New Jersey Data Center Intelligence

Mapped New Jersey data center sites, with their power, water and risk

One app for every New Jersey county: data center sites, power, grid and FEMA risk, with hearing alerts and an API. 58 data center buildings are mapped in 11 of its 21 counties, and businesses pay 16.53¢ per kWh for power, 24% above the US average.

$390 a month3 seats · cancel any time

Where are New Jersey's data centers?

58 mapped buildings sit in 11 of New Jersey's 21 counties. Hudson County has the most: 15.

Hudson 15Somerset 13Middlesex 12Monmouth 5Passaic 5

    © OpenStreetMap contributors

    Which risks do the counties with data centers face?

    Inland flooding is the most common risk: 9 of the 11 counties with mapped data centers rate high for it.

    Bars: counties with mapped data centers that rate Relatively high or Very high . Tap one to show it on the map.

    All 21 counties as a table

    What will a New Jersey site pay for power, and how fast is demand growing?

    Business power in New Jersey costs 16.53¢ per kWh, 24% above the US, and demand fell 2.6% since 2019.

    What do businesses pay for power?

    16.53¢ per kWh in 2025, 24% above the US average of 13.37¢.

    • Businesses12th most expensive of 51
      New Jersey
      16.53¢
      US
      13.37¢

    How fast is business power demand growing?

    Business power use in New Jersey fell 2.6% since 2019, while the US grew 10.5%.

    0%+10%New Jersey−2.6%US+10.5%2019’20’21’22’23’242025

    What makes New Jersey's power?

    61.0 TWh generated in 2025: natural gas 49%, nuclear 46%, solar 3%.

    • Natural gas49%
    • Nuclear46%
    • Solar2.6%
    • Other (EIA's catch-all)1.0%
    • Other biomass1.0%

    Under 1% each: other gases, petroleum, wind, hydro. Pumped storage used more power than it made, so it is left out.

    How much new power is proposed?

    107 MW of new plants are proposed for 2026–2030, 1% of today's 16,669 MW: solar 79%, other 21%.

    • Solar84 MW
    • Other (EIA's catch-all)23 MW

    Which grid would a New Jersey site join, and what are its water and hazard risks?

    PJM serves 99.4% of New Jersey's power sales; coastal flooding costs it most.

    Which grid serves New Jersey?

    PJM serves 99.4% of New Jersey's retail power sales.

    • PJM99.4%
    • NYISO0.6%

    Share of 2025 retail sales, by each utility's balancing authority .

    How much water do New Jersey's power plants use?

    New Jersey's power plants took in 970 billion gallons of water in 2024 to cool and returned more than 99%; 8.4 billion gallons were used up .

    Returned 99.1%Used up 0.9%

    Which hazards cost New Jersey most?

    Coastal flooding is New Jersey's biggest risk (very high) ; the rest rate relatively high or lower.

    • Coastal floodingVery high
    • Inland floodingRelatively high
    • Heat waveRelatively moderate
    • HurricaneRelatively moderate
    • TornadoRelatively moderate
    • WildfireRelatively low
    • DroughtRelatively low
    • EarthquakeRelatively low

    Which AI campuses are in New Jersey?

    New Jersey has 1 AI campus on the list; none of them is listed as being built.

    AI campuses in New Jersey: Microsoft-Nebius New Jersey.

    Who uses it, and what do they see first?

    Lawyers, brokers, site teams, utilities, insurers and investors each start from their own view of New Jersey's 21 counties.

    Land-use and energy lawyers

    Follow counties with data centers, their hearings and FEMA risk.

    • Hudson County15 mapped · risk relatively high
    • Somerset County13 mapped · risk relatively moderate
    • Middlesex County12 mapped · risk relatively high
    11counties with data centers to follow, each with its planning and zoning agendas

    Land and industrial brokers

    Rank counties by mapped data center buildings, with the power price behind them.

    • Hudson County15
    • Somerset County13
    • Middlesex County12
    • Monmouth County5
    • Passaic County5
    15mapped buildings in Hudson County, the most in New Jersey

    Site selection teams

    Shortlist counties by mapped sites, power and risk on one map.

    11of 21 counties have mapped data centers

    Utilities and power buyers

    Follow prices, demand and the grid behind each site. Bars: business power sales since 2019.

    • New Jersey−2.6%
    • US+10.5%
    −2.6%business power sales since 2019, US +10.5%

    Insurers and lenders

    Bars: how many of the counties with data centers rate high for each hazard.

    • Inland flooding9 of 11
    • Heat wave4 of 11
    • Tornado4 of 11
    • Hurricane1 of 11
    9of 11 counties with mapped data centers rate high for at least one

    Investors and analysts

    See which new power plants are proposed, by source and size. Bars: MW proposed.

    • Solar84
    • Other23
    107MW of new plants proposed for 2026–2030

    What's inside New Jersey Data Center Intelligence?

    One app for all 21 New Jersey counties, plus hearing alerts and an API. Every screen below is filled with New Jersey's real data.

    The Intelligence app

    Every county's sites, power, water and risk on one screen, with your watchlist.

    app.camsahead.com/intelligence/new-jersey
    OverviewMapSitesAI campusesProjectsPowerWaterRiskHearingsAlertsAPI
    58mapped buildings
    1AI campus
    16.53¢business power, per kWh
    −0.2%business demand, last 12 months
    WatchlistMappedFloodHeatDrought
    Hudson County15highhighVery low
    Somerset County13highmoderatelow
    Middlesex County12highmoderatemoderate
    Monmouth County5highhighmoderate
    Passaic County5highmoderatelow

    Hearings and filings

    Follow counties and cases; get the agenda and the record when a hearing is posted.

    Hearings · New Jersey
    New Jersey · counties you follow Planning, zoning and utility agendas
    • Hudson County15 mapped data center buildingsAgenda alerts
    • Somerset County13 mapped data center buildingsAgenda alerts
    • Middlesex County12 mapped data center buildingsAgenda alerts
    • Monmouth County5 mapped data center buildingsAgenda alerts

    Alerts

    New projects, stage changes, hearings and data updates for what you follow, by email or in the app.

    Alerts · New Jersey
    • Power demandBusiness power sales −0.2% on the year before: 37.1 TWhEIA-861M, 2025-09 to 2026-08
    • Site riskHudson County (15 mapped buildings) rates Relatively high for inland floodingFEMA National Risk Index
    • New supply107 MW of new plants proposed for 2026–2030EIA-860

    Data API

    County, power, risk and project data as JSON for your own tools.

    api.camsahead.com
    GET /v1/counties/34017
    {
      "fips": "34017",
      "name": "Hudson County",
      "state": "NJ",
      "pop2025": 735033,
      "pop_change_2020_pct": 1.4,
      "density_per_sqmi": 15912.2,
      "nri": {
        "risk_rating": "Relatively High",
        "ifld": {
          "rating": "Relatively High",
          "score": 98.6
    Show the full response
        },
        "hwav": {
          "rating": "Relatively High",
          "score": 98.8
        },
        "drgt": {
          "rating": "Very Low",
          "score": 25.7
        }
      },
      "grid": {
        "rtos": [
          "PJM"
        ],
        "utilities_n": 1
      },
      "state_power": {
        "commercial_cents_kwh": 16.53,
        "us_commercial_cents_kwh": 13.37,
        "as_of": "2025"
      }
    }

    What does it cost?

    New Jersey Data Center Intelligence is $390 a month for 3 seats.

    New Jersey Data Center Intelligence$390 a month
    • The Intelligence app: every county's sites, power, water and risk
    • Alerts on new projects, filings and hearings
    • Reports as web page, PDF and CSV
    • 3 seats · cancel any time
    Data APIFrom $999 a month
    • County, power, risk and project data as JSON
    • Keys for your own tools and models
    Public bodies$4,680 a year
    • Counties, cities, utilities and co-ops
    • Paid by invoice

    What stays open? The map, the county pages and every data center page stay open to everyone.

    Sources and updates

    How this page was made: CamsAhead writes each page type once, then fills it with this place's data from the sources below.

    • OpenStreetMap contributors: data center buildings, as of November 6, 2026; Open Database License (ODbL) 1.0, free copy on request.
    • Epoch AI: "AI data centers", CC BY 4.0, retrieved November 7, 2026; changes noted.
    • U.S. Energy Information Administration (EIA): Form EIA-861 (released Oct 2026) and Form EIA-861 2025 detailed data (released Oct 2026): business power prices and sales by state, grid operators and utilities by county; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Forms EIA-923/906/920 (released Sep 2026): power generated by source, 2025; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Form EIA-860 (released Sep 2026): power plants proposed for 2026 to 2030; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Form EIA-860 (released Sep 2026): power plant capacity by state, 2025; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): thermoelectric cooling water data 2024, Forms EIA-860 and EIA-923 (retrieved Oct 2026): power plant cooling water by state.
    • FEMA: National Risk Index v1.20 (December 2025), NRI_Table_Counties and NRI_Table_States: natural hazard ratings by county and expected annual loss by state; retrieved October 31, 2026. This product uses the Federal Emergency Management Agency's OpenFEMA API, but is not endorsed by FEMA. The Federal Government or FEMA cannot vouch for the data or analyses derived from these data after the data have been retrieved from the Agency's website(s).
    • U.S. Census Bureau: US Census Bureau, Vintage 2025 county population estimates (co-est2025-alldata.csv): people by county.

    How CamsAhead counts cameras · Report a problem · Report a camera

    Add CamsAhead to your Home Screen Open in Safari to install Drive works best from your Home Screen Open in Safari to add it to your Home Screen

    It opens straight to the map.

    This app’s built-in browser can’t add CamsAhead to your Home Screen.

    From your Home Screen, CamsAhead opens full screen with one tap. It keeps the screen on while you drive, where your phone allows it.

    1. Tap Share
      In Safari’s toolbar, or in its ⋯ menu.
    2. Tap Share
      In your browser’s address bar or menu.
    3. Open this page in Safari
      Look for “Open in Safari” or “Open in browser” in this app’s menu, or copy the link.
    4. Copy the link, then paste it in Safari
      Or type CamsAhead.com in Safari.
    5. In Safari, tap Share, then Add to Home Screen
    6. Tap Add to Home Screen
      Scroll down the list if you don’t see it.
    7. Open the ⋮ menu
      Then tap “Add to Home screen” or “Install app”.
    8. Tap Add, then open CamsAhead from your Home Screen. Tap Install, then open CamsAhead from your Home Screen.

    Don’t see Add to Home Screen? Open this page in Safari.

    Or tap Share in this browser, then Add to Home Screen.

    Alerts work while CamsAhead is open on screen, from the Home Screen or the browser. If the screen locks or you switch apps, they stop.

    DriveBetaReport a problem