CamsAhead

Near me

Near me

Nevada Data Center Intelligence

Mapped Nevada data center sites, with their power, water and risk

One app for every Nevada county: data center sites, power, grid and FEMA risk, with hearing alerts and an API. 38 data center buildings are mapped in 3 of its 17 counties, and businesses pay 9.21¢ per kWh for power, 31% below the US average.

$390 a month3 seats · cancel any time

Where are Nevada's data centers?

38 mapped buildings sit in 3 of Nevada's 17 counties. Clark County has the most: 22.

Clark 22Washoe 11Storey 5

    © OpenStreetMap contributors

    Which risks do the counties with data centers face?

    Inland flooding is the most common risk: 2 of the 3 counties with mapped data centers rate high for it.

    Bars: counties with mapped data centers that rate Relatively high or Very high . Tap one to show it on the map.

    All 17 counties as a table

    What will a Nevada site pay for power, and how fast is demand growing?

    Business power in Nevada costs 9.21¢ per kWh, 31% below the US, and demand grew 22.1% since 2019.

    What do businesses pay for power?

    9.21¢ per kWh in 2025, 31% below the US average of 13.37¢.

    • Businesses5th cheapest of 51
      Nevada
      9.21¢
      US
      13.37¢

    How fast is business power demand growing?

    Business power use in Nevada grew 22.1% since 2019, more than twice the US rate (+10.5%).

    0%+10%+20%Nevada+22.1%US+10.5%2019’20’21’22’23’242025

    What makes Nevada's power?

    45.2 TWh generated in 2025: natural gas 51%, solar 31%, geothermal 8%.

    • Natural gas51%
    • Solar31%
    • Geothermal8.3%
    • Coal5.7%
    • Hydro4.2%

    Under 1% each: wind, other biomass, petroleum. Other (EIA's catch-all) used more power than it made, so it is left out.

    How much new power is proposed?

    7,065 MW of new plants are proposed for 2026–2030, 40% of today's 17,486 MW: solar 53%, other 47%.

    • Solar3,726 MW
    • Other (EIA's catch-all)3,320 MW
    • Geothermal20 MW

    Which grid would a Nevada site join, and what are its water and hazard risks?

    No ISO/RTO covers Nevada's power sales; heat waves and wildfires cost it most.

    Which grid serves Nevada?

    Nevada has no ISO/RTO : utilities balance their own areas for all of its retail sales.

    • No ISO/RTOAll

    Share of 2025 retail sales, by each utility's balancing authority .

    How much water do Nevada's power plants use?

    Nevada's power plants took in 19.6 billion gallons of water in 2024 to cool and returned about 91%; 1.6 billion gallons were used up .

    Returned 91.8%Used up 8.2%

    Which hazards cost Nevada most?

    Heat waves and wildfires are Nevada's biggest risks: each rates relatively high against other states .

    • Heat waveRelatively high
    • WildfireRelatively high
    • EarthquakeRelatively moderate
    • Inland floodingRelatively low
    • DroughtRelatively low
    • TornadoVery low

    Which AI campuses are in Nevada?

    Nevada has 1 AI campus on the list; none of them is listed as being built.

    AI campuses in Nevada: Google Storey County.

    Campuses without a county on record: Google Storey County. They are left off the county map.

    Who uses it, and what do they see first?

    Lawyers, brokers, site teams, utilities, insurers and investors each start from their own view of Nevada's 17 counties.

    Land-use and energy lawyers

    Follow counties with data centers, their hearings and FEMA risk.

    • Clark County22 mapped · risk very high
    • Washoe County11 mapped · risk relatively high
    • Storey County5 mapped · risk very low
    3counties with data centers to follow, each with its planning and zoning agendas

    Land and industrial brokers

    Rank counties by mapped data center buildings, with the power price behind them.

    • Clark County22
    • Washoe County11
    • Storey County5
    22mapped buildings in Clark County, the most in Nevada

    Site selection teams

    Shortlist counties by mapped sites, power and risk on one map.

    3of 17 counties have mapped data centers

    Utilities and power buyers

    Follow prices, demand and the grid behind each site. Bars: business power sales since 2019.

    • Nevada+22.1%
    • US+10.5%
    +22.1%business power sales since 2019, US +10.5%

    Insurers and lenders

    Bars: how many of the counties with data centers rate high for each hazard.

    • Inland flooding2 of 3
    • Wildfire2 of 3
    • Heat wave1 of 3
    • Drought0 of 3
    2of 3 counties with mapped data centers rate high for at least one

    Investors and analysts

    See which new power plants are proposed, by source and size. Bars: MW proposed.

    • Solar3,726
    • Other3,320
    • Geothermal20
    7,065MW of new plants proposed for 2026–2030

    What's inside Nevada Data Center Intelligence?

    One app for all 17 Nevada counties, plus hearing alerts and an API. Every screen below is filled with Nevada's real data.

    The Intelligence app

    Every county's sites, power, water and risk on one screen, with your watchlist.

    app.camsahead.com/intelligence/nevada
    OverviewMapSitesAI campusesProjectsPowerWaterRiskHearingsAlertsAPI
    38mapped buildings
    1AI campus
    9.21¢business power, per kWh
    +4.7%business demand, last 12 months
    WatchlistMappedFloodHeatDrought
    Clark County22Very highVery highVery low
    Washoe County11highlowlow
    Storey County5Very lowVery lowVery low

    Hearings and filings

    Follow counties and cases; get the agenda and the record when a hearing is posted.

    Hearings · Nevada
    Nevada · counties you follow Planning, zoning and utility agendas
    • Clark County22 mapped data center buildingsAgenda alerts
    • Washoe County11 mapped data center buildingsAgenda alerts
    • Storey County5 mapped data center buildingsAgenda alerts

    Alerts

    New projects, stage changes, hearings and data updates for what you follow, by email or in the app.

    Alerts · Nevada
    • Power demandBusiness power sales +4.7% on the year before: 14.9 TWhEIA-861M, 2025-09 to 2026-08
    • Site riskClark County (22 mapped buildings) rates Very high for inland floodingFEMA National Risk Index
    • New supply7,065 MW of new plants proposed for 2026–2030EIA-860

    Data API

    County, power, risk and project data as JSON for your own tools.

    api.camsahead.com
    GET /v1/counties/32003
    {
      "fips": "32003",
      "name": "Clark County",
      "state": "NV",
      "pop2025": 2407226,
      "pop_change_2020_pct": 6.2,
      "density_per_sqmi": 305,
      "nri": {
        "risk_rating": "Very High",
        "ifld": {
          "rating": "Very High",
          "score": 99.6
    Show the full response
        },
        "hwav": {
          "rating": "Very High",
          "score": 99.9
        },
        "drgt": {
          "rating": "Very Low",
          "score": 16.7
        }
      },
      "grid": {
        "rtos": [],
        "utilities_n": 8
      },
      "state_power": {
        "commercial_cents_kwh": 9.21,
        "us_commercial_cents_kwh": 13.37,
        "as_of": "2025"
      }
    }

    What does it cost?

    Nevada Data Center Intelligence is $390 a month for 3 seats.

    Nevada Data Center Intelligence$390 a month
    • The Intelligence app: every county's sites, power, water and risk
    • Alerts on new projects, filings and hearings
    • Reports as web page, PDF and CSV
    • 3 seats · cancel any time
    Data APIFrom $999 a month
    • County, power, risk and project data as JSON
    • Keys for your own tools and models
    Public bodies$4,680 a year
    • Counties, cities, utilities and co-ops
    • Paid by invoice

    What stays open? The map, the county pages and every data center page stay open to everyone.

    Sources and updates

    How this page was made: CamsAhead writes each page type once, then fills it with this place's data from the sources below.

    • OpenStreetMap contributors: data center buildings, as of November 6, 2026; Open Database License (ODbL) 1.0, free copy on request.
    • Epoch AI: "AI data centers", CC BY 4.0, retrieved November 7, 2026; changes noted.
    • U.S. Energy Information Administration (EIA): Form EIA-861 (released Oct 2026) and Form EIA-861 2025 detailed data (released Oct 2026): business power prices and sales by state, grid operators and utilities by county; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Forms EIA-923/906/920 (released Sep 2026): power generated by source, 2025; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Form EIA-860 (released Sep 2026): power plants proposed for 2026 to 2030; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Form EIA-860 (released Sep 2026): power plant capacity by state, 2025; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): thermoelectric cooling water data 2024, Forms EIA-860 and EIA-923 (retrieved Oct 2026): power plant cooling water by state.
    • FEMA: National Risk Index v1.20 (December 2025), NRI_Table_Counties and NRI_Table_States: natural hazard ratings by county and expected annual loss by state; retrieved October 31, 2026. This product uses the Federal Emergency Management Agency's OpenFEMA API, but is not endorsed by FEMA. The Federal Government or FEMA cannot vouch for the data or analyses derived from these data after the data have been retrieved from the Agency's website(s).
    • U.S. Census Bureau: US Census Bureau, Vintage 2025 county population estimates (co-est2025-alldata.csv): people by county.

    How CamsAhead counts cameras · Report a problem · Report a camera

    Add CamsAhead to your Home Screen Open in Safari to install Drive works best from your Home Screen Open in Safari to add it to your Home Screen

    It opens straight to the map.

    This app’s built-in browser can’t add CamsAhead to your Home Screen.

    From your Home Screen, CamsAhead opens full screen with one tap. It keeps the screen on while you drive, where your phone allows it.

    1. Tap Share
      In Safari’s toolbar, or in its ⋯ menu.
    2. Tap Share
      In your browser’s address bar or menu.
    3. Open this page in Safari
      Look for “Open in Safari” or “Open in browser” in this app’s menu, or copy the link.
    4. Copy the link, then paste it in Safari
      Or type CamsAhead.com in Safari.
    5. In Safari, tap Share, then Add to Home Screen
    6. Tap Add to Home Screen
      Scroll down the list if you don’t see it.
    7. Open the ⋮ menu
      Then tap “Add to Home screen” or “Install app”.
    8. Tap Add, then open CamsAhead from your Home Screen. Tap Install, then open CamsAhead from your Home Screen.

    Don’t see Add to Home Screen? Open this page in Safari.

    Or tap Share in this browser, then Add to Home Screen.

    Alerts work while CamsAhead is open on screen, from the Home Screen or the browser. If the screen locks or you switch apps, they stop.

    DriveBetaReport a problem