CamsAhead

Near me

Near me

Texas Data Center Intelligence

Mapped Texas data center sites, with their power, water and risk

One app for every Texas county: data center sites, power, grid and FEMA risk, with hearing alerts and an API. 221 data center buildings are mapped in 23 of its 254 counties, and businesses pay 8.56¢ per kWh for power, 36% below the US average.

$390 a month3 seats · cancel any time

Where are Texas's data centers?

221 mapped buildings sit in 23 of Texas's 254 counties. Bexar County has the most: 61.

Bexar 61Taylor 40Dallas 30Collin 15Ellis 15

    © OpenStreetMap contributors

    Which risks do the counties with data centers face?

    Tornadoes are the most common risk: 13 of the 23 counties with mapped data centers rate high for them.

    Bars: counties with mapped data centers that rate Relatively high or Very high . Tap one to show it on the map.

    All 254 counties as a table

    What will a Texas site pay for power, and how fast is demand growing?

    Business power in Texas costs 8.56¢ per kWh, 36% below the US, and demand grew 23% since 2019.

    What do businesses pay for power?

    8.56¢ per kWh in 2025, 36% below the US average of 13.37¢.

    • Businesses3rd cheapest of 51
      Texas
      8.56¢
      US
      13.37¢

    How fast is business power demand growing?

    Business power use in Texas grew 23% since 2019, more than twice the US rate (+10.5%).

    0%+10%+20%Texas+23%US+10.5%2019’20’21’22’23’242025

    What makes Texas's power?

    601.0 TWh generated in 2025: natural gas 48%, wind 22%, coal 12%.

    • Natural gas48%
    • Wind22%
    • Coal12%
    • Solar11%
    • Nuclear7.0%

    Under 1% each: other gases, wood, hydro, petroleum, other biomass. Other (EIA's catch-all) used more power than it made, so it is left out.

    How much new power is proposed?

    98,346 MW of new plants are proposed for 2026–2030, about half of today's 185,215 MW: solar 44%, other 29%, natural gas 22%, wind 5%.

    • Solar43,374 MW
    • Other (EIA's catch-all)28,395 MW
    • Natural gas21,212 MW
    • Wind5,336 MW
    • Petroleum30 MW

    Which grid would a Texas site join, and what are its water and hazard risks?

    ERCOT serves 88.2% of Texas's power sales; heat waves, tornadoes and drought cost it most.

    Which grid serves Texas?

    ERCOT serves 88.2% of Texas's retail power sales.

    • ERCOT88.2%
    • SPP5.6%
    • MISO4.9%
    • No ISO/RTO1.3%

    Share of 2025 retail sales, by each utility's balancing authority .

    How much water do Texas's power plants use?

    Texas's power plants took in 7,304 billion gallons of water in 2024 to cool and returned about 98%; 115 billion gallons were used up .

    Returned 98.4%Used up 1.6%

    Which hazards cost Texas most?

    Heat waves, tornadoes and drought are Texas's biggest risks: each rates very high against other states .

    • Heat waveVery high
    • TornadoVery high
    • DroughtVery high
    • Inland floodingRelatively high
    • HurricaneRelatively high
    • WildfireRelatively high
    • Coastal floodingRelatively moderate
    • EarthquakeRelatively low

    Which AI campuses are being built in Texas, and how big will they be?

    Texas has 14 AI campuses on the list; 5 are being built, 4,142 MW planned in all. The biggest, OpenAI Stargate Shackelford, is planned at 1,400 MW , full size by Nov 2028.

    Bars: IT power expected at full size . Dates are Epoch AI's own estimates .

    Other AI campuses in Texas: CoreWeave Denton TX, Coreweave Helios, Google Midlothian, Google Red Oak, Meta Temple, Microsoft SAT14, Microsoft SAT40, OpenAI Stargate Abilene, Vantage TX1.

    Campuses without a county on record: Crusoe Abilene Expansion, OpenAI Stargate Abilene. They are left off the county map.

    Who uses it, and what do they see first?

    Lawyers, brokers, site teams, utilities, insurers and investors each start from their own view of Texas's 254 counties.

    Land-use and energy lawyers

    Follow counties with data centers, their hearings and FEMA risk.

    • Bexar County61 mapped · risk relatively high
    • Taylor County40 mapped · risk relatively moderate
    • Dallas County30 mapped · risk very high
    23counties with data centers to follow, each with its planning and zoning agendas

    Land and industrial brokers

    Rank counties by mapped data center buildings, with the power price behind them.

    • Bexar County61
    • Taylor County40
    • Dallas County30
    • Collin County15
    • Ellis County15
    61mapped buildings in Bexar County, the most in Texas

    Site selection teams

    Shortlist counties by mapped sites, power and risk on one map.

    23of 254 counties have mapped data centers

    Utilities and power buyers

    Follow prices, demand and the grid behind each site. Bars: business power sales since 2019.

    • Texas+23%
    • US+10.5%
    +23%business power sales since 2019, US +10.5%

    Insurers and lenders

    Bars: how many of the counties with data centers rate high for each hazard.

    • Tornado13 of 23
    • Inland flooding9 of 23
    • Heat wave8 of 23
    • Drought4 of 23
    16of 23 counties with mapped data centers rate high for at least one

    Investors and analysts

    Track AI campuses being built, their owners and users. Bars: MW expected at full size.

    • OpenAI Stargate Shackelford1,400 MW
    • Goodnight1,006 MW
    • OpenAI Stargate Milam857 MW
    • Crusoe Abilene Expansion672 MW
    4,142MW planned at 5 AI campuses being built

    What's inside Texas Data Center Intelligence?

    One app for all 254 Texas counties, plus hearing alerts and an API. Every screen below is filled with Texas's real data.

    The Intelligence app

    Every county's sites, power, water and risk on one screen, with your watchlist.

    app.camsahead.com/intelligence/texas
    OverviewMapSitesAI campusesProjectsPowerWaterRiskHearingsAlertsAPI
    221mapped buildings
    14AI campuses
    8.56¢business power, per kWh
    +8%business demand, last 12 months
    WatchlistMappedFloodHeatDrought
    Bexar County61Very highhighmoderate
    Taylor County40moderatemoderatemoderate
    Dallas County30Very highVery highlow
    Collin County15highhighlow
    Ellis County15moderatemoderatelow

    Hearings and filings

    Follow counties and cases; get the agenda and the record when a hearing is posted.

    Hearings · Texas
    Texas · counties you follow Planning, zoning and utility agendas
    • Bexar County61 mapped data center buildingsAgenda alerts
    • Taylor County40 mapped data center buildingsAgenda alerts
    • Dallas County30 mapped data center buildingsAgenda alerts
    • Collin County15 mapped data center buildingsAgenda alerts

    Alerts

    New projects, stage changes, hearings and data updates for what you follow, by email or in the app.

    Alerts · Texas
    • Power demandBusiness power sales +8% on the year before: 184.2 TWhEIA-861M, 2025-09 to 2026-08
    • Site riskBexar County (61 mapped buildings) rates Very high for inland floodingFEMA National Risk Index
    • AI campus being builtOpenAI Stargate Shackelford: 1,400 MW of IT power expected · first online Aug 2027 · full size Nov 2028Epoch AI

    Data API

    County, power, risk and project data as JSON for your own tools.

    api.camsahead.com
    GET /v1/counties/48029
    {
      "fips": "48029",
      "name": "Bexar County",
      "state": "TX",
      "pop2025": 2160088,
      "pop_change_2020_pct": 7.5,
      "density_per_sqmi": 1741.4,
      "nri": {
        "risk_rating": "Relatively High",
        "ifld": {
          "rating": "Very High",
          "score": 99.7
    Show the full response
        },
        "hwav": {
          "rating": "Relatively High",
          "score": 99.4
        },
        "drgt": {
          "rating": "Relatively Moderate",
          "score": 69.5
        }
      },
      "grid": {
        "rtos": [
          "ERCOT"
        ],
        "utilities_n": 5
      },
      "state_power": {
        "commercial_cents_kwh": 8.56,
        "us_commercial_cents_kwh": 13.37,
        "as_of": "2025"
      }
    }

    What does it cost?

    Texas Data Center Intelligence is $390 a month for 3 seats.

    Texas Data Center Intelligence$390 a month
    • The Intelligence app: every county's sites, power, water and risk
    • Alerts on new projects, filings and hearings
    • Reports as web page, PDF and CSV
    • 3 seats · cancel any time
    Data APIFrom $999 a month
    • County, power, risk and project data as JSON
    • Keys for your own tools and models
    Public bodies$4,680 a year
    • Counties, cities, utilities and co-ops
    • Paid by invoice

    What stays open? The map, the county pages and every data center page stay open to everyone.

    Sources and updates

    How this page was made: CamsAhead writes each page type once, then fills it with this place's data from the sources below.

    • OpenStreetMap contributors: data center buildings, as of November 6, 2026; Open Database License (ODbL) 1.0, free copy on request.
    • Epoch AI: "AI data centers", CC BY 4.0, retrieved November 7, 2026; changes noted.
    • U.S. Energy Information Administration (EIA): Form EIA-861 (released Oct 2026) and Form EIA-861 2025 detailed data (released Oct 2026): business power prices and sales by state, grid operators and utilities by county; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Forms EIA-923/906/920 (released Sep 2026): power generated by source, 2025; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Form EIA-860 (released Sep 2026): power plants proposed for 2026 to 2030; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): Form EIA-860 (released Sep 2026): power plant capacity by state, 2025; retrieved October 31, 2026.
    • U.S. Energy Information Administration (EIA): thermoelectric cooling water data 2024, Forms EIA-860 and EIA-923 (retrieved Oct 2026): power plant cooling water by state.
    • FEMA: National Risk Index v1.20 (December 2025), NRI_Table_Counties and NRI_Table_States: natural hazard ratings by county and expected annual loss by state; retrieved October 31, 2026. This product uses the Federal Emergency Management Agency's OpenFEMA API, but is not endorsed by FEMA. The Federal Government or FEMA cannot vouch for the data or analyses derived from these data after the data have been retrieved from the Agency's website(s).
    • U.S. Census Bureau: US Census Bureau, Vintage 2025 county population estimates (co-est2025-alldata.csv): people by county.

    How CamsAhead counts cameras · Report a problem · Report a camera

    Add CamsAhead to your Home Screen Open in Safari to install Drive works best from your Home Screen Open in Safari to add it to your Home Screen

    It opens straight to the map.

    This app’s built-in browser can’t add CamsAhead to your Home Screen.

    From your Home Screen, CamsAhead opens full screen with one tap. It keeps the screen on while you drive, where your phone allows it.

    1. Tap Share
      In Safari’s toolbar, or in its ⋯ menu.
    2. Tap Share
      In your browser’s address bar or menu.
    3. Open this page in Safari
      Look for “Open in Safari” or “Open in browser” in this app’s menu, or copy the link.
    4. Copy the link, then paste it in Safari
      Or type CamsAhead.com in Safari.
    5. In Safari, tap Share, then Add to Home Screen
    6. Tap Add to Home Screen
      Scroll down the list if you don’t see it.
    7. Open the ⋮ menu
      Then tap “Add to Home screen” or “Install app”.
    8. Tap Add, then open CamsAhead from your Home Screen. Tap Install, then open CamsAhead from your Home Screen.

    Don’t see Add to Home Screen? Open this page in Safari.

    Or tap Share in this browser, then Add to Home Screen.

    Alerts work while CamsAhead is open on screen, from the Home Screen or the browser. If the screen locks or you switch apps, they stop.

    DriveBetaReport a problem