CamsAhead

Near me

Near me

Georgia Data Center Intelligence

Mapped Georgia data center sites, with their power, water and risk

One app for every Georgia county: data center sites, power, grid and FEMA risk, with hearing alerts and an API. 57 data center buildings are mapped in 8 of its 159 counties, and businesses pay 11.53¢ per kWh for power, 14% below the US average.

$390 a month3 seats · cancel any time

Where are Georgia's data centers?

57 mapped buildings sit in 8 of Georgia's 159 counties. Douglas County has the most: 20.

Douglas 20Fulton 20Fayette 4Gwinnett 4Newton 4

    © OpenStreetMap contributors

    Which risks do the counties with data centers face?

    Tornadoes are the most common risk: 4 of the 8 counties with mapped data centers rate high for them.

    Bars: counties with mapped data centers that rate Relatively high or Very high . Tap one to show it on the map.

    All 159 counties as a table

    What will a Georgia site pay for power, and how fast is demand growing?

    Business power in Georgia costs 11.53¢ per kWh, 14% below the US, and demand grew 20.5% since 2019.

    What do businesses pay for power?

    11.53¢ per kWh in 2025, 14% below the US average of 13.37¢.

    • Businesses22nd cheapest of 51
      Georgia
      11.53¢
      US
      13.37¢

    How fast is business power demand growing?

    Business power use in Georgia grew 20.5% since 2019, twice the US rate (+10.5%).

    0%+10%+20%Georgia+20.5%US+10.5%2019’20’21’22’23’242025

    What makes Georgia's power?

    145.7 TWh generated in 2025: natural gas 39%, nuclear 35%, coal 14%.

    • Natural gas39%
    • Nuclear35%
    • Coal14%
    • Solar7.7%
    • Wood3.1%
    • Hydro1.9%

    Under 1% each: other biomass, petroleum, other (eia's catch-all). Pumped storage used more power than it made, so it is left out.

    How much new power is proposed?

    7,594 MW of new plants are proposed for 2026–2030, about a fifth of today's 39,911 MW: solar 54%, natural gas 29%, other 16%.

    • Solar4,130 MW
    • Natural gas2,213 MW
    • Other (EIA's catch-all)1,251 MW

    Which grid would a Georgia site join, and what are its water and hazard risks?

    No ISO/RTO covers 99.9% of Georgia's power sales; tornadoes cost it most.

    Which grid serves Georgia?

    Most of Georgia has no ISO/RTO : utilities balance their own areas for 99.9% of retail sales.

    • No ISO/RTO99.9%

    Share of 2025 retail sales, by each utility's balancing authority .

    How much water do Georgia's power plants use?

    Georgia's power plants took in 106 billion gallons of water in 2024 to cool and returned about 52%; 50.8 billion gallons were used up .

    Returned 52.1%Used up 47.9%

    Which hazards cost Georgia most?

    Tornadoes are Georgia's biggest risk (relatively high) ; the rest rate moderate or lower.

    • TornadoRelatively high
    • Inland floodingRelatively moderate
    • Coastal floodingRelatively moderate
    • Heat waveRelatively moderate
    • HurricaneRelatively moderate
    • DroughtRelatively moderate
    • WildfireRelatively low
    • EarthquakeRelatively low

    Which AI campuses are in Georgia?

    Georgia has 3 AI campuses on the list; none of them is listed as being built.

    AI campuses in Georgia: CoreWeave Dalton 1 & 2, Microsoft Fairwater Atlanta, xAI QTS Atlanta.

    Who uses it, and what do they see first?

    Lawyers, brokers, site teams, utilities, insurers and investors each start from their own view of Georgia's 159 counties.

    Land-use and energy lawyers

    Follow counties with data centers, their hearings and FEMA risk.

    • Douglas County20 mapped · risk relatively low
    • Fulton County20 mapped · risk relatively high
    • Fayette County4 mapped · risk relatively low
    8counties with data centers to follow, each with its planning and zoning agendas

    Land and industrial brokers

    Rank counties by mapped data center buildings, with the power price behind them.

    • Douglas County20
    • Fulton County20
    • Fayette County4
    • Gwinnett County4
    • Newton County4
    20mapped buildings in Douglas County, the most in Georgia

    Site selection teams

    Shortlist counties by mapped sites, power and risk on one map.

    8of 159 counties have mapped data centers

    Utilities and power buyers

    Follow prices, demand and the grid behind each site. Bars: business power sales since 2019.

    • Georgia+20.5%
    • US+10.5%
    +20.5%business power sales since 2019, US +10.5%

    Insurers and lenders

    Bars: how many of the counties with data centers rate high for each hazard.

    • Tornado4 of 8
    • Inland flooding3 of 8
    • Drought0 of 8
    • Heat wave0 of 8
    4of 8 counties with mapped data centers rate high for at least one

    Investors and analysts

    See which new power plants are proposed, by source and size. Bars: MW proposed.

    • Solar4,130
    • Natural gas2,213
    • Other1,251
    7,594MW of new plants proposed for 2026–2030

    What's inside Georgia Data Center Intelligence?

    One app for all 159 Georgia counties, plus hearing alerts and an API. Every screen below is filled with Georgia's real data.

    The Intelligence app

    Every county's sites, power, water and risk on one screen, with your watchlist.

    app.camsahead.com/intelligence/georgia
    OverviewMapSitesAI campusesProjectsPowerWaterRiskHearingsAlertsAPI
    57mapped buildings
    3AI campuses
    11.53¢business power, per kWh
    +6.1%business demand, last 12 months
    WatchlistMappedFloodHeatDrought
    Douglas County20lowlownot rated
    Fulton County20highmoderatenot rated
    Fayette County4lowlowlow
    Gwinnett County4highmoderatelow
    Newton County4lowlowlow

    Hearings and filings

    Follow counties and cases; get the agenda and the record when a hearing is posted.

    Hearings · Georgia
    Georgia · counties you follow Planning, zoning and utility agendas
    • Douglas County20 mapped data center buildingsAgenda alerts
    • Fulton County20 mapped data center buildingsAgenda alerts
    • Fayette County4 mapped data center buildingsAgenda alerts
    • Gwinnett County4 mapped data center buildingsAgenda alerts

    Alerts

    New projects, stage changes, hearings and data updates for what you follow, by email or in the app.

    Alerts · Georgia
    • Power demandBusiness power sales +6.1% on the year before: 59.7 TWhEIA-861M, 2025-09 to 2026-08
    • Site riskFulton County (20 mapped buildings) rates Relatively high for inland floodingFEMA National Risk Index
    • New supply7,594 MW of new plants proposed for 2026–2030EIA-860

    Data API

    County, power, risk and project data as JSON for your own tools.

    api.camsahead.com
    GET /v1/counties/13097
    {
      "fips": "13097",
      "name": "Douglas County",
      "state": "GA",
      "pop2025": 154293,
      "pop_change_2020_pct": 6.9,
      "density_per_sqmi": 770.9,
      "nri": {
        "risk_rating": "Relatively Low",
        "ifld": {
          "rating": "Relatively Low",
          "score": 70.5
    Show the full response
        },
        "hwav": {
          "rating": "Relatively Low",
          "score": 58.7
        }
      },
      "grid": {
        "rtos": [],
        "utilities_n": 2
      },
      "state_power": {
        "commercial_cents_kwh": 11.53,
        "us_commercial_cents_kwh": 13.37,
        "as_of": "2025"
      }
    }

    What does it cost?

    Georgia Data Center Intelligence is $390 a month for 3 seats.

    Georgia Data Center Intelligence$390 a month
    • The Intelligence app: every county's sites, power, water and risk
    • Alerts on new projects, filings and hearings
    • Reports as web page, PDF and CSV
    • 3 seats · cancel any time
    Data APIFrom $999 a month
    • County, power, risk and project data as JSON
    • Keys for your own tools and models
    Public bodies$4,680 a year
    • Counties, cities, utilities and co-ops
    • Paid by invoice

    What stays open? The map, the county pages and every data center page stay open to everyone.

    Sources and updates

    How this page was made: CamsAhead writes each page type once, then fills it with this place's data from the sources below.

    • OpenStreetMap contributors: data center buildings, as of November 6, 2026; Open Database License (ODbL) 1.0, free copy on request.
    • Epoch AI: "AI data centers", CC BY 4.0, retrieved November 7, 2026; changes noted.
    • U.S. Energy Information Administration (EIA): Form EIA-861 (released Oct 2026) and Form EIA-861 2025 detailed data (released Oct 2026): business power prices and sales by state, grid operators and utilities by county; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Forms EIA-923/906/920 (released Sep 2026): power generated by source, 2025; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Form EIA-860 (released Sep 2026): power plants proposed for 2026 to 2030; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Form EIA-860 (released Sep 2026): power plant capacity by state, 2025; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): thermoelectric cooling water data 2024, Forms EIA-860 and EIA-923 (retrieved Oct 2026): power plant cooling water by state.
    • FEMA: National Risk Index v1.20 (December 2025), NRI_Table_Counties and NRI_Table_States: natural hazard ratings by county and expected annual loss by state; retrieved October 31, 2026. This product uses the Federal Emergency Management Agency's OpenFEMA API, but is not endorsed by FEMA. The Federal Government or FEMA cannot vouch for the data or analyses derived from these data after the data have been retrieved from the Agency's website(s).
    • U.S. Census Bureau: US Census Bureau, Vintage 2025 county population estimates (co-est2025-alldata.csv): people by county.

    How CamsAhead counts cameras · Report a problem · Report a camera

    Add CamsAhead to your Home Screen Open in Safari to install Drive works best from your Home Screen Open in Safari to add it to your Home Screen

    It opens straight to the map.

    This app’s built-in browser can’t add CamsAhead to your Home Screen.

    From your Home Screen, CamsAhead opens full screen with one tap. It keeps the screen on while you drive, where your phone allows it.

    1. Tap Share
      In Safari’s toolbar, or in its ⋯ menu.
    2. Tap Share
      In your browser’s address bar or menu.
    3. Open this page in Safari
      Look for “Open in Safari” or “Open in browser” in this app’s menu, or copy the link.
    4. Copy the link, then paste it in Safari
      Or type CamsAhead.com in Safari.
    5. In Safari, tap Share, then Add to Home Screen
    6. Tap Add to Home Screen
      Scroll down the list if you don’t see it.
    7. Open the ⋮ menu
      Then tap “Add to Home screen” or “Install app”.
    8. Tap Add, then open CamsAhead from your Home Screen. Tap Install, then open CamsAhead from your Home Screen.

    Don’t see Add to Home Screen? Open this page in Safari.

    Or tap Share in this browser, then Add to Home Screen.

    Alerts work while CamsAhead is open on screen, from the Home Screen or the browser. If the screen locks or you switch apps, they stop.

    DriveBetaReport a problem