Oregon Data Center Intelligence

Mapped Oregon data center sites, with their power, water and risk

One app for every Oregon county: data center sites, power, grid and FEMA risk, with hearing alerts and an API. 126 data center buildings are mapped in 12 of its 36 counties, and businesses pay 9.80¢ per kWh for power, 27% below the US average.

$390 a month3 seats · cancel any time

Where are Oregon's data centers?

126 mapped buildings sit in 12 of Oregon's 36 counties. Umatilla County has the most: 34.

Umatilla 34Morrow 33Washington 32Crook 11Multnomah 4

    © OpenStreetMap contributors

    Which risks do the counties with data centers face?

    Inland flooding is the most common risk: 4 of the 12 counties with mapped data centers rate high for it.

    Bars: counties with mapped data centers that rate Relatively high or Very high . Tap one to show it on the map.

    All 36 counties as a table

    What will a Oregon site pay for power, and how fast is demand growing?

    Business power in Oregon costs 9.80¢ per kWh, 27% below the US, and demand grew 81.3% since 2019.

    What do businesses pay for power?

    9.80¢ per kWh in 2025, 27% below the US average of 13.37¢.

    • Businesses8th cheapest of 51
      Oregon
      9.80¢
      US
      13.37¢

    How fast is business power demand growing?

    Business power use in Oregon grew 81.3% since 2019, almost 8 times the US rate (+10.5%).

    0%+50%Oregon+81.3%US+10.5%2019’20’21’22’23’242025

    What makes Oregon's power?

    64.3 TWh generated in 2025: hydro 45%, natural gas 36%, wind 14%.

    • Hydro45%
    • Natural gas36%
    • Wind14%
    • Solar4.2%
    • Wood1.2%

    Under 1% each: other biomass, geothermal, petroleum. Other (EIA's catch-all) used more power than it made, so it is left out.

    How much new power is proposed?

    7,146 MW of new plants are proposed for 2026–2030, 39% of today's 18,320 MW: solar 55%, other 41%, wind 4%.

    • Solar3,904 MW
    • Other (EIA's catch-all)2,940 MW
    • Wind300 MW
    • Petroleum3 MW

    Which grid would a Oregon site join, and what are its water and hazard risks?

    No ISO/RTO covers Oregon's power sales; wildfires and earthquakes cost it most.

    Which grid serves Oregon?

    Oregon has no ISO/RTO : utilities balance their own areas for all of its retail sales.

    • No ISO/RTOAll

    Share of 2025 retail sales, by each utility's balancing authority .

    How much water do Oregon's power plants use?

    Oregon's power plants took in 5.0 billion gallons of water in 2024 to cool and returned about 20%; 4.0 billion gallons were used up .

    Returned 20.0%Used up 80.0%

    Which hazards cost Oregon most?

    Wildfires and earthquakes are Oregon's biggest risks: each rates relatively high against other states .

    • WildfireRelatively high
    • EarthquakeRelatively high
    • Inland floodingRelatively moderate
    • Coastal floodingRelatively moderate
    • Heat waveRelatively moderate
    • TornadoRelatively low
    • DroughtVery low

    Which AI campuses are in Oregon?

    Oregon has 2 AI campuses on the list; none of them is listed as being built.

    AI campuses in Oregon: Google The Dalles, Meta-QTS Hillsboro 2.

    Campuses without a county on record: Google The Dalles. They are left off the county map.

    Who uses it, and what do they see first?

    Lawyers, brokers, site teams, utilities, insurers and investors each start from their own view of Oregon's 36 counties.

    Land-use and energy lawyers

    Follow counties with data centers, their hearings and FEMA risk.

    • Umatilla County34 mapped · risk relatively moderate
    • Morrow County33 mapped · risk very low
    • Washington County32 mapped · risk relatively high
    12counties with data centers to follow, each with its planning and zoning agendas

    Land and industrial brokers

    Rank counties by mapped data center buildings, with the power price behind them.

    • Umatilla County34
    • Morrow County33
    • Washington County32
    • Crook County11
    • Multnomah County4
    34mapped buildings in Umatilla County, the most in Oregon

    Site selection teams

    Shortlist counties by mapped sites, power and risk on one map.

    12of 36 counties have mapped data centers

    Utilities and power buyers

    Follow prices, demand and the grid behind each site. Bars: business power sales since 2019.

    • Oregon+81.3%
    • US+10.5%
    +81.3%business power sales since 2019, US +10.5%

    Insurers and lenders

    Bars: how many of the counties with data centers rate high for each hazard.

    • Inland flooding4 of 12
    • Wildfire3 of 12
    • Heat wave2 of 12
    • Drought0 of 12
    7of 12 counties with mapped data centers rate high for at least one

    Investors and analysts

    See which new power plants are proposed, by source and size. Bars: MW proposed.

    • Solar3,904
    • Other2,940
    • Wind300
    • Petroleum3
    7,146MW of new plants proposed for 2026–2030

    What's inside Oregon Data Center Intelligence?

    One app for all 36 Oregon counties, plus hearing alerts and an API. Every screen below is filled with Oregon's real data.

    The Intelligence app

    Every county's sites, power, water and risk on one screen, with your watchlist.

    app.camsahead.com/intelligence/oregon
    OverviewMapSitesAI campusesProjectsPowerWaterRiskHearingsAlertsAPI
    126mapped buildings
    2AI campuses
    9.80¢business power, per kWh
    +0.1%business demand, last 12 months
    WatchlistMappedFloodHeatDrought
    Umatilla County34moderatemoderatemoderate
    Morrow County33lowlowVery low
    Washington County32highhighVery low
    Crook County11lowVery lowVery low
    Multnomah County4highhighVery low

    Hearings and filings

    Follow counties and cases; get the agenda and the record when a hearing is posted.

    Hearings · Oregon
    Oregon · counties you follow Planning, zoning and utility agendas
    • Umatilla County34 mapped data center buildingsAgenda alerts
    • Morrow County33 mapped data center buildingsAgenda alerts
    • Washington County32 mapped data center buildingsAgenda alerts
    • Crook County11 mapped data center buildingsAgenda alerts

    Alerts

    New projects, stage changes, hearings and data updates for what you follow, by email or in the app.

    Alerts · Oregon
    • Power demandBusiness power sales +0.1% on the year before: 28.2 TWhEIA-861M, 2025-09 to 2026-08
    • Site riskWashington County (32 mapped buildings) rates Relatively high for inland floodingFEMA National Risk Index
    • New supply7,146 MW of new plants proposed for 2026–2030EIA-860

    Data API

    County, power, risk and project data as JSON for your own tools.

    api.camsahead.com
    GET /v1/counties/41059
    {
      "fips": "41059",
      "name": "Umatilla County",
      "state": "OR",
      "pop2025": 81119,
      "pop_change_2020_pct": 1.3,
      "density_per_sqmi": 25.2,
      "nri": {
        "risk_rating": "Relatively Moderate",
        "ifld": {
          "rating": "Relatively Moderate",
          "score": 81.5
    Show the full response
        },
        "hwav": {
          "rating": "Relatively Moderate",
          "score": 86.6
        },
        "drgt": {
          "rating": "Relatively Moderate",
          "score": 82.8
        }
      },
      "grid": {
        "rtos": [],
        "utilities_n": 8
      },
      "state_power": {
        "commercial_cents_kwh": 9.8,
        "us_commercial_cents_kwh": 13.37,
        "as_of": "2025"
      }
    }

    What does it cost?

    Oregon Data Center Intelligence is $390 a month for 3 seats.

    Oregon Data Center Intelligence$390 a month
    • The Intelligence app: every county's sites, power, water and risk
    • Alerts on new projects, filings and hearings
    • Reports as web page, PDF and CSV
    • 3 seats · cancel any time
    Data APIFrom $999 a month
    • County, power, risk and project data as JSON
    • Keys for your own tools and models
    Public bodies$4,680 a year
    • Counties, cities, utilities and co-ops
    • Paid by invoice

    What stays open? The map, the county pages and every data center page stay open to everyone.

    Sources and updates

    How this page was made: CamsAhead writes each page type once, then fills it with this place's data from the sources below.

    • OpenStreetMap contributors: data center buildings, as of November 6, 2026; Open Database License (ODbL) 1.0, free copy on request.
    • Epoch AI: "AI data centers", CC BY 4.0, retrieved November 7, 2026; changes noted.
    • U.S. Energy Information Administration (EIA): Form EIA-861 (released Oct 2026) and Form EIA-861 2025 detailed data (released Oct 2026): business power prices and sales by state, grid operators and utilities by county; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Forms EIA-923/906/920 (released Sep 2026): power generated by source, 2025; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Form EIA-860 (released Sep 2026): power plants proposed for 2026 to 2030; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Form EIA-860 (released Sep 2026): power plant capacity by state, 2025; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): thermoelectric cooling water data 2024, Forms EIA-860 and EIA-923 (retrieved Oct 2026): power plant cooling water by state.
    • FEMA: National Risk Index v1.20 (December 2025), NRI_Table_Counties and NRI_Table_States: natural hazard ratings by county and expected annual loss by state; retrieved October 31, 2026. This product uses the Federal Emergency Management Agency's OpenFEMA API, but is not endorsed by FEMA. The Federal Government or FEMA cannot vouch for the data or analyses derived from these data after the data have been retrieved from the Agency's website(s).
    • U.S. Census Bureau: US Census Bureau, Vintage 2025 county population estimates (co-est2025-alldata.csv): people by county.

    How CamsAhead counts cameras · Report a problem · Report a camera

    Add CamsAhead to your Home Screen Open in Safari to install Drive works best from your Home Screen Open in Safari to add it to your Home Screen

    It opens straight to the map.

    This app’s built-in browser can’t add CamsAhead to your Home Screen.

    From your Home Screen, CamsAhead opens full screen with one tap. It keeps the screen on while you drive, where your phone allows it.

    1. Tap Share
      In Safari’s toolbar, or in its ⋯ menu.
    2. Tap Share
      In your browser’s address bar or menu.
    3. Open this page in Safari
      Look for “Open in Safari” or “Open in browser” in this app’s menu, or copy the link.
    4. Copy the link, then paste it in Safari
      Or type CamsAhead.com in Safari.
    5. In Safari, tap Share, then Add to Home Screen
    6. Tap Add to Home Screen
      Scroll down the list if you don’t see it.
    7. Open the ⋮ menu
      Then tap “Add to Home screen” or “Install app”.
    8. Tap Add, then open CamsAhead from your Home Screen. Tap Install, then open CamsAhead from your Home Screen.

    Don’t see Add to Home Screen? Open this page in Safari.

    Or tap Share in this browser, then Add to Home Screen.

    Alerts work while CamsAhead is open on screen, from the Home Screen or the browser. If the screen locks or you switch apps, they stop.

    DriveBetaReport a problem