Florida data centers map
Florida has 18 mapped data center buildings, the 22nd most of any state. Miami-Dade County and Orange County tie for the most: 4 each. Businesses pay 11.53¢ per kWh for power, 14% below the US average. Business power use grew 3.9% from 2019 to 2025; the US grew 10.5%.
- 18mapped data center buildings
- 11.53¢per kWh for businesses14% below the US average
About mapped buildings
Buildings and sites that OpenStreetMap volunteers have tagged as data centers. It counts mapped objects, not an official register, so some data centers are not on it yet.
About business power prices
This is the average price businesses paid for power in Florida in 2025. A kilowatt-hour (kWh) is the power a 1,000-watt heater uses in one hour.
“Businesses” is the commercial group in the US Energy Information Administration's figures: offices, stores and most data centers. Some large data centers buy power as industry instead.
© OpenStreetMap contributors · © OpenMapTiles
AI campuses: Epoch AI, CC BY 4.0 (Nov 7, 2026), changes noted
© OpenStreetMap contributors · Addresses: Photon
Your location stays on your device.
What the marks mean
Operating: a building mapped as a data center in OpenStreetMap, in use today. As of Nov 6, 2026.
Proposed to under construction, paused, withdrawn or canceled: a planned project and the stage in its latest public record. As of Nov 7, 2026.
About the stages: a project moves from Proposed to Rezoning filed, Approved, Permitted and Under construction. Some stop: Paused, Withdrawn or Canceled.
AI campus: a large AI campus that is not running yet. As of Nov 7, 2026.
Campuses and projects not placed at their street address are listed, not mapped.
Each kind of mark is counted on its own, and the counts are never added together.
Which Florida counties have the most data centers?
Miami-Dade County and Orange County tie for the most mapped buildings: 4 each. Hillsborough County is next, with 3.
Buildings mapped as data centers, per county
- None
- 1
- 2–4
How many in each county?
Which natural risks do these counties face?
About the risk ratings
FEMA's National Risk Index scores each county for each natural hazard from 0 to 100, against every county in the US. The score starts from the expected annual loss: the damage a hazard is likely to cause in an average year. It also weighs how many people could be hurt and how well the area can bounce back.
Ratings run from very low to very high.
“Rate high” means relatively high or very high.
All 7 counties with mapped data centers rate high or very high for at least one natural hazard. Hurricane, lightning and tornado are the most common, with 7 each.
What does power cost in Florida, and how fast is demand growing?
Businesses pay 11.53¢ per kWh, 14% below the US average, and their power use grew 3.9% from 2019 to 2025.
What do businesses pay for power?
11.53¢ per kWh in 2025, the 21st lowest of 50 states and DC.
Is Florida's power demand rising?
About business power use
This is the power sold to businesses each year, the commercial group in the US Energy Information Administration's figures. Most data centers are in it, so a fast rise often means new data centers, but offices and stores count too.
Florida: 96.57 terawatt-hours (TWh) in 2019, 100.38 TWh in 2025. One TWh is a billion kWh.
Slowly. Business power use grew 3.9% from 2019 to 2025; the US grew 10.5%.
What makes Florida's power?
About the power mix
This is where the power generated in Florida came from in 2025: each source's share of what its power plants made, 268 terawatt-hours (TWh) in all. Small rooftop solar panels are not counted.
“Other sources” is the agency's catch-all group.
Natural gas made 73% of the power generated in Florida in 2025; nuclear made 11%.
Under 1% each: other sources, other biomass, wood, petroleum, hydro and other gases.
How much new power is proposed in Florida?
About proposed power plants
These are new power plants that companies have told the US Energy Information Administration they plan to open from 2026 to 2030. Plans can change or be dropped.
Sizes are net summer capacity: the most power a plant can send to the grid on a hot summer day. Each bar's length is its part of all the proposed power.
Companies have proposed 3,573 MW of new power plants for 2026 to 2030; solar is the largest source, 2,830 MW.
For scale, Florida's power plants could deliver 73,995 MW on a summer day in 2025.
Which grid serves Florida, and what are its water and hazard risks?
Utilities run their own grid areas for all of Florida's power sales. 4 natural hazards rate very high for Florida against other states.
Who runs Florida's power grid?
About the grid
A grid operator, called an ISO or RTO, runs the high-voltage power lines and the power market for a whole region. The share is how much of the state's 2025 power sales were made inside its area.
Where there is none, each utility runs its own part of the grid.
No grid operator: each utility runs its own part of the grid, for all of 2025 power sales.
How much water do Florida's power plants use?
About water taken in and used up
Taken in is the water power plants draw from rivers, lakes, wells or the sea to cool. Used up is the part that does not go back: most of it evaporates.
This is the water power plants use, not the water data centers use.
The 36 power plants in Florida that report their cooling water used up 58.9 billion gallons in 2024, 1.5% of the 3,964 billion they took in.
Which hazards cost Florida most?
About expected annual loss
FEMA's National Risk Index estimates each natural hazard's expected annual loss: the damage it is likely to cause in an average year. It rates each state against the other states, from very low to very high.
Hazards with the same rating are in the order of FEMA's score. Because each hazard is compared with other states, one can rate higher here and still cost fewer dollars than another.
Not rated: avalanche (not applicable), tsunami (insufficient data) and volcanic activity (not applicable).
Coastal flooding, hurricane and lightning rate highest for Florida against other states: very high for the damage they are likely to cause in an average year.
- Very highCoastal flooding, hurricane, lightning and strong wind
- Relatively highTornado, inland flooding, cold wave and wildfire
- Relatively moderateHeat wave
- Relatively lowHail, drought and winter weather
- Very lowEarthquake, landslide and ice storm
Who runs Florida's data centers?
About this count
Each building counts once, by the operator named in OpenStreetMap. 9 buildings have no operator named.
Flexential runs the most mapped buildings: 4.
More about Florida data centers
Questions about Florida data centers
How many data centers are in Florida?
Florida has 18 data center buildings mapped in OpenStreetMap, the 22nd most of any state, as of November 6, 2026. These counts are kept apart.
What county in Florida has the most data centers?
Miami-Dade County and Orange County tie for the most: 4 data center buildings each. They are mapped in OpenStreetMap. That is as of November 6, 2026. Hillsborough County is next, with 3.
Sources and updates
How this page was made: CamsAhead writes each page type once, then fills it with this place's data from the sources below.
- OpenStreetMap contributors: data center buildings, as of November 6, 2026; Open Database License (ODbL) 1.0, free copy on request.
- U.S. Energy Information Administration (EIA): Form EIA-861 (released Oct 2026) and Form EIA-861 2025 detailed data (released Oct 2026): business power prices and sales by state, grid operators and utilities by county; retrieved October 31, 2026.
- U.S. Energy Information Administration (EIA): Forms EIA-923/906/920 (released Sep 2026): power generated by source, 2025; retrieved October 31, 2026.
- U.S. Energy Information Administration (EIA): Form EIA-860 (released Sep 2026): power plants proposed for 2026 to 2030; retrieved October 31, 2026.
- U.S. Energy Information Administration (EIA): Form EIA-860 (released Sep 2026): power plant capacity by state, 2025; retrieved October 31, 2026.
- U.S. Energy Information Administration (EIA): thermoelectric cooling water data 2024, Forms EIA-860 and EIA-923 (retrieved Oct 2026): power plant cooling water by state.
- FEMA: National Risk Index v1.20 (December 2025), NRI_Table_Counties and NRI_Table_States: natural hazard ratings by county and expected annual loss by state; retrieved October 31, 2026. This product uses the Federal Emergency Management Agency's OpenFEMA API, but is not endorsed by FEMA. The Federal Government or FEMA cannot vouch for the data or analyses derived from these data after the data have been retrieved from the Agency's website(s).
CamsAhead's project records cover Prince William County, Virginia, not Florida.
How CamsAhead counts cameras · Report a problem · Report a camera