One app for every Missouri county or city: data center sites, power, grid and FEMA risk, with hearing alerts and an API. 22 data center buildings are mapped in 8 of its 115 counties and cities, and businesses pay 10.46¢ per kWh for power, 22% below the US average.

$390 a month3 seats · cancel any time

Where are Missouri's data centers?

22 mapped buildings sit in 8 of Missouri's 115 counties and cities. Clay County has the most: 7.

Clay 7Platte 5Jackson 3St. Louis city 3Adair 1

    © OpenStreetMap contributors

    Which risks do the counties and cities with data centers face?

    Tornadoes are the most common risk: 5 of the 8 counties and cities with mapped data centers rate high for them.

    Bars: counties and cities with mapped data centers that rate Relatively high or Very high . Tap one to show it on the map.

    All 115 counties and cities as a table

    What will a Missouri site pay for power, and how fast is demand growing?

    Business power in Missouri costs 10.46¢ per kWh, 22% below the US, and demand grew 0.8% since 2019.

    What do businesses pay for power?

    10.46¢ per kWh in 2025, 22% below the US average of 13.37¢.

    • Businesses12th cheapest of 51
      Missouri
      10.46¢
      US
      13.37¢

    How fast is business power demand growing?

    Business power use in Missouri grew 0.8% since 2019, slower than the US (+10.5%).

    0%+10%Missouri+0.8%US+10.5%2019’20’21’22’23’242025

    What makes Missouri's power?

    71.5 TWh generated in 2025: coal 64%, natural gas 12%, nuclear 10%.

    • Coal64%
    • Natural gas12%
    • Nuclear9.9%
    • Wind9.1%
    • Solar2.2%
    • Hydro1.6%

    Under 1% each: petroleum, pumped storage, other biomass, wood.

    How much new power is proposed?

    4,067 MW of new plants are proposed for 2026–2030, about a fifth of today's 21,366 MW: natural gas 42%, solar 42%, other 11%, wind 6%.

    • Natural gas1,698 MW
    • Solar1,691 MW
    • Other (EIA's catch-all)431 MW
    • Wind247 MW

    Which grid would a Missouri site join, and what are its water and hazard risks?

    MISO serves 44.8% of Missouri's power sales; heat waves cost it most.

    Which grid serves Missouri?

    MISO serves 44.8% of Missouri's retail power sales.

    • MISO44.8%
    • SPP35.2%
    • No ISO/RTO20%

    Share of 2025 retail sales, by each utility's balancing authority .

    How much water do Missouri's power plants use?

    Missouri's power plants took in 1,593 billion gallons of water in 2024 to cool and returned more than 99%; 14.3 billion gallons were used up .

    Returned 99.1%Used up 0.9%

    Which hazards cost Missouri most?

    Heat waves are Missouri's biggest risk (very high) ; the rest rate relatively high or lower.

    • Heat waveVery high
    • TornadoRelatively high
    • Inland floodingRelatively moderate
    • DroughtRelatively moderate
    • EarthquakeRelatively moderate
    • WildfireRelatively low
    • HurricaneVery low

    Which AI campuses are in Missouri?

    Missouri has 1 AI campus on the list; none of them is listed as being built.

    AI campuses in Missouri: Google Kansas City East.

    Campuses without a county on record: Google Kansas City East. They are left off the county map.

    Who uses it, and what do they see first?

    Lawyers, brokers, site teams, utilities, insurers and investors each start from their own view of Missouri's 115 counties and cities.

    Land-use and energy lawyers

    Follow counties and cities with data centers, their hearings and FEMA risk.

    • Clay County7 mapped · risk relatively moderate
    • Platte County5 mapped · risk relatively low
    • Jackson County3 mapped · risk relatively high
    8counties and cities with data centers to follow, each with its planning and zoning agendas

    Land and industrial brokers

    Rank counties and cities by mapped data center buildings, with the power price behind them.

    • Clay County7
    • Platte County5
    • Jackson County3
    • St. Louis city3
    • Adair County1
    7mapped buildings in Clay County, the most in Missouri

    Site selection teams

    Shortlist counties and cities by mapped sites, power and risk on one map.

    8of 115 counties and cities have mapped data centers

    Utilities and power buyers

    Follow prices, demand and the grid behind each site. Bars: business power sales since 2019.

    • Missouri+0.8%
    • US+10.5%
    +0.8%business power sales since 2019, US +10.5%

    Insurers and lenders

    Bars: how many of the counties and cities with data centers rate high for each hazard.

    • Tornado5 of 8
    • Heat wave3 of 8
    • Inland flooding3 of 8
    • Drought0 of 8
    5of 8 counties and cities with mapped data centers rate high for at least one

    Investors and analysts

    See which new power plants are proposed, by source and size. Bars: MW proposed.

    • Natural gas1,698
    • Solar1,691
    • Other431
    • Wind247
    4,067MW of new plants proposed for 2026–2030

    What's inside Missouri Data Center Intelligence?

    One app for all 115 Missouri counties and cities, plus hearing alerts and an API. Every screen below is filled with Missouri's real data.

    The Intelligence app

    Every county or city's sites, power, water and risk on one screen, with your watchlist.

    app.camsahead.com/intelligence/missouri
    OverviewMapSitesAI campusesProjectsPowerWaterRiskHearingsAlertsAPI
    22mapped buildings
    1AI campus
    10.46¢business power, per kWh
    +3.6%business demand, last 12 months
    WatchlistMappedFloodHeatDrought
    Clay County7moderatehighlow
    Platte County5lowmoderatelow
    Jackson County3highhighlow
    St. Louis city3highVery highnot rated
    Adair County1Very lowlowlow

    Hearings and filings

    Follow counties and cities and cases; get the agenda and the record when a hearing is posted.

    Hearings · Missouri
    Missouri · counties and cities you follow Planning, zoning and utility agendas
    • Clay County7 mapped data center buildingsAgenda alerts
    • Platte County5 mapped data center buildingsAgenda alerts
    • Jackson County3 mapped data center buildingsAgenda alerts
    • St. Louis city3 mapped data center buildingsAgenda alerts

    Alerts

    New projects, stage changes, hearings and data updates for what you follow, by email or in the app.

    Alerts · Missouri
    • Power demandBusiness power sales +3.6% on the year before: 31.1 TWhEIA-861M, 2025-09 to 2026-08
    • Site riskClay County (7 mapped buildings) rates Relatively high for heat waveFEMA National Risk Index
    • New supply4,067 MW of new plants proposed for 2026–2030EIA-860

    Data API

    County, power, risk and project data as JSON for your own tools.

    api.camsahead.com
    GET /v1/counties/29047
    {
      "fips": "29047",
      "name": "Clay County",
      "state": "MO",
      "pop2025": 265032,
      "pop_change_2020_pct": 4.6,
      "density_per_sqmi": 666.5,
      "nri": {
        "risk_rating": "Relatively Moderate",
        "ifld": {
          "rating": "Relatively Moderate",
          "score": 87.8
    Show the full response
        },
        "hwav": {
          "rating": "Relatively High",
          "score": 96.7
        },
        "drgt": {
          "rating": "Relatively Low",
          "score": 43.5
        }
      },
      "grid": {
        "rtos": [
          "MISO",
          "SPP"
        ],
        "utilities_n": 4
      },
      "state_power": {
        "commercial_cents_kwh": 10.46,
        "us_commercial_cents_kwh": 13.37,
        "as_of": "2025"
      }
    }

    What does it cost?

    Missouri Data Center Intelligence is $390 a month for 3 seats.

    Missouri Data Center Intelligence$390 a month
    • The Intelligence app: every county or city's sites, power, water and risk
    • Alerts on new projects, filings and hearings
    • Reports as web page, PDF and CSV
    • 3 seats · cancel any time
    Data APIFrom $999 a month
    • County, power, risk and project data as JSON
    • Keys for your own tools and models
    Public bodies$4,680 a year
    • Counties, cities, utilities and co-ops
    • Paid by invoice

    What stays open? The map, the county or city pages and every data center page stay open to everyone.

    Sources and updates

    How this page was made: CamsAhead writes each page type once, then fills it with this place's data from the sources below.

    • OpenStreetMap contributors: data center buildings, as of November 6, 2026; Open Database License (ODbL) 1.0, free copy on request.
    • Epoch AI: "AI data centers", CC BY 4.0, retrieved November 7, 2026; changes noted.
    • U.S. Energy Information Administration (EIA): Form EIA-861 (released Oct 2026) and Form EIA-861 2025 detailed data (released Oct 2026): business power prices and sales by state, grid operators and utilities by county; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Forms EIA-923/906/920 (released Sep 2026): power generated by source, 2025; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Form EIA-860 (released Sep 2026): power plants proposed for 2026 to 2030; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Form EIA-860 (released Sep 2026): power plant capacity by state, 2025; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): thermoelectric cooling water data 2024, Forms EIA-860 and EIA-923 (retrieved Oct 2026): power plant cooling water by state.
    • FEMA: National Risk Index v1.20 (December 2025), NRI_Table_Counties and NRI_Table_States: natural hazard ratings by county and expected annual loss by state; retrieved October 31, 2026. This product uses the Federal Emergency Management Agency's OpenFEMA API, but is not endorsed by FEMA. The Federal Government or FEMA cannot vouch for the data or analyses derived from these data after the data have been retrieved from the Agency's website(s).
    • U.S. Census Bureau: US Census Bureau, Vintage 2025 county population estimates (co-est2025-alldata.csv): people by county.

    How CamsAhead counts cameras · Report a problem · Report a camera

    Add CamsAhead to your Home Screen Open in Safari to install Drive works best from your Home Screen Open in Safari to add it to your Home Screen

    It opens straight to the map.

    This app’s built-in browser can’t add CamsAhead to your Home Screen.

    From your Home Screen, CamsAhead opens full screen with one tap. It keeps the screen on while you drive, where your phone allows it.

    1. Tap Share
      In Safari’s toolbar, or in its ⋯ menu.
    2. Tap Share
      In your browser’s address bar or menu.
    3. Open this page in Safari
      Look for “Open in Safari” or “Open in browser” in this app’s menu, or copy the link.
    4. Copy the link, then paste it in Safari
      Or type CamsAhead.com in Safari.
    5. In Safari, tap Share, then Add to Home Screen
    6. Tap Add to Home Screen
      Scroll down the list if you don’t see it.
    7. Open the ⋮ menu
      Then tap “Add to Home screen” or “Install app”.
    8. Tap Add, then open CamsAhead from your Home Screen. Tap Install, then open CamsAhead from your Home Screen.

    Don’t see Add to Home Screen? Open this page in Safari.

    Or tap Share in this browser, then Add to Home Screen.

    Alerts work while CamsAhead is open on screen, from the Home Screen or the browser. If the screen locks or you switch apps, they stop.

    DriveBetaReport a problem