Iowa Data Center Intelligence

Mapped Iowa data center sites, with their power, water and risk

One app for every Iowa county: data center sites, power, grid and FEMA risk, with hearing alerts and an API. 60 data center buildings are mapped in 6 of its 99 counties, and businesses pay 10.84¢ per kWh for power, 19% below the US average.

$390 a month3 seats · cancel any time

Where are Iowa's data centers?

60 mapped buildings sit in 6 of Iowa's 99 counties. Polk County has the most: 24.

Polk 24Pottawattamie 20Dallas 9Warren 5Johnson 1

    © OpenStreetMap contributors

    Which risks do the counties with data centers face?

    Drought is the most common risk: 3 of the 6 counties with mapped data centers rate high for it.

    Bars: counties with mapped data centers that rate Relatively high or Very high . Tap one to show it on the map.

    All 99 counties as a table

    What will a Iowa site pay for power, and how fast is demand growing?

    Business power in Iowa costs 10.84¢ per kWh, 19% below the US, and demand grew 10.7% since 2019.

    What do businesses pay for power?

    10.84¢ per kWh in 2025, 19% below the US average of 13.37¢.

    • Businesses15th cheapest of 51
      Iowa
      10.84¢
      US
      13.37¢

    How fast is business power demand growing?

    Business power use in Iowa grew 10.7% since 2019, about the US rate (+10.5%).

    0%+10%Iowa+10.7%US+10.5%2019’20’21’22’23’242025

    What makes Iowa's power?

    74.5 TWh generated in 2025: wind 59%, coal 26%, natural gas 12%.

    • Wind59%
    • Coal26%
    • Natural gas12%
    • Solar1.7%
    • Hydro1.5%

    Under 1% each: other biomass, petroleum, other (eia's catch-all).

    How much new power is proposed?

    1,160 MW of new plants are proposed for 2026–2030, 5% of today's 23,658 MW: solar 67%, wind 22%, other 9%, natural gas 3%.

    • Solar776 MW
    • Wind252 MW
    • Other (EIA's catch-all)99 MW
    • Natural gas33 MW

    Which grid would a Iowa site join, and what are its water and hazard risks?

    MISO serves 92.5% of Iowa's power sales; tornadoes and drought cost it most.

    Which grid serves Iowa?

    MISO serves 92.5% of Iowa's retail power sales.

    • MISO92.5%
    • SPP6.4%
    • No ISO/RTO1.1%

    Share of 2025 retail sales, by each utility's balancing authority .

    How much water do Iowa's power plants use?

    Iowa's power plants took in 416 billion gallons of water in 2024 to cool and returned about 98%; 4.9 billion gallons were used up .

    Returned 98.8%Used up 1.2%

    Which hazards cost Iowa most?

    Tornadoes and drought are Iowa's biggest risks: each rates relatively high against other states .

    • TornadoRelatively high
    • DroughtRelatively high
    • Inland floodingRelatively moderate
    • Heat waveRelatively moderate
    • WildfireRelatively low
    • HurricaneVery low
    • EarthquakeVery low

    Which AI campuses are being built in Iowa, and how big will they be?

    Iowa has 4 AI campuses on the list; 2 are being built, 1,394 MW planned in all. The biggest, QTS Cedar Rapids, is planned at 1,133 MW , full size by Nov 2027.

    • QTS Cedar RapidsLinn County
      1,133 MWexpected first online Dec 2026 · full size Nov 2027
    • 261 MWexpected first online Dec 2026 · full size May 2027

    Bars: IT power expected at full size . Dates are Epoch AI's own estimates .

    Other AI campuses in Iowa: Google Council Bluffs (East), Microsoft Project Osmium.

    Campuses without a county on record: Microsoft Project Osmium. They are left off the county map.

    Who uses it, and what do they see first?

    Lawyers, brokers, site teams, utilities, insurers and investors each start from their own view of Iowa's 99 counties.

    Land-use and energy lawyers

    Follow counties with data centers, their hearings and FEMA risk.

    • Polk County24 mapped · risk relatively moderate
    • Pottawattamie County20 mapped · risk relatively low
    • Dallas County9 mapped · risk relatively low
    6counties with data centers to follow, each with its planning and zoning agendas

    Land and industrial brokers

    Rank counties by mapped data center buildings, with the power price behind them.

    • Polk County24
    • Pottawattamie County20
    • Dallas County9
    • Warren County5
    • Johnson County1
    24mapped buildings in Polk County, the most in Iowa

    Site selection teams

    Shortlist counties by mapped sites, power and risk on one map.

    6of 99 counties have mapped data centers

    Utilities and power buyers

    Follow prices, demand and the grid behind each site. Bars: business power sales since 2019.

    • Iowa+10.7%
    • US+10.5%
    +10.7%business power sales since 2019, US +10.5%

    Insurers and lenders

    Bars: how many of the counties with data centers rate high for each hazard.

    • Drought3 of 6
    • Tornado3 of 6
    • Heat wave1 of 6
    • Hurricane0 of 6
    5of 6 counties with mapped data centers rate high for at least one

    Investors and analysts

    Track AI campuses being built, their owners and users. Bars: MW expected at full size.

    • QTS Cedar Rapids1,133 MW
    • Google Cedar Rapids261 MW
    1,394MW planned at 2 AI campuses being built

    What's inside Iowa Data Center Intelligence?

    One app for all 99 Iowa counties, plus hearing alerts and an API. Every screen below is filled with Iowa's real data.

    The Intelligence app

    Every county's sites, power, water and risk on one screen, with your watchlist.

    app.camsahead.com/intelligence/iowa
    OverviewMapSitesAI campusesProjectsPowerWaterRiskHearingsAlertsAPI
    60mapped buildings
    4AI campuses
    10.84¢business power, per kWh
    +1.3%business demand, last 12 months
    WatchlistMappedFloodHeatDrought
    Polk County24moderatehighhigh
    Pottawattamie County20moderatemoderatemoderate
    Dallas County9lowlowhigh
    Warren County5lowlowhigh
    Johnson County1moderatemoderatemoderate

    Hearings and filings

    Follow counties and cases; get the agenda and the record when a hearing is posted.

    Hearings · Iowa
    Iowa · counties you follow Planning, zoning and utility agendas
    • Polk County24 mapped data center buildingsAgenda alerts
    • Pottawattamie County20 mapped data center buildingsAgenda alerts
    • Dallas County9 mapped data center buildingsAgenda alerts
    • Warren County5 mapped data center buildingsAgenda alerts

    Alerts

    New projects, stage changes, hearings and data updates for what you follow, by email or in the app.

    Alerts · Iowa
    • Power demandBusiness power sales +1.3% on the year before: 13.6 TWhEIA-861M, 2025-09 to 2026-08
    • Site riskPolk County (24 mapped buildings) rates Relatively high for heat waveFEMA National Risk Index
    • AI campus being builtQTS Cedar Rapids: 1,133 MW of IT power expected · first online Dec 2026 · full size Nov 2027Epoch AI

    Data API

    County, power, risk and project data as JSON for your own tools.

    api.camsahead.com
    GET /v1/counties/19153
    {
      "fips": "19153",
      "name": "Polk County",
      "state": "IA",
      "pop2025": 516546,
      "pop_change_2020_pct": 4.9,
      "density_per_sqmi": 901.9,
      "nri": {
        "risk_rating": "Relatively Moderate",
        "ifld": {
          "rating": "Relatively Moderate",
          "score": 92.1
    Show the full response
        },
        "hwav": {
          "rating": "Relatively High",
          "score": 96.7
        },
        "drgt": {
          "rating": "Relatively High",
          "score": 94.8
        }
      },
      "grid": {
        "rtos": [
          "MISO"
        ],
        "utilities_n": 5
      },
      "state_power": {
        "commercial_cents_kwh": 10.84,
        "us_commercial_cents_kwh": 13.37,
        "as_of": "2025"
      }
    }

    What does it cost?

    Iowa Data Center Intelligence is $390 a month for 3 seats.

    Iowa Data Center Intelligence$390 a month
    • The Intelligence app: every county's sites, power, water and risk
    • Alerts on new projects, filings and hearings
    • Reports as web page, PDF and CSV
    • 3 seats · cancel any time
    Data APIFrom $999 a month
    • County, power, risk and project data as JSON
    • Keys for your own tools and models
    Public bodies$4,680 a year
    • Counties, cities, utilities and co-ops
    • Paid by invoice

    What stays open? The map, the county pages and every data center page stay open to everyone.

    Sources and updates

    How this page was made: CamsAhead writes each page type once, then fills it with this place's data from the sources below.

    • OpenStreetMap contributors: data center buildings, as of November 6, 2026; Open Database License (ODbL) 1.0, free copy on request.
    • Epoch AI: "AI data centers", CC BY 4.0, retrieved November 7, 2026; changes noted.
    • U.S. Energy Information Administration (EIA): Form EIA-861 (released Oct 2026) and Form EIA-861 2025 detailed data (released Oct 2026): business power prices and sales by state, grid operators and utilities by county; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Forms EIA-923/906/920 (released Sep 2026): power generated by source, 2025; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Form EIA-860 (released Sep 2026): power plants proposed for 2026 to 2030; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Form EIA-860 (released Sep 2026): power plant capacity by state, 2025; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): thermoelectric cooling water data 2024, Forms EIA-860 and EIA-923 (retrieved Oct 2026): power plant cooling water by state.
    • FEMA: National Risk Index v1.20 (December 2025), NRI_Table_Counties and NRI_Table_States: natural hazard ratings by county and expected annual loss by state; retrieved October 31, 2026. This product uses the Federal Emergency Management Agency's OpenFEMA API, but is not endorsed by FEMA. The Federal Government or FEMA cannot vouch for the data or analyses derived from these data after the data have been retrieved from the Agency's website(s).
    • U.S. Census Bureau: US Census Bureau, Vintage 2025 county population estimates (co-est2025-alldata.csv): people by county.

    How CamsAhead counts cameras · Report a problem · Report a camera

    Add CamsAhead to your Home Screen Open in Safari to install Drive works best from your Home Screen Open in Safari to add it to your Home Screen

    It opens straight to the map.

    This app’s built-in browser can’t add CamsAhead to your Home Screen.

    From your Home Screen, CamsAhead opens full screen with one tap. It keeps the screen on while you drive, where your phone allows it.

    1. Tap Share
      In Safari’s toolbar, or in its ⋯ menu.
    2. Tap Share
      In your browser’s address bar or menu.
    3. Open this page in Safari
      Look for “Open in Safari” or “Open in browser” in this app’s menu, or copy the link.
    4. Copy the link, then paste it in Safari
      Or type CamsAhead.com in Safari.
    5. In Safari, tap Share, then Add to Home Screen
    6. Tap Add to Home Screen
      Scroll down the list if you don’t see it.
    7. Open the ⋮ menu
      Then tap “Add to Home screen” or “Install app”.
    8. Tap Add, then open CamsAhead from your Home Screen. Tap Install, then open CamsAhead from your Home Screen.

    Don’t see Add to Home Screen? Open this page in Safari.

    Or tap Share in this browser, then Add to Home Screen.

    Alerts work while CamsAhead is open on screen, from the Home Screen or the browser. If the screen locks or you switch apps, they stop.

    DriveBetaReport a problem