CamsAhead

Near me

Near me

Washington Data Center Intelligence

Mapped Washington data center sites, with their power, water and risk

One app for every Washington county: data center sites, power, grid and FEMA risk, with hearing alerts and an API. 71 data center buildings are mapped in 7 of its 39 counties, and businesses pay 10.97¢ per kWh for power, 18% below the US average.

$390 a month3 seats · cancel any time

Where are Washington's data centers?

71 mapped buildings sit in 7 of Washington's 39 counties. Grant County has the most: 33.

Grant 33King 15Douglas 12Snohomish 4Pierce 3

    © OpenStreetMap contributors

    Which risks do the counties with data centers face?

    Heat waves are the most common risk: 3 of the 7 counties with mapped data centers rate high for them.

    Bars: counties with mapped data centers that rate Relatively high or Very high . Tap one to show it on the map.

    All 39 counties as a table

    What will a Washington site pay for power, and how fast is demand growing?

    Business power in Washington costs 10.97¢ per kWh, 18% below the US, and demand grew 13.8% since 2019.

    What do businesses pay for power?

    10.97¢ per kWh in 2025, 18% below the US average of 13.37¢.

    • Businesses16th cheapest of 51
      Washington
      10.97¢
      US
      13.37¢

    How fast is business power demand growing?

    Business power use in Washington grew 13.8% since 2019, more than 1 times the US rate (+10.5%).

    0%+10%Washington+13.8%US+10.5%2019’20’21’22’23’242025

    What makes Washington's power?

    101.7 TWh generated in 2025: hydro 64%, natural gas 16%, wind 8%.

    • Hydro64%
    • Natural gas16%
    • Wind7.9%
    • Nuclear7.6%
    • Coal3.1%

    Under 1% each: wood, solar, other gases, other biomass, other (eia's catch-all), petroleum, pumped storage.

    How much new power is proposed?

    2,481 MW of new plants are proposed for 2026–2030, 8% of today's 30,960 MW: other 49%, solar 46%, wind 5%.

    • Other (EIA's catch-all)1,205 MW
    • Solar1,150 MW
    • Wind126 MW

    Which grid would a Washington site join, and what are its water and hazard risks?

    No ISO/RTO covers 99.9% of Washington's power sales; coastal flooding, wildfires and earthquakes cost it most.

    Which grid serves Washington?

    Most of Washington has no ISO/RTO : utilities balance their own areas for 99.9% of retail sales.

    • No ISO/RTO99.9%

    Share of 2025 retail sales, by each utility's balancing authority .

    How much water do Washington's power plants use?

    Washington's power plants took in 15.4 billion gallons of water in 2024 to cool and returned about 24%; 11.7 billion gallons were used up .

    Returned 24.0%Used up 76.0%

    Which hazards cost Washington most?

    Coastal flooding, wildfires and earthquakes are Washington's biggest risks: each rates relatively high against other states .

    • Coastal floodingRelatively high
    • WildfireRelatively high
    • EarthquakeRelatively high
    • Inland floodingRelatively moderate
    • Heat waveRelatively moderate
    • TornadoRelatively low
    • DroughtVery low

    Who uses it, and what do they see first?

    Lawyers, brokers, site teams, utilities, insurers and investors each start from their own view of Washington's 39 counties.

    Land-use and energy lawyers

    Follow counties with data centers, their hearings and FEMA risk.

    • Grant County33 mapped · risk relatively low
    • King County15 mapped · risk very high
    • Douglas County12 mapped · risk relatively low
    7counties with data centers to follow, each with its planning and zoning agendas

    Land and industrial brokers

    Rank counties by mapped data center buildings, with the power price behind them.

    • Grant County33
    • King County15
    • Douglas County12
    • Snohomish County4
    • Pierce County3
    33mapped buildings in Grant County, the most in Washington

    Site selection teams

    Shortlist counties by mapped sites, power and risk on one map.

    7of 39 counties have mapped data centers

    Utilities and power buyers

    Follow prices, demand and the grid behind each site. Bars: business power sales since 2019.

    • Washington+13.8%
    • US+10.5%
    +13.8%business power sales since 2019, US +10.5%

    Insurers and lenders

    Bars: how many of the counties with data centers rate high for each hazard.

    • Heat wave3 of 7
    • Inland flooding3 of 7
    • Drought0 of 7
    • Tornado0 of 7
    3of 7 counties with mapped data centers rate high for at least one

    Investors and analysts

    See which new power plants are proposed, by source and size. Bars: MW proposed.

    • Other1,205
    • Solar1,150
    • Wind126
    2,481MW of new plants proposed for 2026–2030

    What's inside Washington Data Center Intelligence?

    One app for all 39 Washington counties, plus hearing alerts and an API. Every screen below is filled with Washington's real data.

    The Intelligence app

    Every county's sites, power, water and risk on one screen, with your watchlist.

    app.camsahead.com/intelligence/washington
    OverviewMapSitesAI campusesProjectsPowerWaterRiskHearingsAlertsAPI
    71mapped buildings
    10.97¢business power, per kWh
    +1.3%business demand, last 12 months
    WatchlistMappedFloodHeatDrought
    Grant County33moderatemoderatelow
    King County15Very highhighVery low
    Douglas County12moderatelowVery low
    Snohomish County4highhighVery low
    Pierce County3highhighVery low

    Hearings and filings

    Follow counties and cases; get the agenda and the record when a hearing is posted.

    Hearings · Washington
    Washington · counties you follow Planning, zoning and utility agendas
    • Grant County33 mapped data center buildingsAgenda alerts
    • King County15 mapped data center buildingsAgenda alerts
    • Douglas County12 mapped data center buildingsAgenda alerts
    • Snohomish County4 mapped data center buildingsAgenda alerts

    Alerts

    New projects, stage changes, hearings and data updates for what you follow, by email or in the app.

    Alerts · Washington
    • Power demandBusiness power sales +1.3% on the year before: 33.9 TWhEIA-861M, 2025-09 to 2026-08
    • Site riskKing County (15 mapped buildings) rates Very high for inland floodingFEMA National Risk Index
    • New supply2,481 MW of new plants proposed for 2026–2030EIA-860

    Data API

    County, power, risk and project data as JSON for your own tools.

    api.camsahead.com
    GET /v1/counties/53025
    {
      "fips": "53025",
      "name": "Grant County",
      "state": "WA",
      "pop2025": 105727,
      "pop_change_2020_pct": 6.6,
      "density_per_sqmi": 39.5,
      "nri": {
        "risk_rating": "Relatively Low",
        "ifld": {
          "rating": "Relatively Moderate",
          "score": 77.2
    Show the full response
        },
        "hwav": {
          "rating": "Relatively Moderate",
          "score": 87.1
        },
        "drgt": {
          "rating": "Relatively Low",
          "score": 32.7
        }
      },
      "grid": {
        "rtos": [],
        "utilities_n": 5
      },
      "state_power": {
        "commercial_cents_kwh": 10.97,
        "us_commercial_cents_kwh": 13.37,
        "as_of": "2025"
      }
    }

    What does it cost?

    Washington Data Center Intelligence is $390 a month for 3 seats.

    Washington Data Center Intelligence$390 a month
    • The Intelligence app: every county's sites, power, water and risk
    • Alerts on new projects, filings and hearings
    • Reports as web page, PDF and CSV
    • 3 seats · cancel any time
    Data APIFrom $999 a month
    • County, power, risk and project data as JSON
    • Keys for your own tools and models
    Public bodies$4,680 a year
    • Counties, cities, utilities and co-ops
    • Paid by invoice

    What stays open? The map, the county pages and every data center page stay open to everyone.

    Sources and updates

    How this page was made: CamsAhead writes each page type once, then fills it with this place's data from the sources below.

    • OpenStreetMap contributors: data center buildings, as of November 6, 2026; Open Database License (ODbL) 1.0, free copy on request.
    • U.S. Energy Information Administration (EIA): Form EIA-861 (released Oct 2026) and Form EIA-861 2025 detailed data (released Oct 2026): business power prices and sales by state, grid operators and utilities by county; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Forms EIA-923/906/920 (released Sep 2026): power generated by source, 2025; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Form EIA-860 (released Sep 2026): power plants proposed for 2026 to 2030; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Form EIA-860 (released Sep 2026): power plant capacity by state, 2025; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): thermoelectric cooling water data 2024, Forms EIA-860 and EIA-923 (retrieved Oct 2026): power plant cooling water by state.
    • FEMA: National Risk Index v1.20 (December 2025), NRI_Table_Counties and NRI_Table_States: natural hazard ratings by county and expected annual loss by state; retrieved October 31, 2026. This product uses the Federal Emergency Management Agency's OpenFEMA API, but is not endorsed by FEMA. The Federal Government or FEMA cannot vouch for the data or analyses derived from these data after the data have been retrieved from the Agency's website(s).
    • U.S. Census Bureau: US Census Bureau, Vintage 2025 county population estimates (co-est2025-alldata.csv): people by county.

    How CamsAhead counts cameras · Report a problem · Report a camera

    Add CamsAhead to your Home Screen Open in Safari to install Drive works best from your Home Screen Open in Safari to add it to your Home Screen

    It opens straight to the map.

    This app’s built-in browser can’t add CamsAhead to your Home Screen.

    From your Home Screen, CamsAhead opens full screen with one tap. It keeps the screen on while you drive, where your phone allows it.

    1. Tap Share
      In Safari’s toolbar, or in its ⋯ menu.
    2. Tap Share
      In your browser’s address bar or menu.
    3. Open this page in Safari
      Look for “Open in Safari” or “Open in browser” in this app’s menu, or copy the link.
    4. Copy the link, then paste it in Safari
      Or type CamsAhead.com in Safari.
    5. In Safari, tap Share, then Add to Home Screen
    6. Tap Add to Home Screen
      Scroll down the list if you don’t see it.
    7. Open the ⋮ menu
      Then tap “Add to Home screen” or “Install app”.
    8. Tap Add, then open CamsAhead from your Home Screen. Tap Install, then open CamsAhead from your Home Screen.

    Don’t see Add to Home Screen? Open this page in Safari.

    Or tap Share in this browser, then Add to Home Screen.

    Alerts work while CamsAhead is open on screen, from the Home Screen or the browser. If the screen locks or you switch apps, they stop.

    DriveBetaReport a problem