Florida Data Center Intelligence

Mapped Florida data center sites, with their power, water and risk

One app for every Florida county: data center sites, power, grid and FEMA risk, with hearing alerts and an API. 18 data center buildings are mapped in 7 of its 67 counties, and businesses pay 11.53¢ per kWh for power, 14% below the US average.

$390 a month3 seats · cancel any time

Where are Florida's data centers?

18 mapped buildings sit in 7 of Florida's 67 counties. Miami-Dade County has the most: 4.

Miami-Dade 4Orange 4Hillsborough 3Alachua 2Broward 2

    © OpenStreetMap contributors

    Which risks do the counties with data centers face?

    Hurricanes are the most common risk: 7 of the 7 counties with mapped data centers rate high for them.

    Bars: counties with mapped data centers that rate Relatively high or Very high . Tap one to show it on the map.

    All 67 counties as a table

    What will a Florida site pay for power, and how fast is demand growing?

    Business power in Florida costs 11.53¢ per kWh, 14% below the US, and demand grew 3.9% since 2019.

    What do businesses pay for power?

    11.53¢ per kWh in 2025, 14% below the US average of 13.37¢.

    • Businesses21st cheapest of 51
      Florida
      11.53¢
      US
      13.37¢

    How fast is business power demand growing?

    Business power use in Florida grew 3.9% since 2019, slower than the US (+10.5%).

    0%+10%Florida+3.9%US+10.5%2019’20’21’22’23’242025

    What makes Florida's power?

    268.3 TWh generated in 2025: natural gas 73%, nuclear 11%, solar 9%.

    • Natural gas73%
    • Nuclear11%
    • Solar9.3%
    • Coal3.8%

    Under 1% each: other (eia's catch-all), other biomass, wood, petroleum, hydro, other gases.

    How much new power is proposed?

    3,573 MW of new plants are proposed for 2026–2030, 5% of today's 73,995 MW: solar 79%, natural gas 15%, other 5%.

    • Solar2,830 MW
    • Natural gas538 MW
    • Other (EIA's catch-all)190 MW
    • Other biomass15 MW

    Which grid would a Florida site join, and what are its water and hazard risks?

    No ISO/RTO covers Florida's power sales; coastal flooding and hurricanes cost it most.

    Which grid serves Florida?

    Florida has no ISO/RTO : utilities balance their own areas for all of its retail sales.

    • No ISO/RTOAll

    Share of 2025 retail sales, by each utility's balancing authority .

    How much water do Florida's power plants use?

    Florida's power plants took in 3,964 billion gallons of water in 2024 to cool and returned about 98%; 58.9 billion gallons were used up .

    Returned 98.5%Used up 1.5%

    Which hazards cost Florida most?

    Coastal flooding and hurricanes are Florida's biggest risks: each rates very high against other states .

    • Coastal floodingVery high
    • HurricaneVery high
    • Inland floodingRelatively high
    • TornadoRelatively high
    • WildfireRelatively high
    • Heat waveRelatively moderate
    • DroughtRelatively low
    • EarthquakeVery low

    Who uses it, and what do they see first?

    Lawyers, brokers, site teams, utilities, insurers and investors each start from their own view of Florida's 67 counties.

    Land-use and energy lawyers

    Follow counties with data centers, their hearings and FEMA risk.

    • Miami-Dade County4 mapped · risk very high
    • Orange County4 mapped · risk relatively high
    • Hillsborough County3 mapped · risk relatively high
    7counties with data centers to follow, each with its planning and zoning agendas

    Land and industrial brokers

    Rank counties by mapped data center buildings, with the power price behind them.

    • Miami-Dade County4
    • Orange County4
    • Hillsborough County3
    • Alachua County2
    • Broward County2
    4mapped buildings in Miami-Dade County, the most in Florida

    Site selection teams

    Shortlist counties by mapped sites, power and risk on one map.

    7of 67 counties have mapped data centers

    Utilities and power buyers

    Follow prices, demand and the grid behind each site. Bars: business power sales since 2019.

    • Florida+3.9%
    • US+10.5%
    +3.9%business power sales since 2019, US +10.5%

    Insurers and lenders

    Bars: how many of the counties with data centers rate high for each hazard.

    • Hurricane7 of 7
    • Tornado7 of 7
    • Inland flooding6 of 7
    • Heat wave4 of 7
    7of 7 counties with mapped data centers rate high for at least one

    Investors and analysts

    See which new power plants are proposed, by source and size. Bars: MW proposed.

    • Solar2,830
    • Natural gas538
    • Other190
    • Other biomass15
    3,573MW of new plants proposed for 2026–2030

    What's inside Florida Data Center Intelligence?

    One app for all 67 Florida counties, plus hearing alerts and an API. Every screen below is filled with Florida's real data.

    The Intelligence app

    Every county's sites, power, water and risk on one screen, with your watchlist.

    app.camsahead.com/intelligence/florida
    OverviewMapSitesAI campusesProjectsPowerWaterRiskHearingsAlertsAPI
    18mapped buildings
    11.53¢business power, per kWh
    +1.7%business demand, last 12 months
    WatchlistMappedFloodHeatDrought
    Miami-Dade County4Very highhighmoderate
    Orange County4highmoderatelow
    Hillsborough County3highhighmoderate
    Alachua County2moderatemoderatelow
    Broward County2Very highhighlow

    Hearings and filings

    Follow counties and cases; get the agenda and the record when a hearing is posted.

    Hearings · Florida
    Florida · counties you follow Planning, zoning and utility agendas
    • Miami-Dade County4 mapped data center buildingsAgenda alerts
    • Orange County4 mapped data center buildingsAgenda alerts
    • Hillsborough County3 mapped data center buildingsAgenda alerts
    • Alachua County2 mapped data center buildingsAgenda alerts

    Alerts

    New projects, stage changes, hearings and data updates for what you follow, by email or in the app.

    Alerts · Florida
    • Power demandBusiness power sales +1.7% on the year before: 101.8 TWhEIA-861M, 2025-09 to 2026-08
    • Site riskMiami-Dade County (4 mapped buildings) rates Very high for inland floodingFEMA National Risk Index
    • New supply3,573 MW of new plants proposed for 2026–2030EIA-860

    Data API

    County, power, risk and project data as JSON for your own tools.

    api.camsahead.com
    GET /v1/counties/12086
    {
      "fips": "12086",
      "name": "Miami-Dade County",
      "state": "FL",
      "pop2025": 2802029,
      "pop_change_2020_pct": 3.7,
      "density_per_sqmi": 1474.8,
      "nri": {
        "risk_rating": "Very High",
        "ifld": {
          "rating": "Very High",
          "score": 99.7
    Show the full response
        },
        "hwav": {
          "rating": "Relatively High",
          "score": 99.3
        },
        "drgt": {
          "rating": "Relatively Moderate",
          "score": 79.1
        }
      },
      "grid": {
        "rtos": [],
        "utilities_n": 2
      },
      "state_power": {
        "commercial_cents_kwh": 11.53,
        "us_commercial_cents_kwh": 13.37,
        "as_of": "2025"
      }
    }

    What does it cost?

    Florida Data Center Intelligence is $390 a month for 3 seats.

    Florida Data Center Intelligence$390 a month
    • The Intelligence app: every county's sites, power, water and risk
    • Alerts on new projects, filings and hearings
    • Reports as web page, PDF and CSV
    • 3 seats · cancel any time
    Data APIFrom $999 a month
    • County, power, risk and project data as JSON
    • Keys for your own tools and models
    Public bodies$4,680 a year
    • Counties, cities, utilities and co-ops
    • Paid by invoice

    What stays open? The map, the county pages and every data center page stay open to everyone.

    Sources and updates

    How this page was made: CamsAhead writes each page type once, then fills it with this place's data from the sources below.

    • OpenStreetMap contributors: data center buildings, as of November 6, 2026; Open Database License (ODbL) 1.0, free copy on request.
    • U.S. Energy Information Administration (EIA): Form EIA-861 (released Oct 2026) and Form EIA-861 2025 detailed data (released Oct 2026): business power prices and sales by state, grid operators and utilities by county; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Forms EIA-923/906/920 (released Sep 2026): power generated by source, 2025; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Form EIA-860 (released Sep 2026): power plants proposed for 2026 to 2030; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Form EIA-860 (released Sep 2026): power plant capacity by state, 2025; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): thermoelectric cooling water data 2024, Forms EIA-860 and EIA-923 (retrieved Oct 2026): power plant cooling water by state.
    • FEMA: National Risk Index v1.20 (December 2025), NRI_Table_Counties and NRI_Table_States: natural hazard ratings by county and expected annual loss by state; retrieved October 31, 2026. This product uses the Federal Emergency Management Agency's OpenFEMA API, but is not endorsed by FEMA. The Federal Government or FEMA cannot vouch for the data or analyses derived from these data after the data have been retrieved from the Agency's website(s).
    • U.S. Census Bureau: US Census Bureau, Vintage 2025 county population estimates (co-est2025-alldata.csv): people by county.

    How CamsAhead counts cameras · Report a problem · Report a camera

    Add CamsAhead to your Home Screen Open in Safari to install Drive works best from your Home Screen Open in Safari to add it to your Home Screen

    It opens straight to the map.

    This app’s built-in browser can’t add CamsAhead to your Home Screen.

    From your Home Screen, CamsAhead opens full screen with one tap. It keeps the screen on while you drive, where your phone allows it.

    1. Tap Share
      In Safari’s toolbar, or in its ⋯ menu.
    2. Tap Share
      In your browser’s address bar or menu.
    3. Open this page in Safari
      Look for “Open in Safari” or “Open in browser” in this app’s menu, or copy the link.
    4. Copy the link, then paste it in Safari
      Or type CamsAhead.com in Safari.
    5. In Safari, tap Share, then Add to Home Screen
    6. Tap Add to Home Screen
      Scroll down the list if you don’t see it.
    7. Open the ⋮ menu
      Then tap “Add to Home screen” or “Install app”.
    8. Tap Add, then open CamsAhead from your Home Screen. Tap Install, then open CamsAhead from your Home Screen.

    Don’t see Add to Home Screen? Open this page in Safari.

    Or tap Share in this browser, then Add to Home Screen.

    Alerts work while CamsAhead is open on screen, from the Home Screen or the browser. If the screen locks or you switch apps, they stop.

    DriveBetaReport a problem