CamsAhead

Near me

Near me

Virginia Data Center Intelligence

Mapped Virginia data center sites, with their power, water and risk

One app for every Virginia county or city: data center sites, power, grid and FEMA risk, with hearing alerts and an API. 381 data center buildings are mapped in 12 of its 133 counties and cities, and businesses pay 9.95¢ per kWh for power, 26% below the US average.

$390 a month3 seats · cancel any time

Where are Virginia's data centers?

381 mapped buildings sit in 12 of Virginia's 133 counties and cities. Loudoun County has the most: 231.

Loudoun 231Prince William 72Fairfax 34Mecklenburg 18Henrico 15

    © OpenStreetMap contributors

    Which risks do the counties and cities with data centers face?

    Drought is the most common risk: 1 of the 12 counties and cities with mapped data centers rate high for it.

    Bars: counties and cities with mapped data centers that rate Relatively high or Very high . Tap one to show it on the map.

    All 133 counties and cities as a table

    What will a Virginia site pay for power, and how fast is demand growing?

    Business power in Virginia costs 9.95¢ per kWh, 26% below the US, and demand grew 60.5% since 2019.

    What do businesses pay for power?

    9.95¢ per kWh in 2025, 26% below the US average of 13.37¢.

    • Businesses9th cheapest of 51
      Virginia
      9.95¢
      US
      13.37¢

    How fast is business power demand growing?

    Business power use in Virginia grew 60.5% since 2019, almost 6 times the US rate (+10.5%).

    0%+25%+50%Virginia+60.5%US+10.5%2019’20’21’22’23’242025

    What makes Virginia's power?

    106.4 TWh generated in 2025: natural gas 58%, nuclear 27%, solar 8%.

    • Natural gas58%
    • Nuclear27%
    • Solar8.3%
    • Coal3.4%
    • Wood2.5%
    • Hydro1.0%

    Under 1% each: other biomass, petroleum, other (eia's catch-all), wind. Pumped storage used more power than it made, so it is left out.

    How much new power is proposed?

    7,554 MW of new plants are proposed for 2026–2030, about a quarter of today's 29,581 MW: solar 47%, wind 36%, natural gas 12%, other 5%.

    • Solar3,559 MW
    • Wind2,718 MW
    • Natural gas936 MW
    • Other (EIA's catch-all)341 MW

    Which grid would a Virginia site join, and what are its water and hazard risks?

    PJM serves 99.2% of Virginia's power sales; drought costs it most.

    Which grid serves Virginia?

    PJM serves 99.2% of Virginia's retail power sales.

    • PJM99.2%
    • No ISO/RTO0.8%

    Share of 2025 retail sales, by each utility's balancing authority .

    How much water do Virginia's power plants use?

    Virginia's power plants took in 1,528 billion gallons of water in 2024 to cool and returned more than 99%; 3.7 billion gallons were used up .

    Returned 99.8%Used up 0.2%

    Which hazards cost Virginia most?

    Drought is Virginia's biggest risk (relatively high) ; the rest rate moderate or lower.

    • DroughtRelatively high
    • Inland floodingRelatively moderate
    • Coastal floodingRelatively moderate
    • Heat waveRelatively moderate
    • HurricaneRelatively moderate
    • TornadoRelatively moderate
    • WildfireRelatively low
    • EarthquakeRelatively low

    Which AI campuses are in Virginia?

    Virginia has 7 AI campuses on the list; none of them is listed as being built.

    AI campuses in Virginia: CoreWeave Chester VA, Google Arcola, Google Bristow, QTS Richmond 1, QTS Richmond 2, QTS Richmond 3, STACK Infrastructure NVA02.

    What's in Prince William County's project pipeline?

    37 project records : 9 rezonings filed, 18 approved, 7 under construction, and 3 approvals a court canceled. Active cases cover 2,329 acres as filed.

    What stage is each case at?

    One square per case.

    • Rezoning filed 9
    • Approved 18
    • Under construction 7
    • Canceled by a court 3

    When did the county first record each case?

    22 of 37 cases were first recorded in 2021–2023 .

    1
    2011
    ’12–17
    1
    ’18
    4
    ’19
    1
    ’20
    7
    ’21
    7
    ’22
    8
    ’23
    4
    ’24
    4
    ’25
    All 37 cases by stage
    • Rezoning filed
      • University Business Park (and substation) · REZ2023-00019 · 117 acres as filed
      • Gardner Property (and substation) · REZ2023-00018 · 83 acres as filed
      • Compton Property Rezoning (and substation) · REZ2021-00019 · 77 acres as filed
      • Gainesville East Data Center (and substation) · SUP2023-00006 · 59 acres as filed
      • Gainesville West Data Center (and substation) · SUP2023-00005 · 59 acres as filed
      • Bristow Campus · REZ2022-00030 · 58 acres as filed
      • Ashton Data Center (and substation) · REZ2022-00031 · 52 acres as filed
      • Potomac Technology Park (and substation) · REZ2022-00015 · 52 acres as filed
      • Innovation on the Parkway PRA · REZ2023-00001 · 18 acres as filed
    • Approved
      • Devlin Technology Park · REZ2022-00022 · 270 acres as filed
      • Hunter Property Rezoning · REZ2020-00022 · 196 acres as filed
      • Gainesville Tech Park · REZ2020-00011 · 136 acres as filed
      • I-66 & Route 29 Technology Park · REZ2021-00001 · 103 acres as filed
      • Airport Gateway Commerce Center I (amended) · PLN2011-00437 · 97 acres as filed
      • Parsons Business Park · REZ2023-00028 · 91 acres as filed
      • Wellington Glen Technology Park · REZ2024-00018 · 49 acres as filed
      • Village Place Technology Park · REZ2020-00024 · 48 acres as filed
      • Mid-County Industrial Park · REZ2024-00006 · 41 acres as filed
      • Westview 66 · REZ2019-00025 · 41 acres as filed
      • Wellington Glen Parcel K · REZ2021-00014 · 40 acres as filed
      • Manassas Point PRA · REZ2024-00001 · 40 acres as filed
      • KH Data Capital Development (IMVA-3 4 5) · REZ2021-00022 · 37 acres as filed
      • PRA and Release of Declaration, Hornbaker Road · REZ2019-00032 · 36 acres as filed
      • Blackburn Land Bay 5 · REZ2019-00022 · 28 acres as filed
      • South Point Phase II · REZ2020-00021 · 22 acres as filed
      • VA 8/9 Rezoning · REZ2024-00041 · 19 acres as filed
      • Stoneview · REZ2023-00026 · 12 acres as filed
    • Under construction
      • Youth for Tomorrow · REZ2019-00034 · 182 acres as filed
      • Ashwood Addition · REZ2018-00001 · 99 acres as filed
      • Avanti at Innovation Proffer Amendment & Rezoning · REZ2019-00028 · 88 acres as filed
      • NVA05C Rezoning · REZ2024-00042 · 24 acres as filed
      • Manassas Corporate Center MCC-7 · REZ2024-00025 · 23 acres as filed
      • DC-4 PRA · REZ2023-00002 · 20 acres as filed
      • QTS - Project Hero Expansion (DC6) · REZ2020-00019 · 13 acres as filed
    • Canceled by a court
      • Compass Datacenters Prince William County Campus 1 · REZ2022-00036 · 884 acres as filed
      • Digital Gateway North · REZ2022-00032 · 534 acres as filed
      • Digital Gateway South · REZ2022-00033 · 342 acres as filed

    Who uses it, and what do they see first?

    Lawyers, brokers, site teams, utilities, insurers and investors each start from their own view of Virginia's 133 counties and cities.

    Land-use and energy lawyers

    Follow rezoning cases and hearings, with each agenda and record as it posts.

    • University Business Park (and substation)REZ2023-00019 · 117 acres
    • Gardner Property (and substation)REZ2023-00018 · 83 acres
    • Compton Property Rezoning (and substation)REZ2021-00019 · 77 acres
    9rezoning cases filed in Prince William County, of 37 project records

    Land and industrial brokers

    Rank counties and cities by mapped data center buildings, with the power price behind them.

    • Loudoun County231
    • Prince William County72
    • Fairfax County34
    • Mecklenburg County18
    • Henrico County15
    231mapped buildings in Loudoun County, the most in Virginia

    Site selection teams

    Shortlist counties and cities by mapped sites, power and risk on one map.

    12of 133 counties and cities have mapped data centers

    Utilities and power buyers

    Follow prices, demand and the grid behind each site. Bars: business power sales since 2019.

    • Virginia+60.5%
    • US+10.5%
    +60.5%business power sales since 2019, US +10.5%

    Insurers and lenders

    Bars: how many of the counties and cities with data centers rate high for each hazard.

    • Drought1 of 12
    • Heat wave1 of 12
    • Inland flooding1 of 12
    • Hurricane0 of 12
    2of 12 counties and cities with mapped data centers rate high for at least one

    Investors and analysts

    See which new power plants are proposed, by source and size. Bars: MW proposed.

    • Solar3,559
    • Wind2,718
    • Natural gas936
    • Other341
    7,554MW of new plants proposed for 2026–2030

    What's inside Virginia Data Center Intelligence?

    One app for all 133 Virginia counties and cities, plus hearing alerts and an API. Every screen below is filled with Virginia's real data.

    The Intelligence app

    Every county or city's sites, power, water and risk on one screen, with your watchlist.

    app.camsahead.com/intelligence/virginia
    OverviewMapSitesAI campusesProjectsPowerWaterRiskHearingsAlertsAPI
    381mapped buildings
    7AI campuses
    9.95¢business power, per kWh
    +5.1%business demand, last 12 months
    WatchlistMappedFloodHeatDrought
    Loudoun County231moderatemoderatemoderate
    Prince William County72moderatemoderatelow
    Fairfax County34highhighlow
    Mecklenburg County18lowlowhigh
    Henrico County15moderatemoderatemoderate

    Hearings and filings

    Follow counties and cities and cases; get the agenda and the record when a hearing is posted.

    Hearings · Virginia
    Prince William County · rezoning cases you follow Planning Commission and Board agendas
    • University Business Park (and substation)REZ2023-00019 · Rezoning filed · 117 acres as filedHearing alerts
    • Gardner Property (and substation)REZ2023-00018 · Rezoning filed · 83 acres as filedHearing alerts
    • Compton Property Rezoning (and substation)REZ2021-00019 · Rezoning filed · 77 acres as filedHearing alerts
    • Gainesville East Data Center (and substation)SUP2023-00006 · Rezoning filed · 59 acres as filedHearing alerts

    Alerts

    New projects, stage changes, hearings and data updates for what you follow, by email or in the app.

    Alerts · Virginia
    • Power demandBusiness power sales +5.1% on the year before: 88.2 TWhEIA-861M, 2025-09 to 2026-08
    • Site riskFairfax County (34 mapped buildings) rates Relatively high for inland floodingFEMA National Risk Index
    • New supply7,554 MW of new plants proposed for 2026–2030EIA-860

    Data API

    County, power, risk and project data as JSON for your own tools.

    api.camsahead.com
    GET /v1/counties/51107
    {
      "fips": "51107",
      "name": "Loudoun County",
      "state": "VA",
      "pop2025": 449749,
      "pop_change_2020_pct": 6.8,
      "density_per_sqmi": 872,
      "nri": {
        "risk_rating": "Relatively Low",
        "ifld": {
          "rating": "Relatively Moderate",
          "score": 83.9
    Show the full response
        },
        "hwav": {
          "rating": "Relatively Moderate",
          "score": 91.1
        },
        "drgt": {
          "rating": "Relatively Moderate",
          "score": 74.1
        }
      },
      "grid": {
        "rtos": [
          "PJM"
        ],
        "utilities_n": 2
      },
      "state_power": {
        "commercial_cents_kwh": 9.95,
        "us_commercial_cents_kwh": 13.37,
        "as_of": "2025"
      }
    }

    What does it cost?

    Virginia Data Center Intelligence is $390 a month for 3 seats.

    Virginia Data Center Intelligence$390 a month
    • The Intelligence app: every county or city's sites, power, water and risk
    • Alerts on new projects, filings and hearings
    • Reports as web page, PDF and CSV
    • 3 seats · cancel any time
    Data APIFrom $999 a month
    • County, power, risk and project data as JSON
    • Keys for your own tools and models
    Public bodies$4,680 a year
    • Counties, cities, utilities and co-ops
    • Paid by invoice

    What stays open? The map, the county or city pages and every data center page stay open to everyone.

    Sources and updates

    How this page was made: CamsAhead writes each page type once, then fills it with this place's data from the sources below.

    • OpenStreetMap contributors: data center buildings, as of November 6, 2026; Open Database License (ODbL) 1.0, free copy on request.
    • Epoch AI: "AI data centers", CC BY 4.0, retrieved November 7, 2026; changes noted.
    • U.S. Energy Information Administration (EIA): Form EIA-861 (released Oct 2026) and Form EIA-861 2025 detailed data (released Oct 2026): business power prices and sales by state, grid operators and utilities by county; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Forms EIA-923/906/920 (released Sep 2026): power generated by source, 2025; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Form EIA-860 (released Sep 2026): power plants proposed for 2026 to 2030; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Form EIA-860 (released Sep 2026): power plant capacity by state, 2025; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): thermoelectric cooling water data 2024, Forms EIA-860 and EIA-923 (retrieved Oct 2026): power plant cooling water by state.
    • FEMA: National Risk Index v1.20 (December 2025), NRI_Table_Counties and NRI_Table_States: natural hazard ratings by county and expected annual loss by state; retrieved October 31, 2026. This product uses the Federal Emergency Management Agency's OpenFEMA API, but is not endorsed by FEMA. The Federal Government or FEMA cannot vouch for the data or analyses derived from these data after the data have been retrieved from the Agency's website(s).
    • U.S. Census Bureau: US Census Bureau, Vintage 2025 county population estimates (co-est2025-alldata.csv): people by county.

    How CamsAhead counts cameras · Report a problem · Report a camera

    Add CamsAhead to your Home Screen Open in Safari to install Drive works best from your Home Screen Open in Safari to add it to your Home Screen

    It opens straight to the map.

    This app’s built-in browser can’t add CamsAhead to your Home Screen.

    From your Home Screen, CamsAhead opens full screen with one tap. It keeps the screen on while you drive, where your phone allows it.

    1. Tap Share
      In Safari’s toolbar, or in its ⋯ menu.
    2. Tap Share
      In your browser’s address bar or menu.
    3. Open this page in Safari
      Look for “Open in Safari” or “Open in browser” in this app’s menu, or copy the link.
    4. Copy the link, then paste it in Safari
      Or type CamsAhead.com in Safari.
    5. In Safari, tap Share, then Add to Home Screen
    6. Tap Add to Home Screen
      Scroll down the list if you don’t see it.
    7. Open the ⋮ menu
      Then tap “Add to Home screen” or “Install app”.
    8. Tap Add, then open CamsAhead from your Home Screen. Tap Install, then open CamsAhead from your Home Screen.

    Don’t see Add to Home Screen? Open this page in Safari.

    Or tap Share in this browser, then Add to Home Screen.

    Alerts work while CamsAhead is open on screen, from the Home Screen or the browser. If the screen locks or you switch apps, they stop.

    DriveBetaReport a problem