North Carolina Data Center Intelligence

Mapped North Carolina data center sites, with their power, water and risk

One app for every North Carolina county: data center sites, power, grid and FEMA risk, with hearing alerts and an API. 26 data center buildings are mapped in 9 of its 100 counties, and businesses pay 10.22¢ per kWh for power, 24% below the US average.

$390 a month3 seats · cancel any time

Where are North Carolina's data centers?

26 mapped buildings sit in 9 of North Carolina's 100 counties. Durham County has the most: 5.

Durham 5Mecklenburg 5Rutherford 4Wake 4Catawba 3

    © OpenStreetMap contributors

    Which risks do the counties with data centers face?

    Tornadoes are the most common risk: 4 of the 9 counties with mapped data centers rate high for them.

    Bars: counties with mapped data centers that rate Relatively high or Very high . Tap one to show it on the map.

    All 100 counties as a table

    What will a North Carolina site pay for power, and how fast is demand growing?

    Business power in North Carolina costs 10.22¢ per kWh, 24% below the US, and demand grew 2.1% since 2019.

    What do businesses pay for power?

    10.22¢ per kWh in 2025, 24% below the US average of 13.37¢.

    • Businesses11th cheapest of 51
      North Carolina
      10.22¢
      US
      13.37¢

    How fast is business power demand growing?

    Business power use in North Carolina grew 2.1% since 2019, slower than the US (+10.5%).

    0%+10%North Carolina+2.1%US+10.5%2019’20’21’22’23’242025

    What makes North Carolina's power?

    134.7 TWh generated in 2025: natural gas 41%, nuclear 32%, coal 13%.

    • Natural gas41%
    • Nuclear32%
    • Coal13%
    • Solar8.9%
    • Hydro3.1%

    Under 1% each: wood, wind, other biomass, petroleum, other (eia's catch-all).

    How much new power is proposed?

    2,244 MW of new plants are proposed for 2026–2030, 6% of today's 36,717 MW: solar 78%, other 22%.

    • Solar1,750 MW
    • Other (EIA's catch-all)494 MW

    Which grid would a North Carolina site join, and what are its water and hazard risks?

    No ISO/RTO covers 96.1% of North Carolina's power sales; inland flooding, hurricanes and tornadoes cost it most.

    Which grid serves North Carolina?

    Most of North Carolina has no ISO/RTO : utilities balance their own areas for 96.1% of retail sales.

    • PJM3.9%
    • No ISO/RTO96.1%

    Share of 2025 retail sales, by each utility's balancing authority .

    How much water do North Carolina's power plants use?

    North Carolina's power plants took in 2,808 billion gallons of water in 2024 to cool and returned more than 99%; 16.2 billion gallons were used up .

    Returned 99.4%Used up 0.6%

    Which hazards cost North Carolina most?

    Inland flooding, hurricanes and tornadoes are North Carolina's biggest risks: each rates relatively high against other states .

    • Inland floodingRelatively high
    • HurricaneRelatively high
    • TornadoRelatively high
    • Coastal floodingRelatively moderate
    • Heat waveRelatively moderate
    • DroughtRelatively moderate
    • WildfireRelatively low
    • EarthquakeRelatively low

    Which AI campuses are in North Carolina?

    North Carolina has 1 AI campus on the list; none of them is listed as being built.

    AI campuses in North Carolina: CoreWeave Marble NC.

    Who uses it, and what do they see first?

    Lawyers, brokers, site teams, utilities, insurers and investors each start from their own view of North Carolina's 100 counties.

    Land-use and energy lawyers

    Follow counties with data centers, their hearings and FEMA risk.

    • Durham County5 mapped · risk relatively moderate
    • Mecklenburg County5 mapped · risk relatively high
    • Rutherford County4 mapped · risk relatively low
    9counties with data centers to follow, each with its planning and zoning agendas

    Land and industrial brokers

    Rank counties by mapped data center buildings, with the power price behind them.

    • Durham County5
    • Mecklenburg County5
    • Rutherford County4
    • Wake County4
    • Catawba County3
    5mapped buildings in Durham County, the most in North Carolina

    Site selection teams

    Shortlist counties by mapped sites, power and risk on one map.

    9of 100 counties have mapped data centers

    Utilities and power buyers

    Follow prices, demand and the grid behind each site. Bars: business power sales since 2019.

    • North Carolina+2.1%
    • US+10.5%
    +2.1%business power sales since 2019, US +10.5%

    Insurers and lenders

    Bars: how many of the counties with data centers rate high for each hazard.

    • Tornado4 of 9
    • Inland flooding2 of 9
    • Heat wave1 of 9
    • Drought0 of 9
    4of 9 counties with mapped data centers rate high for at least one

    Investors and analysts

    See which new power plants are proposed, by source and size. Bars: MW proposed.

    • Solar1,750
    • Other494
    2,244MW of new plants proposed for 2026–2030

    What's inside North Carolina Data Center Intelligence?

    One app for all 100 North Carolina counties, plus hearing alerts and an API. Every screen below is filled with North Carolina's real data.

    The Intelligence app

    Every county's sites, power, water and risk on one screen, with your watchlist.

    app.camsahead.com/intelligence/north-carolina
    OverviewMapSitesAI campusesProjectsPowerWaterRiskHearingsAlertsAPI
    26mapped buildings
    1AI campus
    10.22¢business power, per kWh
    +1.8%business demand, last 12 months
    WatchlistMappedFloodHeatDrought
    Durham County5moderatemoderatelow
    Mecklenburg County5highmoderateVery low
    Rutherford County4moderateVery lowlow
    Wake County4highhighlow
    Catawba County3moderatelowlow

    Hearings and filings

    Follow counties and cases; get the agenda and the record when a hearing is posted.

    Hearings · North Carolina
    North Carolina · counties you follow Planning, zoning and utility agendas
    • Durham County5 mapped data center buildingsAgenda alerts
    • Mecklenburg County5 mapped data center buildingsAgenda alerts
    • Rutherford County4 mapped data center buildingsAgenda alerts
    • Wake County4 mapped data center buildingsAgenda alerts

    Alerts

    New projects, stage changes, hearings and data updates for what you follow, by email or in the app.

    Alerts · North Carolina
    • Power demandBusiness power sales +1.8% on the year before: 51.0 TWhEIA-861M, 2025-09 to 2026-08
    • Site riskMecklenburg County (5 mapped buildings) rates Relatively high for inland floodingFEMA National Risk Index
    • New supply2,244 MW of new plants proposed for 2026–2030EIA-860

    Data API

    County, power, risk and project data as JSON for your own tools.

    api.camsahead.com
    GET /v1/counties/37063
    {
      "fips": "37063",
      "name": "Durham County",
      "state": "NC",
      "pop2025": 347240,
      "pop_change_2020_pct": 6.9,
      "density_per_sqmi": 1207.6,
      "nri": {
        "risk_rating": "Relatively Moderate",
        "ifld": {
          "rating": "Relatively Moderate",
          "score": 92.4
    Show the full response
        },
        "hwav": {
          "rating": "Relatively Moderate",
          "score": 94
        },
        "drgt": {
          "rating": "Relatively Low",
          "score": 42.8
        }
      },
      "grid": {
        "rtos": [],
        "utilities_n": 4
      },
      "state_power": {
        "commercial_cents_kwh": 10.22,
        "us_commercial_cents_kwh": 13.37,
        "as_of": "2025"
      }
    }

    What does it cost?

    North Carolina Data Center Intelligence is $390 a month for 3 seats.

    North Carolina Data Center Intelligence$390 a month
    • The Intelligence app: every county's sites, power, water and risk
    • Alerts on new projects, filings and hearings
    • Reports as web page, PDF and CSV
    • 3 seats · cancel any time
    Data APIFrom $999 a month
    • County, power, risk and project data as JSON
    • Keys for your own tools and models
    Public bodies$4,680 a year
    • Counties, cities, utilities and co-ops
    • Paid by invoice

    What stays open? The map, the county pages and every data center page stay open to everyone.

    Sources and updates

    How this page was made: CamsAhead writes each page type once, then fills it with this place's data from the sources below.

    • OpenStreetMap contributors: data center buildings, as of November 6, 2026; Open Database License (ODbL) 1.0, free copy on request.
    • Epoch AI: "AI data centers", CC BY 4.0, retrieved November 7, 2026; changes noted.
    • U.S. Energy Information Administration (EIA): Form EIA-861 (released Oct 2026) and Form EIA-861 2025 detailed data (released Oct 2026): business power prices and sales by state, grid operators and utilities by county; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Forms EIA-923/906/920 (released Sep 2026): power generated by source, 2025; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Form EIA-860 (released Sep 2026): power plants proposed for 2026 to 2030; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Form EIA-860 (released Sep 2026): power plant capacity by state, 2025; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): thermoelectric cooling water data 2024, Forms EIA-860 and EIA-923 (retrieved Oct 2026): power plant cooling water by state.
    • FEMA: National Risk Index v1.20 (December 2025), NRI_Table_Counties and NRI_Table_States: natural hazard ratings by county and expected annual loss by state; retrieved October 31, 2026. This product uses the Federal Emergency Management Agency's OpenFEMA API, but is not endorsed by FEMA. The Federal Government or FEMA cannot vouch for the data or analyses derived from these data after the data have been retrieved from the Agency's website(s).
    • U.S. Census Bureau: US Census Bureau, Vintage 2025 county population estimates (co-est2025-alldata.csv): people by county.

    How CamsAhead counts cameras · Report a problem · Report a camera

    Add CamsAhead to your Home Screen Open in Safari to install Drive works best from your Home Screen Open in Safari to add it to your Home Screen

    It opens straight to the map.

    This app’s built-in browser can’t add CamsAhead to your Home Screen.

    From your Home Screen, CamsAhead opens full screen with one tap. It keeps the screen on while you drive, where your phone allows it.

    1. Tap Share
      In Safari’s toolbar, or in its ⋯ menu.
    2. Tap Share
      In your browser’s address bar or menu.
    3. Open this page in Safari
      Look for “Open in Safari” or “Open in browser” in this app’s menu, or copy the link.
    4. Copy the link, then paste it in Safari
      Or type CamsAhead.com in Safari.
    5. In Safari, tap Share, then Add to Home Screen
    6. Tap Add to Home Screen
      Scroll down the list if you don’t see it.
    7. Open the ⋮ menu
      Then tap “Add to Home screen” or “Install app”.
    8. Tap Add, then open CamsAhead from your Home Screen. Tap Install, then open CamsAhead from your Home Screen.

    Don’t see Add to Home Screen? Open this page in Safari.

    Or tap Share in this browser, then Add to Home Screen.

    Alerts work while CamsAhead is open on screen, from the Home Screen or the browser. If the screen locks or you switch apps, they stop.

    DriveBetaReport a problem