Land-use and energy lawyers
Follow counties with data centers, their hearings and FEMA risk.
- Bernalillo County9 mapped · risk relatively high
- Valencia County5 mapped · risk relatively moderate
- Doña Ana County2 mapped · risk relatively high
Mapped New Mexico data center sites, with their power, water and risk
One app for every New Mexico county: data center sites, power, grid and FEMA risk, with hearing alerts and an API. 17 data center buildings are mapped in 4 of its 33 counties, and businesses pay 11.01¢ per kWh for power, 18% below the US average.
17 mapped buildings sit in 4 of New Mexico's 33 counties. Bernalillo County has the most: 9.
© OpenStreetMap contributors
Inland flooding is the most common risk: 2 of the 4 counties with mapped data centers rate high for it.
Bars: counties with mapped data centers that rate Relatively high or Very high . Tap one to show it on the map.
Business power in New Mexico costs 11.01¢ per kWh, 18% below the US, and demand grew 3.9% since 2019.
11.01¢ per kWh in 2025, 18% below the US average of 13.37¢.
Business power use in New Mexico grew 3.9% since 2019, slower than the US (+10.5%).
39.4 TWh generated in 2025: wind 37%, natural gas 27%, coal 21%.
Under 1% each: hydro, geothermal, other biomass, petroleum. Other (EIA's catch-all) used more power than it made, so it is left out.
7,907 MW of new plants are proposed for 2026–2030, about two-thirds of today's 13,191 MW: wind 49%, solar 26%, other 16%, natural gas 9%.
No ISO/RTO covers 52.7% of New Mexico's power sales; wildfires cost it most.
Most of New Mexico has no ISO/RTO : utilities balance their own areas for 52.7% of retail sales.
Share of 2025 retail sales, by each utility's balancing authority .
New Mexico's power plants took in 9.2 billion gallons of water in 2024 to cool and returned about 5%; 8.7 billion gallons were used up .
Wildfires are New Mexico's biggest risk (relatively high) ; the rest rate moderate or lower.
New Mexico has 2 AI campuses on the list; 1 is being built. It, OpenAI Stargate New Mexico, is planned at 1,750 MW , full size by Dec 2028.
Bars: IT power expected at full size . Dates are Epoch AI's own estimates .
Other AI campuses in New Mexico: Meta Los Lunas.
Lawyers, brokers, site teams, utilities, insurers and investors each start from their own view of New Mexico's 33 counties.
Follow counties with data centers, their hearings and FEMA risk.
Rank counties by mapped data center buildings, with the power price behind them.
Shortlist counties by mapped sites, power and risk on one map.
Follow prices, demand and the grid behind each site. Bars: business power sales since 2019.
Bars: how many of the counties with data centers rate high for each hazard.
Track AI campuses being built, their owners and users. Bars: MW expected at full size.
One app for all 33 New Mexico counties, plus hearing alerts and an API. Every screen below is filled with New Mexico's real data.
Every county's sites, power, water and risk on one screen, with your watchlist.
| Watchlist | Mapped | Flood | Heat | Drought |
|---|---|---|---|---|
| Bernalillo County | 9 | high | moderate | low |
| Valencia County | 5 | moderate | low | low |
| Doña Ana County | 2 | high | moderate | high |
| Santa Fe County | 1 | moderate | low | moderate |
Follow counties and cases; get the agenda and the record when a hearing is posted.
New projects, stage changes, hearings and data updates for what you follow, by email or in the app.
County, power, risk and project data as JSON for your own tools.
GET /v1/counties/35001
{
"fips": "35001",
"name": "Bernalillo County",
"state": "NM",
"pop2025": 667601,
"pop_change_2020_pct": -1.3,
"density_per_sqmi": 574.9,
"nri": {
"risk_rating": "Relatively High",
"ifld": {
"rating": "Relatively High",
"score": 96.3 },
"hwav": {
"rating": "Relatively Moderate",
"score": 95.4
},
"drgt": {
"rating": "Relatively Low",
"score": 57.8
}
},
"grid": {
"rtos": [],
"utilities_n": 3
},
"state_power": {
"commercial_cents_kwh": 11.01,
"us_commercial_cents_kwh": 13.37,
"as_of": "2025"
}
}New Mexico Data Center Intelligence is $390 a month for 3 seats.
What stays open? The map, the county pages and every data center page stay open to everyone.
How this page was made: CamsAhead writes each page type once, then fills it with this place's data from the sources below.
How CamsAhead counts cameras · Report a problem · Report a camera
Buildings and sites that OpenStreetMap volunteers have tagged as data centers. It counts mapped objects, not an official register, so some data centers are not on it yet.
FEMA's drought rating is our water view for each county: how much drought is expected to cost a year, against the rest of the US.
FEMA's National Risk Index estimates what each hazard costs a year, on average, in damage to buildings, crops and people. It then rates each county or state against the rest of the US, from Very low to Very high. "Rate high" here means Relatively high or Very high.
A large data center campus built for AI computing, on Epoch AI's list of AI data centers. "Being built" means Epoch lists no computers running there yet.
The average price businesses paid for one kilowatt-hour of electricity in 2025: their total bills divided by the power they bought. New Mexico ranks 17th cheapest of 51 (the 50 states and DC).
An ISO or RTO runs the high-voltage grid and the wholesale power market for a region. Most of New Mexico has none: each utility balances its own area.
Electricity sold to businesses: offices, shops and most data centers. EIA does not count data centers on their own; most sit in this group. New Mexico sold 9.0 TWh in 2019 and 9.4 TWh in 2025.
Latest 12 months (2025-09 to 2026-08): 9.3 TWh, −2.6% on the 12 months before.
A terawatt-hour is a billion kilowatt-hours: a measure of how much electricity is made or used over time.
New generators that plant owners have reported to EIA for 2026–2030. They are plans, not commitments: some are delayed or dropped.
EIA's own "Other" group, for sources outside its main fuel types. EIA does not split it further in this table, so neither do we.
The organisation that keeps supply and demand matched, minute by minute, in its area. Each utility reports its sales under one.
Taken in (withdrawn): water a power plant pulls from a river, lake or well to cool. Used up (consumed): the part that evaporates and does not go back. These are power plant figures, the grid's water, not data center water.
A megawatt (MW) measures power: how much electricity a site can draw at once. For AI campuses we show IT power, the power for the computers themselves, not cooling or offices. 1,000 MW is one gigawatt.
First online: when Epoch AI expects the first computers to run. Full size: when the campus should reach its full planned power. Both are Epoch's estimates and can move.