings sit in 4 of Utah's 29 counties. Salt Lake County has the most: 13.

Salt Lake 13Utah 6Washington 2Uintah 1

    © OpenStreetMap contributors

    Which risks do the counties with data centers face?

    Wildfires are the most common risk: 3 of the 4 counties with mapped data centers rate high for them.

    Bars: counties with mapped data centers that rate Relatively high or Very high . Tap one to show it on the map.

    All 29 counties as a table

    What will a Utah site pay for power, and how fast is demand growing?

    Business power in Utah costs 10.06¢ per kWh, 25% below the US, and demand grew 24.4% since 2019.

    What do businesses pay for power?

    10.06¢ per kWh in 2025, 25% below the US average of 13.37¢.

    • Businesses10th cheapest of 51
      Utah
      10.06¢
      US
      13.37¢

    How fast is business power demand growing?

    Business power use in Utah grew 24.4% since 2019, more than twice the US rate (+10.5%).

    0%+10%+20%Utah+24.4%US+10.5%2019’20’21’22’23’242025

    What makes Utah's power?

    38.1 TWh generated in 2025: coal 47%, natural gas 30%, solar 17%.

    • Coal47%
    • Natural gas30%
    • Solar17%
    • Wind2.1%
    • Hydro1.4%
    • Geothermal1.2%

    Under 1% each: other (eia's catch-all), other biomass, petroleum, other gases.

    How much new power is proposed?

    4,879 MW of new plants are proposed for 2026–2030, about half of today's 10,432 MW: solar 45%, other 32%, pumped storage 20%, geothermal 2%.

    • Solar2,188 MW
    • Other (EIA's catch-all)1,576 MW
    • Pumped storage1,000 MW
    • Geothermal85 MW
    • Natural gas30 MW

    Which grid would a Utah site join, and what are its water and hazard risks?

    No ISO/RTO covers Utah's power sales; wildfires and earthquakes cost it most.

    Which grid serves Utah?

    Utah has no ISO/RTO : utilities balance their own areas for all of its retail sales.

    • No ISO/RTOAll

    Share of 2025 retail sales, by each utility's balancing authority .

    How much water do Utah's power plants use?

    Utah's power plants took in 11.4 billion gallons of water in 2024 to cool and returned about 3%; 11.0 billion gallons were used up .

    Returned 3.5%Used up 96.5%

    Which hazards cost Utah most?

    Wildfires and earthquakes are Utah's biggest risks: each rates relatively high against other states .

    • WildfireRelatively high
    • EarthquakeRelatively high
    • Inland floodingRelatively low
    • Heat waveRelatively low
    • TornadoRelatively low
    • DroughtRelatively low

    Which AI campuses are being built in Utah, and how big will they be?

    Utah has 2 AI campuses on the list; 1 is being built. It, QTS Eagle Mountain, is planned at 304 MW , full size by Jul 2027.

    Bars: IT power expected at full size . Dates are Epoch AI's own estimates .

    Other AI campuses in Utah: Meta Eagle Mountain.

    Who uses it, and what do they see first?

    Lawyers, brokers, site teams, utilities, insurers and investors each start from their own view of Utah's 29 counties.

    Land-use and energy lawyers

    Follow counties with data centers, their hearings and FEMA risk.

    • Salt Lake County13 mapped · risk relatively high
    • Utah County6 mapped · risk relatively high
    • Washington County2 mapped · risk relatively moderate
    4counties with data centers to follow, each with its planning and zoning agendas

    Land and industrial brokers

    Rank counties by mapped data center buildings, with the power price behind them.

    • Salt Lake County13
    • Utah County6
    • Washington County2
    • Uintah County1
    13mapped buildings in Salt Lake County, the most in Utah

    Site selection teams

    Shortlist counties by mapped sites, power and risk on one map.

    4of 29 counties have mapped data centers

    Utilities and power buyers

    Follow prices, demand and the grid behind each site. Bars: business power sales since 2019.

    • Utah+24.4%
    • US+10.5%
    +24.4%business power sales since 2019, US +10.5%

    Insurers and lenders

    Bars: how many of the counties with data centers rate high for each hazard.

    • Wildfire3 of 4
    • Inland flooding1 of 4
    • Drought0 of 4
    • Heat wave0 of 4
    3of 4 counties with mapped data centers rate high for at least one

    Investors and analysts

    Track AI campuses being built, their owners and users. Bars: MW expected at full size.

    • QTS Eagle Mountain304 MW
    304MW planned at 1 AI campus being built

    What's inside Utah Data Center Intelligence?

    One app for all 29 Utah counties, plus hearing alerts and an API. Every screen below is filled with Utah's real data.

    The Intelligence app

    Every county's sites, power, water and risk on one screen, with your watchlist.

    app.camsahead.com/intelligence/utah
    OverviewMapSitesAI campusesProjectsPowerWaterRiskHearingsAlertsAPI
    22mapped buildings
    2AI campuses
    10.06¢business power, per kWh
    +6.8%business demand, last 12 months
    WatchlistMappedFloodHeatDrought
    Salt Lake County13moderatemoderatelow
    Utah County6moderatemoderatemoderate
    Washington County2highmoderatelow
    Uintah County1Very lowVery lowlow

    Hearings and filings

    Follow counties and cases; get the agenda and the record when a hearing is posted.

    Hearings · Utah
    Utah · counties you follow Planning, zoning and utility agendas
    • Salt Lake County13 mapped data center buildingsAgenda alerts
    • Utah County6 mapped data center buildingsAgenda alerts
    • Washington County2 mapped data center buildingsAgenda alerts
    • Uintah County1 mapped data center buildingsAgenda alerts

    Alerts

    New projects, stage changes, hearings and data updates for what you follow, by email or in the app.

    Alerts · Utah
    • Power demandBusiness power sales +6.8% on the year before: 15.5 TWhEIA-861M, 2025-09 to 2026-08
    • Site riskSalt Lake County (13 mapped buildings) rates Relatively high for wildfireFEMA National Risk Index
    • AI campus being builtQTS Eagle Mountain: 304 MW of IT power expected · first online Dec 2026 · full size Jul 2027Epoch AI

    Data API

    County, power, risk and project data as JSON for your own tools.

    api.camsahead.com
    GET /v1/counties/49035
    {
      "fips": "49035",
      "name": "Salt Lake County",
      "state": "UT",
      "pop2025": 1220916,
      "pop_change_2020_pct": 3,
      "density_per_sqmi": 1621.7,
      "nri": {
        "risk_rating": "Relatively High",
        "ifld": {
          "rating": "Relatively Moderate",
          "score": 92.9
    Show the full response
        },
        "hwav": {
          "rating": "Relatively Moderate",
          "score": 92.9
        },
        "drgt": {
          "rating": "Relatively Low",
          "score": 44.4
        }
      },
      "grid": {
        "rtos": [],
        "utilities_n": 3
      },
      "state_power": {
        "commercial_cents_kwh": 10.06,
        "us_commercial_cents_kwh": 13.37,
        "as_of": "2025"
      }
    }

    What does it cost?

    Utah Data Center Intelligence is $390 a month for 3 seats.

    Utah Data Center Intelligence$390 a month
    • The Intelligence app: every county's sites, power, water and risk
    • Alerts on new projects, filings and hearings
    • Reports as web page, PDF and CSV
    • 3 seats · cancel any time
    Data APIFrom $999 a month
    • County, power, risk and project data as JSON
    • Keys for your own tools and models
    Public bodies$4,680 a year
    • Counties, cities, utilities and co-ops
    • Paid by invoice

    What stays open? The map, the county pages and every data center page stay open to everyone.

    Sources and updates

    How this page was made: CamsAhead writes each page type once, then fills it with this place's data from the sources below.

    • OpenStreetMap contributors: data center buildings, as of November 6, 2026; Open Database License (ODbL) 1.0, free copy on request.
    • Epoch AI: "AI data centers", CC BY 4.0, retrieved November 7, 2026; changes noted.
    • U.S. Energy Information Administration (EIA): Form EIA-861 (released Oct 2026) and Form EIA-861 2025 detailed data (released Oct 2026): business power prices and sales by state, grid operators and utilities by county; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Forms EIA-923/906/920 (released Sep 2026): power generated by source, 2025; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Form EIA-860 (released Sep 2026): power plants proposed for 2026 to 2030; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Form EIA-860 (released Sep 2026): power plant capacity by state, 2025; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): thermoelectric cooling water data 2024, Forms EIA-860 and EIA-923 (retrieved Oct 2026): power plant cooling water by state.
    • FEMA: National Risk Index v1.20 (December 2025), NRI_Table_Counties and NRI_Table_States: natural hazard ratings by county and expected annual loss by state; retrieved October 31, 2026. This product uses the Federal Emergency Management Agency's OpenFEMA API, but is not endorsed by FEMA. The Federal Government or FEMA cannot vouch for the data or analyses derived from these data after the data have been retrieved from the Agency's website(s).
    • U.S. Census Bureau: US Census Bureau, Vintage 2025 county population estimates (co-est2025-alldata.csv): people by county.

    How CamsAhead counts cameras · Report a problem · Report a camera

    Add CamsAhead to your Home Screen Open in Safari to install Drive works best from your Home Screen Open in Safari to add it to your Home Screen

    It opens straight to the map.

    This app’s built-in browser can’t add CamsAhead to your Home Screen.

    From your Home Screen, CamsAhead opens full screen with one tap. It keeps the screen on while you drive, where your phone allows it.

    1. Tap Share
      In Safari’s toolbar, or in its ⋯ menu.
    2. Tap Share
      In your browser’s address bar or menu.
    3. Open this page in Safari
      Look for “Open in Safari” or “Open in browser” in this app’s menu, or copy the link.
    4. Copy the link, then paste it in Safari
      Or type CamsAhead.com in Safari.
    5. In Safari, tap Share, then Add to Home Screen
    6. Tap Add to Home Screen
      Scroll down the list if you don’t see it.
    7. Open the ⋮ menu
      Then tap “Add to Home screen” or “Install app”.
    8. Tap Add, then open CamsAhead from your Home Screen. Tap Install, then open CamsAhead from your Home Screen.

    Don’t see Add to Home Screen? Open this page in Safari.

    Or tap Share in this browser, then Add to Home Screen.

    Alerts work while CamsAhead is open on screen, from the Home Screen or the browser. If the screen locks or you switch apps, they stop.

    DriveBetaReport a problem