CamsAhead

Near me

Near me

Colorado Data Center Intelligence

Mapped Colorado data center sites, with their power, water and risk

One app for every Colorado county: data center sites, power, grid and FEMA risk, with hearing alerts and an API. 27 data center buildings are mapped in 7 of its 64 counties, and businesses pay 12.37¢ per kWh for power, 7% below the US average.

$390 a month3 seats · cancel any time

Where are Colorado's data centers?

27 mapped buildings sit in 7 of Colorado's 64 counties. Arapahoe County has the most: 11.

Arapahoe 11Douglas 6El Paso 4Denver 3Adams 1

    © OpenStreetMap contributors

    Which risks do the counties with data centers face?

    Tornadoes are the most common risk: 6 of the 7 counties with mapped data centers rate high for them.

    Bars: counties with mapped data centers that rate Relatively high or Very high . Tap one to show it on the map.

    All 64 counties as a table

    What will a Colorado site pay for power, and how fast is demand growing?

    Business power in Colorado costs 12.37¢ per kWh, 7% below the US, and demand fell 0.8% since 2019.

    What do businesses pay for power?

    12.37¢ per kWh in 2025, 7% below the US average of 13.37¢.

    • Businesses24th most expensive of 51
      Colorado
      12.37¢
      US
      13.37¢

    How fast is business power demand growing?

    Business power use in Colorado fell 0.8% since 2019, while the US grew 10.5%.

    0%+10%Colorado−0.8%US+10.5%2019’20’21’22’23’242025

    What makes Colorado's power?

    56.6 TWh generated in 2025: natural gas 32%, wind 30%, coal 25%.

    • Natural gas32%
    • Wind30%
    • Coal25%
    • Solar9.9%
    • Hydro3.0%

    Under 1% each: other biomass, pumped storage, petroleum, other (eia's catch-all).

    How much new power is proposed?

    7,209 MW of new plants are proposed for 2026–2030, about a third of today's 20,913 MW: solar 38%, other 26%, wind 21%, natural gas 15%.

    • Solar2,738 MW
    • Other (EIA's catch-all)1,848 MW
    • Wind1,540 MW
    • Natural gas1,082 MW

    Which grid would a Colorado site join, and what are its water and hazard risks?

    No ISO/RTO covers Colorado's power sales; wildfires cost it most.

    Which grid serves Colorado?

    Colorado has no ISO/RTO : utilities balance their own areas for all of its retail sales.

    • No ISO/RTOAll

    Share of 2025 retail sales, by each utility's balancing authority .

    How much water do Colorado's power plants use?

    Colorado's power plants took in 97.3 billion gallons of water in 2024 to cool and returned about 88%; 10.9 billion gallons were used up .

    Returned 88.8%Used up 11.2%

    Which hazards cost Colorado most?

    Wildfires are Colorado's biggest risk (relatively high) ; the rest rate moderate or lower.

    • WildfireRelatively high
    • Inland floodingRelatively moderate
    • TornadoRelatively moderate
    • DroughtRelatively moderate
    • Heat waveRelatively low
    • EarthquakeRelatively low

    Who uses it, and what do they see first?

    Lawyers, brokers, site teams, utilities, insurers and investors each start from their own view of Colorado's 64 counties.

    Land-use and energy lawyers

    Follow counties with data centers, their hearings and FEMA risk.

    • Arapahoe County11 mapped · risk relatively moderate
    • Douglas County6 mapped · risk relatively moderate
    • El Paso County4 mapped · risk relatively moderate
    7counties with data centers to follow, each with its planning and zoning agendas

    Land and industrial brokers

    Rank counties by mapped data center buildings, with the power price behind them.

    • Arapahoe County11
    • Douglas County6
    • El Paso County4
    • Denver County3
    • Adams County1
    11mapped buildings in Arapahoe County, the most in Colorado

    Site selection teams

    Shortlist counties by mapped sites, power and risk on one map.

    7of 64 counties have mapped data centers

    Utilities and power buyers

    Follow prices, demand and the grid behind each site. Bars: business power sales since 2019.

    • Colorado−0.8%
    • US+10.5%
    −0.8%business power sales since 2019, US +10.5%

    Insurers and lenders

    Bars: how many of the counties with data centers rate high for each hazard.

    • Tornado6 of 7
    • Inland flooding3 of 7
    • Wildfire3 of 7
    • Drought0 of 7
    6of 7 counties with mapped data centers rate high for at least one

    Investors and analysts

    See which new power plants are proposed, by source and size. Bars: MW proposed.

    • Solar2,738
    • Other1,848
    • Wind1,540
    • Natural gas1,082
    7,209MW of new plants proposed for 2026–2030

    What's inside Colorado Data Center Intelligence?

    One app for all 64 Colorado counties, plus hearing alerts and an API. Every screen below is filled with Colorado's real data.

    The Intelligence app

    Every county's sites, power, water and risk on one screen, with your watchlist.

    app.camsahead.com/intelligence/colorado
    OverviewMapSitesAI campusesProjectsPowerWaterRiskHearingsAlertsAPI
    27mapped buildings
    12.37¢business power, per kWh
    +1.3%business demand, last 12 months
    WatchlistMappedFloodHeatDrought
    Arapahoe County11moderatelowlow
    Douglas County6moderatelowlow
    El Paso County4highlowlow
    Denver County3highlowVery low
    Adams County1moderatelowlow

    Hearings and filings

    Follow counties and cases; get the agenda and the record when a hearing is posted.

    Hearings · Colorado
    Colorado · counties you follow Planning, zoning and utility agendas
    • Arapahoe County11 mapped data center buildingsAgenda alerts
    • Douglas County6 mapped data center buildingsAgenda alerts
    • El Paso County4 mapped data center buildingsAgenda alerts
    • Denver County3 mapped data center buildingsAgenda alerts

    Alerts

    New projects, stage changes, hearings and data updates for what you follow, by email or in the app.

    Alerts · Colorado
    • Power demandBusiness power sales +1.3% on the year before: 21.4 TWhEIA-861M, 2025-09 to 2026-08
    • Site riskArapahoe County (11 mapped buildings) rates Relatively high for tornadoFEMA National Risk Index
    • New supply7,209 MW of new plants proposed for 2026–2030EIA-860

    Data API

    County, power, risk and project data as JSON for your own tools.

    api.camsahead.com
    GET /v1/counties/08005
    {
      "fips": "08005",
      "name": "Arapahoe County",
      "state": "CO",
      "pop2025": 673820,
      "pop_change_2020_pct": 2.9,
      "density_per_sqmi": 844.5,
      "nri": {
        "risk_rating": "Relatively Moderate",
        "ifld": {
          "rating": "Relatively Moderate",
          "score": 92.5
    Show the full response
        },
        "hwav": {
          "rating": "Relatively Low",
          "score": 68.6
        },
        "drgt": {
          "rating": "Relatively Low",
          "score": 44.6
        }
      },
      "grid": {
        "rtos": [],
        "utilities_n": 4
      },
      "state_power": {
        "commercial_cents_kwh": 12.37,
        "us_commercial_cents_kwh": 13.37,
        "as_of": "2025"
      }
    }

    What does it cost?

    Colorado Data Center Intelligence is $390 a month for 3 seats.

    Colorado Data Center Intelligence$390 a month
    • The Intelligence app: every county's sites, power, water and risk
    • Alerts on new projects, filings and hearings
    • Reports as web page, PDF and CSV
    • 3 seats · cancel any time
    Data APIFrom $999 a month
    • County, power, risk and project data as JSON
    • Keys for your own tools and models
    Public bodies$4,680 a year
    • Counties, cities, utilities and co-ops
    • Paid by invoice

    What stays open? The map, the county pages and every data center page stay open to everyone.

    Sources and updates

    How this page was made: CamsAhead writes each page type once, then fills it with this place's data from the sources below.

    • OpenStreetMap contributors: data center buildings, as of November 6, 2026; Open Database License (ODbL) 1.0, free copy on request.
    • U.S. Energy Information Administration (EIA): Form EIA-861 (released Oct 2026) and Form EIA-861 2025 detailed data (released Oct 2026): business power prices and sales by state, grid operators and utilities by county; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Forms EIA-923/906/920 (released Sep 2026): power generated by source, 2025; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Form EIA-860 (released Sep 2026): power plants proposed for 2026 to 2030; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Form EIA-860 (released Sep 2026): power plant capacity by state, 2025; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): thermoelectric cooling water data 2024, Forms EIA-860 and EIA-923 (retrieved Oct 2026): power plant cooling water by state.
    • FEMA: National Risk Index v1.20 (December 2025), NRI_Table_Counties and NRI_Table_States: natural hazard ratings by county and expected annual loss by state; retrieved October 31, 2026. This product uses the Federal Emergency Management Agency's OpenFEMA API, but is not endorsed by FEMA. The Federal Government or FEMA cannot vouch for the data or analyses derived from these data after the data have been retrieved from the Agency's website(s).
    • U.S. Census Bureau: US Census Bureau, Vintage 2025 county population estimates (co-est2025-alldata.csv): people by county.

    How CamsAhead counts cameras · Report a problem · Report a camera

    Add CamsAhead to your Home Screen Open in Safari to install Drive works best from your Home Screen Open in Safari to add it to your Home Screen

    It opens straight to the map.

    This app’s built-in browser can’t add CamsAhead to your Home Screen.

    From your Home Screen, CamsAhead opens full screen with one tap. It keeps the screen on while you drive, where your phone allows it.

    1. Tap Share
      In Safari’s toolbar, or in its ⋯ menu.
    2. Tap Share
      In your browser’s address bar or menu.
    3. Open this page in Safari
      Look for “Open in Safari” or “Open in browser” in this app’s menu, or copy the link.
    4. Copy the link, then paste it in Safari
      Or type CamsAhead.com in Safari.
    5. In Safari, tap Share, then Add to Home Screen
    6. Tap Add to Home Screen
      Scroll down the list if you don’t see it.
    7. Open the ⋮ menu
      Then tap “Add to Home screen” or “Install app”.
    8. Tap Add, then open CamsAhead from your Home Screen. Tap Install, then open CamsAhead from your Home Screen.

    Don’t see Add to Home Screen? Open this page in Safari.

    Or tap Share in this browser, then Add to Home Screen.

    Alerts work while CamsAhead is open on screen, from the Home Screen or the browser. If the screen locks or you switch apps, they stop.

    DriveBetaReport a problem