One app for every Ohio county: data center sites, power, grid and FEMA risk, with hearing alerts and an API. 91 data center buildings are mapped in 12 of its 88 counties, and businesses pay 11.58¢ per kWh for power, 13% below the US average.

$390 a month3 seats · cancel any time

Where are Ohio's data centers?

91 mapped buildings sit in 12 of Ohio's 88 counties. Franklin County has the most: 33.

Franklin 33Licking 30Union 9Cuyahoga 5Hamilton 3

    © OpenStreetMap contributors

    Which risks do the counties with data centers face?

    Tornadoes are the most common risk: 6 of the 12 counties with mapped data centers rate high for them.

    Bars: counties with mapped data centers that rate Relatively high or Very high . Tap one to show it on the map.

    All 88 counties as a table

    What will a Ohio site pay for power, and how fast is demand growing?

    Business power in Ohio costs 11.58¢ per kWh, 13% below the US, and demand grew 25.5% since 2019.

    What do businesses pay for power?

    11.58¢ per kWh in 2025, 13% below the US average of 13.37¢.

    • Businesses23rd cheapest of 51
      Ohio
      11.58¢
      US
      13.37¢

    How fast is business power demand growing?

    Business power use in Ohio grew 25.5% since 2019, more than twice the US rate (+10.5%).

    0%+20%Ohio+25.5%US+10.5%2019’20’21’22’23’242025

    What makes Ohio's power?

    145.3 TWh generated in 2025: natural gas 54%, coal 25%, nuclear 12%.

    • Natural gas54%
    • Coal25%
    • Nuclear12%
    • Solar5.5%
    • Wind2.0%

    Under 1% each: petroleum, other gases, hydro, wood, other biomass, other (eia's catch-all).

    How much new power is proposed?

    4,886 MW of new plants are proposed for 2026–2030, 15% of today's 31,730 MW: solar 67%, natural gas 18%, wind 9%, other 5%.

    • Solar3,260 MW
    • Natural gas900 MW
    • Wind437 MW
    • Other (EIA's catch-all)266 MW
    • Hydro20 MW
    • Other biomass3 MW

    Which grid would a Ohio site join, and what are its water and hazard risks?

    PJM serves all of Ohio's power sales; inland flooding and tornadoes cost it most.

    Which grid serves Ohio?

    PJM serves all of Ohio's retail power sales.

    • PJMAll

    Share of 2025 retail sales, by each utility's balancing authority .

    How much water do Ohio's power plants use?

    Ohio's power plants took in 847 billion gallons of water in 2024 to cool and returned about 95%; 37.7 billion gallons were used up .

    Returned 95.5%Used up 4.5%

    Which hazards cost Ohio most?

    Inland flooding and tornadoes are Ohio's biggest risks: each rates relatively high against other states .

    • Inland floodingRelatively high
    • TornadoRelatively high
    • Heat waveRelatively moderate
    • DroughtRelatively low
    • EarthquakeRelatively low
    • Coastal floodingVery low
    • HurricaneVery low
    • WildfireVery low

    Which AI campuses are being built in Ohio, and how big will they be?

    Ohio has 7 AI campuses on the list; 2 are being built, 636 MW planned in all. The biggest, Meta Bowling Green, is planned at 422 MW , full size by Jan 2028.

    Bars: IT power expected at full size . Dates are Epoch AI's own estimates .

    Other AI campuses in Ohio: AWS New Albany, Google Columbus, Google Lancaster, Google New Albany, Meta Prometheus.

    Campuses without a county on record: AWS New Albany, Google New Albany, Meta Prometheus. They are left off the county map.

    Who uses it, and what do they see first?

    Lawyers, brokers, site teams, utilities, insurers and investors each start from their own view of Ohio's 88 counties.

    Land-use and energy lawyers

    Follow counties with data centers, their hearings and FEMA risk.

    • Franklin County33 mapped · risk relatively high
    • Licking County30 mapped · risk relatively low
    • Union County9 mapped · risk very low
    12counties with data centers to follow, each with its planning and zoning agendas

    Land and industrial brokers

    Rank counties by mapped data center buildings, with the power price behind them.

    • Franklin County33
    • Licking County30
    • Union County9
    • Cuyahoga County5
    • Hamilton County3
    33mapped buildings in Franklin County, the most in Ohio

    Site selection teams

    Shortlist counties by mapped sites, power and risk on one map.

    12of 88 counties have mapped data centers

    Utilities and power buyers

    Follow prices, demand and the grid behind each site. Bars: business power sales since 2019.

    • Ohio+25.5%
    • US+10.5%
    +25.5%business power sales since 2019, US +10.5%

    Insurers and lenders

    Bars: how many of the counties with data centers rate high for each hazard.

    • Tornado6 of 12
    • Inland flooding4 of 12
    • Heat wave3 of 12
    • Drought0 of 12
    6of 12 counties with mapped data centers rate high for at least one

    Investors and analysts

    Track AI campuses being built, their owners and users. Bars: MW expected at full size.

    • Meta Bowling Green422 MW
    • OpenAI Stargate Lordstown214 MW
    636MW planned at 2 AI campuses being built

    What's inside Ohio Data Center Intelligence?

    One app for all 88 Ohio counties, plus hearing alerts and an API. Every screen below is filled with Ohio's real data.

    The Intelligence app

    Every county's sites, power, water and risk on one screen, with your watchlist.

    app.camsahead.com/intelligence/ohio
    OverviewMapSitesAI campusesProjectsPowerWaterRiskHearingsAlertsAPI
    91mapped buildings
    7AI campuses
    11.58¢business power, per kWh
    +15.6%business demand, last 12 months
    WatchlistMappedFloodHeatDrought
    Franklin County33highhighlow
    Licking County30moderatemoderatemoderate
    Union County9lowlowlow
    Cuyahoga County5highhighnot rated
    Hamilton County3highhighlow

    Hearings and filings

    Follow counties and cases; get the agenda and the record when a hearing is posted.

    Hearings · Ohio
    Ohio · counties you follow Planning, zoning and utility agendas
    • Franklin County33 mapped data center buildingsAgenda alerts
    • Licking County30 mapped data center buildingsAgenda alerts
    • Union County9 mapped data center buildingsAgenda alerts
    • Cuyahoga County5 mapped data center buildingsAgenda alerts

    Alerts

    New projects, stage changes, hearings and data updates for what you follow, by email or in the app.

    Alerts · Ohio
    • Power demandBusiness power sales +15.6% on the year before: 63.2 TWhEIA-861M, 2025-09 to 2026-08
    • Site riskFranklin County (33 mapped buildings) rates Relatively high for inland floodingFEMA National Risk Index
    • AI campus being builtMeta Bowling Green: 422 MW of IT power expected · first online Feb 2027 · full size Jan 2028Epoch AI

    Data API

    County, power, risk and project data as JSON for your own tools.

    api.camsahead.com
    GET /v1/counties/39049
    {
      "fips": "39049",
      "name": "Franklin County",
      "state": "OH",
      "pop2025": 1361536,
      "pop_change_2020_pct": 2.9,
      "density_per_sqmi": 2557.3,
      "nri": {
        "risk_rating": "Relatively High",
        "ifld": {
          "rating": "Relatively High",
          "score": 98.8
    Show the full response
        },
        "hwav": {
          "rating": "Relatively High",
          "score": 98.9
        },
        "drgt": {
          "rating": "Relatively Low",
          "score": 57.6
        }
      },
      "grid": {
        "rtos": [
          "PJM"
        ],
        "utilities_n": 9
      },
      "state_power": {
        "commercial_cents_kwh": 11.58,
        "us_commercial_cents_kwh": 13.37,
        "as_of": "2025"
      }
    }

    What does it cost?

    Ohio Data Center Intelligence is $390 a month for 3 seats.

    Ohio Data Center Intelligence$390 a month
    • The Intelligence app: every county's sites, power, water and risk
    • Alerts on new projects, filings and hearings
    • Reports as web page, PDF and CSV
    • 3 seats · cancel any time
    Data APIFrom $999 a month
    • County, power, risk and project data as JSON
    • Keys for your own tools and models
    Public bodies$4,680 a year
    • Counties, cities, utilities and co-ops
    • Paid by invoice

    What stays open? The map, the county pages and every data center page stay open to everyone.

    Sources and updates

    How this page was made: CamsAhead writes each page type once, then fills it with this place's data from the sources below.

    • OpenStreetMap contributors: data center buildings, as of November 6, 2026; Open Database License (ODbL) 1.0, free copy on request.
    • Epoch AI: "AI data centers", CC BY 4.0, retrieved November 7, 2026; changes noted.
    • U.S. Energy Information Administration (EIA): Form EIA-861 (released Oct 2026) and Form EIA-861 2025 detailed data (released Oct 2026): business power prices and sales by state, grid operators and utilities by county; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Forms EIA-923/906/920 (released Sep 2026): power generated by source, 2025; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Form EIA-860 (released Sep 2026): power plants proposed for 2026 to 2030; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Form EIA-860 (released Sep 2026): power plant capacity by state, 2025; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): thermoelectric cooling water data 2024, Forms EIA-860 and EIA-923 (retrieved Oct 2026): power plant cooling water by state.
    • FEMA: National Risk Index v1.20 (December 2025), NRI_Table_Counties and NRI_Table_States: natural hazard ratings by county and expected annual loss by state; retrieved October 31, 2026. This product uses the Federal Emergency Management Agency's OpenFEMA API, but is not endorsed by FEMA. The Federal Government or FEMA cannot vouch for the data or analyses derived from these data after the data have been retrieved from the Agency's website(s).
    • U.S. Census Bureau: US Census Bureau, Vintage 2025 county population estimates (co-est2025-alldata.csv): people by county.

    How CamsAhead counts cameras · Report a problem · Report a camera

    Add CamsAhead to your Home Screen Open in Safari to install Drive works best from your Home Screen Open in Safari to add it to your Home Screen

    It opens straight to the map.

    This app’s built-in browser can’t add CamsAhead to your Home Screen.

    From your Home Screen, CamsAhead opens full screen with one tap. It keeps the screen on while you drive, where your phone allows it.

    1. Tap Share
      In Safari’s toolbar, or in its ⋯ menu.
    2. Tap Share
      In your browser’s address bar or menu.
    3. Open this page in Safari
      Look for “Open in Safari” or “Open in browser” in this app’s menu, or copy the link.
    4. Copy the link, then paste it in Safari
      Or type CamsAhead.com in Safari.
    5. In Safari, tap Share, then Add to Home Screen
    6. Tap Add to Home Screen
      Scroll down the list if you don’t see it.
    7. Open the ⋮ menu
      Then tap “Add to Home screen” or “Install app”.
    8. Tap Add, then open CamsAhead from your Home Screen. Tap Install, then open CamsAhead from your Home Screen.

    Don’t see Add to Home Screen? Open this page in Safari.

    Or tap Share in this browser, then Add to Home Screen.

    Alerts work while CamsAhead is open on screen, from the Home Screen or the browser. If the screen locks or you switch apps, they stop.

    DriveBetaReport a problem