Illinois Data Center Intelligence

Mapped Illinois data center sites, with their power, water and risk

One app for every Illinois county: data center sites, power, grid and FEMA risk, with hearing alerts and an API. 57 data center buildings are mapped in 6 of its 102 counties, and businesses pay 13.10¢ per kWh for power, 2% below the US average.

$390 a month3 seats · cancel any time

Where are Illinois's data centers?

57 mapped buildings sit in 6 of Illinois's 102 counties. Cook County has the most: 32.

Cook 32DuPage 19DeKalb 3Champaign 1Lake 1

    © OpenStreetMap contributors

    Which risks do the counties with data centers face?

    Tornadoes are the most common risk: 5 of the 6 counties with mapped data centers rate high for them.

    Bars: counties with mapped data centers that rate Relatively high or Very high . Tap one to show it on the map.

    All 102 counties as a table

    What will a Illinois site pay for power, and how fast is demand growing?

    Business power in Illinois costs 13.10¢ per kWh, 2% below the US, and demand fell 5.9% since 2019.

    What do businesses pay for power?

    13.10¢ per kWh in 2025, 2% below the US average of 13.37¢.

    • Businesses18th most expensive of 51
      Illinois
      13.10¢
      US
      13.37¢

    How fast is business power demand growing?

    Business power use in Illinois fell 5.9% since 2019, while the US grew 10.5%.

    0%+10%Illinois−5.9%US+10.5%2019’20’21’22’23’242025

    What makes Illinois's power?

    191.8 TWh generated in 2025: nuclear 51%, coal 16%, natural gas 16%.

    • Nuclear51%
    • Coal16%
    • Natural gas16%
    • Wind13%
    • Solar3.5%

    Under 1% each: other (eia's catch-all), other biomass, other gases, hydro, petroleum.

    How much new power is proposed?

    8,647 MW of new plants are proposed for 2026–2030, about a fifth of today's 48,270 MW: solar 56%, wind 29%, natural gas 12%, other 2%.

    • Solar4,824 MW
    • Wind2,542 MW
    • Natural gas1,056 MW
    • Other (EIA's catch-all)202 MW
    • Hydro20 MW
    • Petroleum2 MW

    Which grid would a Illinois site join, and what are its water and hazard risks?

    PJM serves 66.5% of Illinois's power sales; inland flooding, heat waves, tornadoes and drought cost it most.

    Which grid serves Illinois?

    PJM serves 66.5% of Illinois's retail power sales.

    • PJM66.5%
    • MISO33.4%

    Share of 2025 retail sales, by each utility's balancing authority .

    How much water do Illinois's power plants use?

    Illinois's power plants took in 3,485 billion gallons of water in 2024 to cool and returned about 98%; 67.4 billion gallons were used up .

    Returned 98.1%Used up 1.9%

    Which hazards cost Illinois most?

    Inland flooding, heat waves, tornadoes and drought are Illinois's biggest risks: each rates relatively high against other states .

    • Inland floodingRelatively high
    • Heat waveRelatively high
    • TornadoRelatively high
    • DroughtRelatively high
    • EarthquakeRelatively moderate
    • Coastal floodingVery low
    • HurricaneVery low
    • WildfireVery low

    Who uses it, and what do they see first?

    Lawyers, brokers, site teams, utilities, insurers and investors each start from their own view of Illinois's 102 counties.

    Land-use and energy lawyers

    Follow counties with data centers, their hearings and FEMA risk.

    • Cook County32 mapped · risk very high
    • DuPage County19 mapped · risk relatively high
    • DeKalb County3 mapped · risk relatively low
    6counties with data centers to follow, each with its planning and zoning agendas

    Land and industrial brokers

    Rank counties by mapped data center buildings, with the power price behind them.

    • Cook County32
    • DuPage County19
    • DeKalb County3
    • Champaign County1
    • Lake County1
    32mapped buildings in Cook County, the most in Illinois

    Site selection teams

    Shortlist counties by mapped sites, power and risk on one map.

    6of 102 counties have mapped data centers

    Utilities and power buyers

    Follow prices, demand and the grid behind each site. Bars: business power sales since 2019.

    • Illinois−5.9%
    • US+10.5%
    −5.9%business power sales since 2019, US +10.5%

    Insurers and lenders

    Bars: how many of the counties with data centers rate high for each hazard.

    • Tornado5 of 6
    • Inland flooding3 of 6
    • Heat wave2 of 6
    • Drought1 of 6
    5of 6 counties with mapped data centers rate high for at least one

    Investors and analysts

    See which new power plants are proposed, by source and size. Bars: MW proposed.

    • Solar4,824
    • Wind2,542
    • Natural gas1,056
    • Other202
    8,647MW of new plants proposed for 2026–2030

    What's inside Illinois Data Center Intelligence?

    One app for all 102 Illinois counties, plus hearing alerts and an API. Every screen below is filled with Illinois's real data.

    The Intelligence app

    Every county's sites, power, water and risk on one screen, with your watchlist.

    app.camsahead.com/intelligence/illinois
    OverviewMapSitesAI campusesProjectsPowerWaterRiskHearingsAlertsAPI
    57mapped buildings
    13.10¢business power, per kWh
    −0.4%business demand, last 12 months
    WatchlistMappedFloodHeatDrought
    Cook County32Very highVery highVery low
    DuPage County19highmoderateVery low
    DeKalb County3moderatelowmoderate
    Champaign County1moderatemoderatehigh
    Lake County1highmoderatelow

    Hearings and filings

    Follow counties and cases; get the agenda and the record when a hearing is posted.

    Hearings · Illinois
    Illinois · counties you follow Planning, zoning and utility agendas
    • Cook County32 mapped data center buildingsAgenda alerts
    • DuPage County19 mapped data center buildingsAgenda alerts
    • DeKalb County3 mapped data center buildingsAgenda alerts
    • Champaign County1 mapped data center buildingsAgenda alerts

    Alerts

    New projects, stage changes, hearings and data updates for what you follow, by email or in the app.

    Alerts · Illinois
    • Power demandBusiness power sales −0.4% on the year before: 45.9 TWhEIA-861M, 2025-09 to 2026-08
    • Site riskCook County (32 mapped buildings) rates Very high for inland floodingFEMA National Risk Index
    • New supply8,647 MW of new plants proposed for 2026–2030EIA-860

    Data API

    County, power, risk and project data as JSON for your own tools.

    api.camsahead.com
    GET /v1/counties/17031
    {
      "fips": "17031",
      "name": "Cook County",
      "state": "IL",
      "pop2025": 5194625,
      "pop_change_2020_pct": -1.6,
      "density_per_sqmi": 5497.4,
      "nri": {
        "risk_rating": "Very High",
        "ifld": {
          "rating": "Very High",
          "score": 99.9
    Show the full response
        },
        "hwav": {
          "rating": "Very High",
          "score": 99.8
        },
        "drgt": {
          "rating": "Very Low",
          "score": 25.7
        }
      },
      "grid": {
        "rtos": [
          "PJM"
        ],
        "utilities_n": 3
      },
      "state_power": {
        "commercial_cents_kwh": 13.1,
        "us_commercial_cents_kwh": 13.37,
        "as_of": "2025"
      }
    }

    What does it cost?

    Illinois Data Center Intelligence is $390 a month for 3 seats.

    Illinois Data Center Intelligence$390 a month
    • The Intelligence app: every county's sites, power, water and risk
    • Alerts on new projects, filings and hearings
    • Reports as web page, PDF and CSV
    • 3 seats · cancel any time
    Data APIFrom $999 a month
    • County, power, risk and project data as JSON
    • Keys for your own tools and models
    Public bodies$4,680 a year
    • Counties, cities, utilities and co-ops
    • Paid by invoice

    What stays open? The map, the county pages and every data center page stay open to everyone.

    Sources and updates

    How this page was made: CamsAhead writes each page type once, then fills it with this place's data from the sources below.

    • OpenStreetMap contributors: data center buildings, as of November 6, 2026; Open Database License (ODbL) 1.0, free copy on request.
    • U.S. Energy Information Administration (EIA): Form EIA-861 (released Oct 2026) and Form EIA-861 2025 detailed data (released Oct 2026): business power prices and sales by state, grid operators and utilities by county; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Forms EIA-923/906/920 (released Sep 2026): power generated by source, 2025; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Form EIA-860 (released Sep 2026): power plants proposed for 2026 to 2030; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Form EIA-860 (released Sep 2026): power plant capacity by state, 2025; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): thermoelectric cooling water data 2024, Forms EIA-860 and EIA-923 (retrieved Oct 2026): power plant cooling water by state.
    • FEMA: National Risk Index v1.20 (December 2025), NRI_Table_Counties and NRI_Table_States: natural hazard ratings by county and expected annual loss by state; retrieved October 31, 2026. This product uses the Federal Emergency Management Agency's OpenFEMA API, but is not endorsed by FEMA. The Federal Government or FEMA cannot vouch for the data or analyses derived from these data after the data have been retrieved from the Agency's website(s).
    • U.S. Census Bureau: US Census Bureau, Vintage 2025 county population estimates (co-est2025-alldata.csv): people by county.

    How CamsAhead counts cameras · Report a problem · Report a camera

    Add CamsAhead to your Home Screen Open in Safari to install Drive works best from your Home Screen Open in Safari to add it to your Home Screen

    It opens straight to the map.

    This app’s built-in browser can’t add CamsAhead to your Home Screen.

    From your Home Screen, CamsAhead opens full screen with one tap. It keeps the screen on while you drive, where your phone allows it.

    1. Tap Share
      In Safari’s toolbar, or in its ⋯ menu.
    2. Tap Share
      In your browser’s address bar or menu.
    3. Open this page in Safari
      Look for “Open in Safari” or “Open in browser” in this app’s menu, or copy the link.
    4. Copy the link, then paste it in Safari
      Or type CamsAhead.com in Safari.
    5. In Safari, tap Share, then Add to Home Screen
    6. Tap Add to Home Screen
      Scroll down the list if you don’t see it.
    7. Open the ⋮ menu
      Then tap “Add to Home screen” or “Install app”.
    8. Tap Add, then open CamsAhead from your Home Screen. Tap Install, then open CamsAhead from your Home Screen.

    Don’t see Add to Home Screen? Open this page in Safari.

    Or tap Share in this browser, then Add to Home Screen.

    Alerts work while CamsAhead is open on screen, from the Home Screen or the browser. If the screen locks or you switch apps, they stop.

    DriveBetaReport a problem